This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.
Adenuga, O. A. (2013). Comparison of the performance of traditional and direct labour methods of project procurement: A case study of some selected projects of the Nigerian army. Ethiopian Journal of Environmental Studies and Management, 6(1), pp. 12–30.AdenugaO. A.2013Comparison of the performance of traditional and direct labour methods of project procurement: A case study of some selected projects of the Nigerian army611230Search in Google Scholar
Afriyie, B. B. (2014). Factors influencing the selection of procurement methods for construction works in Ghana. A Thesis submitted to the Department of Building Technology in partial fulfilment of the requirements for the award of Master of Science (MSc) in Procurement Management, Kwame Nkrumah University of Science and Technology.AfriyieB. B.2014A Thesis submitted to the Department of Building Technology in partial fulfilment of the requirements for the award of Master of Science (MSc) in Procurement Management, Kwame Nkrumah University of Science and Technology.Search in Google Scholar
Aghimien, D. O., & Awodele, O. A. (2017). Variability of cost and time delivery of educational buildings in Nigeria. International Journal of Built Environment and Sustainability, 4(3), pp. 156–164.AghimienD. O.AwodeleO. A.2017Variability of cost and time delivery of educational buildings in Nigeria4315616410.11113/ijbes.v4.n3.208Search in Google Scholar
Aghimien, D. O., Awodele, O. A., Adegbembo, T. F., & Olatunji, S. O. (2017). Cost performance of educational buildings in Ondo State, Nigeria. In: Environmental Design and Management International Conference (EDMIC), 22–24 May, Obafemi Awolowo University, Ile-Ife, Nigeria, pp. 298–307.AghimienD. O.AwodeleO. A.AdegbemboT. F.OlatunjiS. O.2017InEnvironmental Design and Management International Conference (EDMIC)22–24 MayObafemi Awolowo UniversityIle-Ife, Nigeria298307Search in Google Scholar
Akindoyeni, A. (1989). The management of abandoned projects. Journal of the Nigerian Institute of Building, Maiden edition, 1(2), pp. 16–20.AkindoyeniA.1989The management of abandoned projectsMaiden edition121620Search in Google Scholar
Ashworth, A., & Hogg, K. (2007). Willis’s Practice and Procedure for Quantity Surveyor. Blackwell Publishing Ltd, Oxford, UK.AshworthA.HoggK.2007Blackwell Publishing LtdOxford, UKSearch in Google Scholar
Babatunde, S. O., Opawole, A., & Ujaddughe, I. C. (2010). An appraisal of project procurement methods in the Nigerian construction industry. Civil Engineering Dimension, 12(1), pp. 1–7.BabatundeS. O.OpawoleA.UjaddugheI. C.2010An appraisal of project procurement methods in the Nigerian construction industry12117Search in Google Scholar
Blaxter, L., Huges, C., & Tight, M. (2001). How to Research, 2nd edn. Open University Press, London, UK.BlaxterL.HugesC.TightM.20012nd ednOpen University PressLondon, UKSearch in Google Scholar
Brook, M. (2004). Estimating and Tendering for Construction Works. Elsevier Ltd, Oxford.BrookM.2004Elsevier LtdOxfordSearch in Google Scholar
Chan, A. P. C. (2001). Framework for Measuring Success of Construction Projects Report 2001-003C-01” In: School of Construction Management and Property Queensland University of Technology Brisbane, Australia.ChanA. P. C.2001Framework for Measuring Success of Construction Projects Report 2001-003C-01”In:AustraliaSearch in Google Scholar
Chan, C. T. W. (2007). Fuzzy procurement selection model for construction projects. Construction Management and Economics, 25(6), pp. 611–618.ChanC. T. W.2007Fuzzy procurement selection model for construction projects25661161810.1080/01446190701209933Search in Google Scholar
Cheung, S. O., Lam, T. I., Leung, M. Y., & Wan, Y. W. (2001). An analytical hierarchy process based procurement selection method. Construction Management and Economics, 19(4), pp. 427–437.CheungS. O.LamT. I.LeungM. Y.WanY. W.2001An analytical hierarchy process based procurement selection method19442743710.1080/014461901300132401Search in Google Scholar
Dada, M. O., & Oladokun, M. G. (2012). Analysis of critical success sub-factors for public-private partnership in Nigeria. Alam Cipta, 5(2), pp. 13–26.DadaM. O.OladokunM. G.2012Analysis of critical success sub-factors for public-private partnership in Nigeria521326Search in Google Scholar
Davis, P., Love, P., & Baccarini, D. (2008). Building Procurement Methods. CRC for Construction Innovation, Brisbane.DavisP.LoveP.BaccariniD.2008CRC for Construction InnovationBrisbaneSearch in Google Scholar
Edmond, W. M., Albert, P. C., & Daniel, W. M. (2008). Determinants of successful design-build projects. Journal of Construction Engineering and Management, 134(5), pp. 333–341.EdmondW. M.AlbertP. C.DanielW. M.2008Determinants of successful design-build projects134533334110.1061/(ASCE)0733-9364(2008)134:5(333)Search in Google Scholar
El-Agha, O. I. (2013). Factors affecting the selection of procurement methods in the construction projects in Gaza Strip. Thesis submitted in partial fulfilment of the requirement for Degree of Master of Science in Civil Engineering – Construction Management the Islamic University of Gaza.El-AghaO. I.2013Thesis submitted in partial fulfilment of the requirement for Degree of Master of Science in Civil Engineering – Construction Management the Islamic University of Gaza.Search in Google Scholar
Eyitope, A., Ojo, S., Ajibola, M., & Gbadebo, R., (2012). Critical selection criteria for appropriate procurement strategy for project delivery in Nigeria. Journal of Emerging Trends in Economics and Management Sciences, 3(5), pp. 422–428.EyitopeA.OjoS.AjibolaM.GbadeboR.2012Critical selection criteria for appropriate procurement strategy for project delivery in Nigeria35422428Search in Google Scholar
Hibberd, P. R., & Djebarni, R. (1996). Criteria of choice for procurement method. In: Proceedings: RICS Construction Research Conference (COBRA), held in University of West England, Bristol city, 19–20 September.HibberdP. R.DjebarniR.1996InProceedings: RICS Construction Research Conference (COBRA), held in University of West EnglandBristol city19–20 SeptemberSearch in Google Scholar
Idoro, G., & Iyagba, R. (2008). A comparative study of the use of procurement systems in the construction industry of Finland and Nigeria. The Professional Builder, 6(4), 34–37.IdoroG.IyagbaR.2008A comparative study of the use of procurement systems in the construction industry of Finland and Nigeria643437Search in Google Scholar
Idoro, G. I., Iyagba, R. O. A., & Odusami, K. T. (2007). Client’s characteristics and the use of direct labour system in the Nigerian construction industry. In: Proceedings: RIC Construction Research Conference (COBRA), Georgia Tech, Atlanta, USA, 6–7 September.IdoroG. I.IyagbaR. O. A.OdusamiK. T.2007InProceedings: RIC Construction Research Conference (COBRA)Georgia Tech, Atlanta, USA6–7 SeptemberSearch in Google Scholar
Inuwa, I. I., Wanyona, G., & Diang’a, S. (2014). Construction procurement systems: influencing factors for Nigerian indigenous contractors’ project planning. International Journal of Engineering Research & Technology, 3(4), 1043–1050.InuwaI. I.WanyonaG.Diang’aS.2014Construction procurement systems: influencing factors for Nigerian indigenous contractors’ project planning3410431050Search in Google Scholar
Kadiri, D. S., & Odusami, K. T. (2003). Comparative study of time and cost performance of direct labour and labour only procurement systems. The Quantity Surveyor, 44(3), pp. 9–16.KadiriD. S.OdusamiK. T.2003Comparative study of time and cost performance of direct labour and labour only procurement systems443916Search in Google Scholar
Larmour, J. (2011). A Study of Procurement Routes and their Use in the Commercial Sector. PhD thesis, Interdisciplinary Design for the Built Environment.LarmourJ.2011PhD thesisInterdisciplinary Design for the Built EnvironmentSearch in Google Scholar
Love, P. E. D., Skitmore, M., & Earl, G. (1998). Selecting an appropriate procurement method for the construction process: An empirical study. Construction Management and Economics, 16(2), pp. 221–233.LoveP. E. D.SkitmoreM.EarlG.1998Selecting an appropriate procurement method for the construction process: An empirical study16222123310.1080/014461998372501Search in Google Scholar
Luu, D. T., Ng, S. T., & Chen, S. E. (2005). Formulating procurement selection criteria through case based reasoning approach. Journal of Computing in Civil Engineering, 19(3), pp. 269–276.LuuD. T.NgS. T.ChenS. E.2005Formulating procurement selection criteria through case based reasoning approach19326927610.1061/(ASCE)0887-3801(2005)19:3(269)Search in Google Scholar
Mahon, C. (2011). Key Procurement Selection Criteria of Auckland Interior Fitout Clients: An Empirical Study. A Report for Industry Project CONS 7819 Submitted in Partial Fulfilment of the Requirements for the Degree of Bachelor of Construction, Unitec New Zealand, Auckland.MahonC.2011A Report for Industry Project CONS 7819 Submitted in Partial Fulfilment of the Requirements for the Degree of Bachelor of Construction, Unitec New Zealand, Auckland.Search in Google Scholar
Maizon, H., Mellisa, C., Tay, L., Shim, M., Ng, C., & Ng, S. (2006). Factors influencing the selection of procurement systems by client. In: Proceedings: International Conference on Construction Industry, Padang, Indonesia, 21–25 June.MaizonH.MellisaC.TayL.ShimM.NgC.NgS.2006InProceedings: International Conference on Construction IndustryPadang, Indonesia21–25 JuneSearch in Google Scholar
Masterman, J. W. E. (1996). Building Procurement Systems: An Introduction. E & FN Spon, London.MastermanJ. W. E.1996E & FN SponLondonSearch in Google Scholar
Memon, A. H., Rahman, I. A., Abdullah, M. R., & Azis, A. A. (2010). Factors affecting construction cost performance in project management projects: Case of Mara large projects. In: Proceedings of Post Graduate Seminar on Engineering, Technology and Social Science. Universiti Tun Hussein Onn Malaysia, Johor.MemonA. H.RahmanI. A.AbdullahM. R.AzisA. A.2010InProceedings of Post Graduate Seminar on Engineering, Technology and Social ScienceUniversiti Tun Hussein Onn MalaysiaJohorSearch in Google Scholar
Memon, A. H., Rahman, I. A., Abdullah, M. R., & Azis, A. A. (2012). The cause factors of large project’s cost overrun: A survey in the southern part of peninsular. International Journal of Real Estate Studies, 7(2), pp. 1–15.MemonA. H.RahmanI. A.AbdullahM. R.AzisA. A.2012The cause factors of large project’s cost overrun: A survey in the southern part of peninsular72115Search in Google Scholar
Moser, C. A., & Kalton, G. (1999). Survey Methods in Social Investigation, 2nd edn. Gower Publishing Company Ltd, Aldershot.MoserC. A.KaltonG.19992nd ednGower Publishing Company LtdAldershotSearch in Google Scholar
National Institute of Building Sciences. (2013). Estimating Methods. Available at www.nibs.org/%3Fpage%3Dconference.National Institute of Building Sciences2013Available at www.nibs.org/%3Fpage%3Dconference.Search in Google Scholar
Ng, T., Luu, C., & Swee, C. (2002). Decision criteria and their subjectivity in construction procurement selection. The Australian Journal of Construction Economics and Building, 2(1), pp. 70–80.NgT.LuuC.SweeC.2002Decision criteria and their subjectivity in construction procurement selection21708010.5130/AJCEB.v2i1.2888Search in Google Scholar
Odeyinka, H. A., & Yusif, A. (1997). The causes and effect of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management Property and Construction, 2(3), pp. 31–44.OdeyinkaH. A.YusifA.1997The causes and effect of construction delays on completion cost of housing projects in Nigeria233144Search in Google Scholar
Odusami, K. T. (2001). Project team leadership and construction project performance in some selected states in Nigeria. PhD thesis, Department of Building, University of Lagos, Akoka, Yaba, Lagos, Nigeria.OdusamiK. T.2001PhD thesisDepartment of Building, University of LagosAkoka, Yaba, Lagos, NigeriaSearch in Google Scholar
Ogunsemi, D. R. (2015). Value for Money in Construction Projects: The Quantity Surveyor’s Quest. 71st Inaugural Lecture delivered by Prof. D.R. Ogunsemi at the 2500 Capacity Auditorium, Federal University of Technology, Akure, Ondo State.OgunsemiD. R.201571st Inaugural Lecture delivered by Prof. D.R. Ogunsemi at the 2500 Capacity AuditoriumFederal University of TechnologyAkure, Ondo StateSearch in Google Scholar
Ogunsemi, D. R., & Jagboro, G. O. (2006). Time-cost model for building projects in Nigeria. Construction Management and Economics, 24, pp. 253–258.OgunsemiD. R.JagboroG. O.2006Time-cost model for building projects in Nigeria2425325810.1080/01446190500521041Search in Google Scholar
Ogunsemi, D. R., & Saka, N. (2006). The NEPAD initiative and the challenge of efficient cost management of infrastructure development in Nigeria. In: Paper Presented at the 22nd Biennial Conference of the Nigeria Institute of Quantity Surveyors, Calabar, 22–25 November.OgunsemiD. R.SakaN.2006InPaper Presented at the 22nd Biennial Conference of the Nigeria Institute of Quantity SurveyorsCalabar22–25 NovemberSearch in Google Scholar
Okunlola, O. J. O. S. (2012). PROMA - A decision support system to determine appropriate procurement method. Applied Sciences, Engineering and Technology, 4(4), pp. 316–321.OkunlolaO. J. O. S.2012PROMA - A decision support system to determine appropriate procurement method44316321Search in Google Scholar
Oladinrin, O. T., Olatunji, S. O., & Hamza, B. T. (2013). Effect of selected procurement systems on building project performance in Nigeria. International Journal of Sustainable Construction Engineering & Technology, 4(1), pp. 48–62.OladinrinO. T.OlatunjiS. O.HamzaB. T.2013Effect of selected procurement systems on building project performance in Nigeria414862Search in Google Scholar
Oluwakiyesi, T. (2011). Construction industry report: A haven of opportunities. Vitiva Research, Vitiva Capital Management Limited, pp. 1–48.OluwakiyesiT.2011Construction industry report: A haven of opportunitiesVitiva Capital Management Limited148Search in Google Scholar
Omoregie, A., & Radford, D. (2006). Infrastructure delays and cost escalation: Causes and effects in Nigeria. In: Proceeding of Sixth International Postgraduate Research Conference, Delft University of Technology, held in city of Delft, Netherlands, Published by International council for Research and Innovation in Building and Construction, pp. 79–93.OmoregieA.RadfordD.2006Infrastructure delays and cost escalation: Causes and effects in NigeriaInDelft University of Technology, held in city of DelftNetherlandsPublished by International council for Research and Innovation in Building and Construction7993Search in Google Scholar
Pallant, J. (2005). SPSS Survival Manual: A Step by Step Guide to Data Analysis Using SPSS for Windows (Version 12). Allen & Unwin, Crows Nest, NSW, Australia.PallantJ.2005Allen & UnwinCrows Nest, NSW, AustraliaSearch in Google Scholar
Ratnasabapathy, S., Rameezdeen, R., & Gamage, I. (2006). Macro level factors affecting the construction procurement selection: A multi criteria model. In: Dulaimi, M. (ed.), Proceedings of the Joint International Conference on Construction Culture, Innovation and Management (CCIM), held on 26–29 November, Dubai, United Arab Emirates. Rotterdam (Netherlands): In-House publishing.RatnasabapathyS.RameezdeenR.GamageI.2006InDulaimiM(ed.)Proceedings of the Joint International Conference on Construction Culture, Innovation and Management (CCIM)26–29 NovemberDubai, United Arab EmiratesRotterdam (Netherlands)In-House publishingSearch in Google Scholar
Sarah, L., Stanley, C., & Hugh, C. (2007). Which Contract? Choosing the Appropriate Building Contract. RIBA Publishing, UK.SarahL.StanleyC.HughC.2007RIBA PublishingUKSearch in Google Scholar
Seeley, I. H. (1997). Quantity Surveying Practice. Macmillan Publishers Ltd, London.SeeleyI. H.1997Macmillan Publishers LtdLondon10.1007/978-1-349-14402-0Search in Google Scholar
Seng, N. W., & Yusof, A. M. (2006). The success factors of design and build procurement method: A literature visits. In: Proceedings of the 6th Asia-Pacific Structural Engineering and Construction Conference, held at Kuala Lampur, Malaysia, September 5–6, pp. 1–11.SengN. W.YusofA. M.2006InProceedings of the 6th Asia-Pacific Structural Engineering and Construction ConferenceKuala Lampur, MalaysiaSeptember 5–6111Search in Google Scholar
Shiyamini, R., Rameezdeen, R., & Lebbe, N., (2008). Exploratory study of external environmental factors influencing the procurement selection in construction. In: Proceedings of the CIB International Conference on Building Education and Research, Kandalama, Sri Lanka.ShiyaminiR.RameezdeenR.LebbeN.2008InProceedings of the CIB International Conference on Building Education and ResearchKandalama, Sri LankaSearch in Google Scholar