INFORMAZIONI SU QUESTO ARTICOLO

Cita

Adenuga, O. A. (2013). Comparison of the performance of traditional and direct labour methods of project procurement: A case study of some selected projects of the Nigerian army. Ethiopian Journal of Environmental Studies and Management, 6(1), pp. 12–30.AdenugaO. A.2013Comparison of the performance of traditional and direct labour methods of project procurement: A case study of some selected projects of the Nigerian armyEthiopian Journal of Environmental Studies and Management611230Search in Google Scholar

Afriyie, B. B. (2014). Factors influencing the selection of procurement methods for construction works in Ghana. A Thesis submitted to the Department of Building Technology in partial fulfilment of the requirements for the award of Master of Science (MSc) in Procurement Management, Kwame Nkrumah University of Science and Technology.AfriyieB. B.2014Factors influencing the selection of procurement methods for construction works in GhanaA Thesis submitted to the Department of Building Technology in partial fulfilment of the requirements for the award of Master of Science (MSc) in Procurement Management, Kwame Nkrumah University of Science and Technology.Search in Google Scholar

Aghimien, D. O., & Awodele, O. A. (2017). Variability of cost and time delivery of educational buildings in Nigeria. International Journal of Built Environment and Sustainability, 4(3), pp. 156–164.AghimienD. O.AwodeleO. A.2017Variability of cost and time delivery of educational buildings in NigeriaInternational Journal of Built Environment and Sustainability4315616410.11113/ijbes.v4.n3.208Search in Google Scholar

Aghimien, D. O., Awodele, O. A., Adegbembo, T. F., & Olatunji, S. O. (2017). Cost performance of educational buildings in Ondo State, Nigeria. In: Environmental Design and Management International Conference (EDMIC), 22–24 May, Obafemi Awolowo University, Ile-Ife, Nigeria, pp. 298–307.AghimienD. O.AwodeleO. A.AdegbemboT. F.OlatunjiS. O.2017Cost performance of educational buildings in Ondo State, NigeriaInEnvironmental Design and Management International Conference (EDMIC)22–24 MayObafemi Awolowo UniversityIle-Ife, Nigeria298307Search in Google Scholar

Akindoyeni, A. (1989). The management of abandoned projects. Journal of the Nigerian Institute of Building, Maiden edition, 1(2), pp. 16–20.AkindoyeniA.1989The management of abandoned projectsJournal of the Nigerian Institute of BuildingMaiden edition121620Search in Google Scholar

Ashworth, A., & Hogg, K. (2007). Willis’s Practice and Procedure for Quantity Surveyor. Blackwell Publishing Ltd, Oxford, UK.AshworthA.HoggK.2007Willis’s Practice and Procedure for Quantity SurveyorBlackwell Publishing LtdOxford, UKSearch in Google Scholar

Babatunde, S. O., Opawole, A., & Ujaddughe, I. C. (2010). An appraisal of project procurement methods in the Nigerian construction industry. Civil Engineering Dimension, 12(1), pp. 1–7.BabatundeS. O.OpawoleA.UjaddugheI. C.2010An appraisal of project procurement methods in the Nigerian construction industryCivil Engineering Dimension12117Search in Google Scholar

Blaxter, L., Huges, C., & Tight, M. (2001). How to Research, 2nd edn. Open University Press, London, UK.BlaxterL.HugesC.TightM.2001How to Research2nd ednOpen University PressLondon, UKSearch in Google Scholar

Brook, M. (2004). Estimating and Tendering for Construction Works. Elsevier Ltd, Oxford.BrookM.2004Estimating and Tendering for Construction WorksElsevier LtdOxfordSearch in Google Scholar

Chan, A. P. C. (2001). Framework for Measuring Success of Construction Projects Report 2001-003C-01” In: School of Construction Management and Property Queensland University of Technology Brisbane, Australia.ChanA. P. C.2001Framework for Measuring Success of Construction Projects Report 2001-003C-01”In:School of Construction Management and Property Queensland University of Technology BrisbaneAustraliaSearch in Google Scholar

Chan, C. T. W. (2007). Fuzzy procurement selection model for construction projects. Construction Management and Economics, 25(6), pp. 611–618.ChanC. T. W.2007Fuzzy procurement selection model for construction projectsConstruction Management and Economics25661161810.1080/01446190701209933Search in Google Scholar

Cheung, S. O., Lam, T. I., Leung, M. Y., & Wan, Y. W. (2001). An analytical hierarchy process based procurement selection method. Construction Management and Economics, 19(4), pp. 427–437.CheungS. O.LamT. I.LeungM. Y.WanY. W.2001An analytical hierarchy process based procurement selection methodConstruction Management and Economics19442743710.1080/014461901300132401Search in Google Scholar

Dada, M. O., & Oladokun, M. G. (2012). Analysis of critical success sub-factors for public-private partnership in Nigeria. Alam Cipta, 5(2), pp. 13–26.DadaM. O.OladokunM. G.2012Analysis of critical success sub-factors for public-private partnership in NigeriaAlam Cipta521326Search in Google Scholar

Davis, P., Love, P., & Baccarini, D. (2008). Building Procurement Methods. CRC for Construction Innovation, Brisbane.DavisP.LoveP.BaccariniD.2008Building Procurement MethodsCRC for Construction InnovationBrisbaneSearch in Google Scholar

Edmond, W. M., Albert, P. C., & Daniel, W. M. (2008). Determinants of successful design-build projects. Journal of Construction Engineering and Management, 134(5), pp. 333–341.EdmondW. M.AlbertP. C.DanielW. M.2008Determinants of successful design-build projectsJournal of Construction Engineering and Management134533334110.1061/(ASCE)0733-9364(2008)134:5(333)Search in Google Scholar

El-Agha, O. I. (2013). Factors affecting the selection of procurement methods in the construction projects in Gaza Strip. Thesis submitted in partial fulfilment of the requirement for Degree of Master of Science in Civil Engineering – Construction Management the Islamic University of Gaza.El-AghaO. I.2013Factors affecting the selection of procurement methods in the construction projects in Gaza StripThesis submitted in partial fulfilment of the requirement for Degree of Master of Science in Civil Engineering – Construction Management the Islamic University of Gaza.Search in Google Scholar

Eyitope, A., Ojo, S., Ajibola, M., & Gbadebo, R., (2012). Critical selection criteria for appropriate procurement strategy for project delivery in Nigeria. Journal of Emerging Trends in Economics and Management Sciences, 3(5), pp. 422–428.EyitopeA.OjoS.AjibolaM.GbadeboR.2012Critical selection criteria for appropriate procurement strategy for project delivery in NigeriaJournal of Emerging Trends in Economics and Management Sciences35422428Search in Google Scholar

Hibberd, P. R., & Djebarni, R. (1996). Criteria of choice for procurement method. In: Proceedings: RICS Construction Research Conference (COBRA), held in University of West England, Bristol city, 19–20 September.HibberdP. R.DjebarniR.1996Criteria of choice for procurement methodInProceedings: RICS Construction Research Conference (COBRA), held in University of West EnglandBristol city19–20 SeptemberSearch in Google Scholar

Idoro, G., & Iyagba, R. (2008). A comparative study of the use of procurement systems in the construction industry of Finland and Nigeria. The Professional Builder, 6(4), 34–37.IdoroG.IyagbaR.2008A comparative study of the use of procurement systems in the construction industry of Finland and NigeriaThe Professional Builder643437Search in Google Scholar

Idoro, G. I., Iyagba, R. O. A., & Odusami, K. T. (2007). Client’s characteristics and the use of direct labour system in the Nigerian construction industry. In: Proceedings: RIC Construction Research Conference (COBRA), Georgia Tech, Atlanta, USA, 6–7 September.IdoroG. I.IyagbaR. O. A.OdusamiK. T.2007Client’s characteristics and the use of direct labour system in the Nigerian construction industryInProceedings: RIC Construction Research Conference (COBRA)Georgia Tech, Atlanta, USA6–7 SeptemberSearch in Google Scholar

Inuwa, I. I., Wanyona, G., & Diang’a, S. (2014). Construction procurement systems: influencing factors for Nigerian indigenous contractors’ project planning. International Journal of Engineering Research & Technology, 3(4), 1043–1050.InuwaI. I.WanyonaG.Diang’aS.2014Construction procurement systems: influencing factors for Nigerian indigenous contractors’ project planningInternational Journal of Engineering Research & Technology3410431050Search in Google Scholar

Kadiri, D. S., & Odusami, K. T. (2003). Comparative study of time and cost performance of direct labour and labour only procurement systems. The Quantity Surveyor, 44(3), pp. 9–16.KadiriD. S.OdusamiK. T.2003Comparative study of time and cost performance of direct labour and labour only procurement systemsThe Quantity Surveyor443916Search in Google Scholar

Larmour, J. (2011). A Study of Procurement Routes and their Use in the Commercial Sector. PhD thesis, Interdisciplinary Design for the Built Environment.LarmourJ.2011A Study of Procurement Routes and their Use in the Commercial SectorPhD thesisInterdisciplinary Design for the Built EnvironmentSearch in Google Scholar

Love, P. E. D., Skitmore, M., & Earl, G. (1998). Selecting an appropriate procurement method for the construction process: An empirical study. Construction Management and Economics, 16(2), pp. 221–233.LoveP. E. D.SkitmoreM.EarlG.1998Selecting an appropriate procurement method for the construction process: An empirical studyConstruction Management and Economics16222123310.1080/014461998372501Search in Google Scholar

Luu, D. T., Ng, S. T., & Chen, S. E. (2005). Formulating procurement selection criteria through case based reasoning approach. Journal of Computing in Civil Engineering, 19(3), pp. 269–276.LuuD. T.NgS. T.ChenS. E.2005Formulating procurement selection criteria through case based reasoning approachJournal of Computing in Civil Engineering19326927610.1061/(ASCE)0887-3801(2005)19:3(269)Search in Google Scholar

Mahon, C. (2011). Key Procurement Selection Criteria of Auckland Interior Fitout Clients: An Empirical Study. A Report for Industry Project CONS 7819 Submitted in Partial Fulfilment of the Requirements for the Degree of Bachelor of Construction, Unitec New Zealand, Auckland.MahonC.2011Key Procurement Selection Criteria of Auckland Interior Fitout Clients: An Empirical StudyA Report for Industry Project CONS 7819 Submitted in Partial Fulfilment of the Requirements for the Degree of Bachelor of Construction, Unitec New Zealand, Auckland.Search in Google Scholar

Maizon, H., Mellisa, C., Tay, L., Shim, M., Ng, C., & Ng, S. (2006). Factors influencing the selection of procurement systems by client. In: Proceedings: International Conference on Construction Industry, Padang, Indonesia, 21–25 June.MaizonH.MellisaC.TayL.ShimM.NgC.NgS.2006Factors influencing the selection of procurement systems by clientInProceedings: International Conference on Construction IndustryPadang, Indonesia21–25 JuneSearch in Google Scholar

Masterman, J. W. E. (1996). Building Procurement Systems: An Introduction. E & FN Spon, London.MastermanJ. W. E.1996Building Procurement Systems: An IntroductionE & FN SponLondonSearch in Google Scholar

Memon, A. H., Rahman, I. A., Abdullah, M. R., & Azis, A. A. (2010). Factors affecting construction cost performance in project management projects: Case of Mara large projects. In: Proceedings of Post Graduate Seminar on Engineering, Technology and Social Science. Universiti Tun Hussein Onn Malaysia, Johor.MemonA. H.RahmanI. A.AbdullahM. R.AzisA. A.2010Factors affecting construction cost performance in project management projects: Case of Mara large projectsInProceedings of Post Graduate Seminar on Engineering, Technology and Social ScienceUniversiti Tun Hussein Onn MalaysiaJohorSearch in Google Scholar

Memon, A. H., Rahman, I. A., Abdullah, M. R., & Azis, A. A. (2012). The cause factors of large project’s cost overrun: A survey in the southern part of peninsular. International Journal of Real Estate Studies, 7(2), pp. 1–15.MemonA. H.RahmanI. A.AbdullahM. R.AzisA. A.2012The cause factors of large project’s cost overrun: A survey in the southern part of peninsularInternational Journal of Real Estate Studies72115Search in Google Scholar

Moser, C. A., & Kalton, G. (1999). Survey Methods in Social Investigation, 2nd edn. Gower Publishing Company Ltd, Aldershot.MoserC. A.KaltonG.1999Survey Methods in Social Investigation2nd ednGower Publishing Company LtdAldershotSearch in Google Scholar

National Institute of Building Sciences. (2013). Estimating Methods. Available at www.nibs.org/%3Fpage%3Dconference.National Institute of Building Sciences2013Estimating MethodsAvailable at www.nibs.org/%3Fpage%3Dconference.Search in Google Scholar

Ng, T., Luu, C., & Swee, C. (2002). Decision criteria and their subjectivity in construction procurement selection. The Australian Journal of Construction Economics and Building, 2(1), pp. 70–80.NgT.LuuC.SweeC.2002Decision criteria and their subjectivity in construction procurement selectionThe Australian Journal of Construction Economics and Building21708010.5130/AJCEB.v2i1.2888Search in Google Scholar

Odeyinka, H. A., & Yusif, A. (1997). The causes and effect of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management Property and Construction, 2(3), pp. 31–44.OdeyinkaH. A.YusifA.1997The causes and effect of construction delays on completion cost of housing projects in NigeriaJournal of Financial Management Property and Construction233144Search in Google Scholar

Odusami, K. T. (2001). Project team leadership and construction project performance in some selected states in Nigeria. PhD thesis, Department of Building, University of Lagos, Akoka, Yaba, Lagos, Nigeria.OdusamiK. T.2001Project team leadership and construction project performance in some selected states in NigeriaPhD thesisDepartment of Building, University of LagosAkoka, Yaba, Lagos, NigeriaSearch in Google Scholar

Ogunsemi, D. R. (2015). Value for Money in Construction Projects: The Quantity Surveyor’s Quest. 71st Inaugural Lecture delivered by Prof. D.R. Ogunsemi at the 2500 Capacity Auditorium, Federal University of Technology, Akure, Ondo State.OgunsemiD. R.2015Value for Money in Construction Projects: The Quantity Surveyor’s Quest71st Inaugural Lecture delivered by Prof. D.R. Ogunsemi at the 2500 Capacity AuditoriumFederal University of TechnologyAkure, Ondo StateSearch in Google Scholar

Ogunsemi, D. R., & Jagboro, G. O. (2006). Time-cost model for building projects in Nigeria. Construction Management and Economics, 24, pp. 253–258.OgunsemiD. R.JagboroG. O.2006Time-cost model for building projects in NigeriaConstruction Management and Economics2425325810.1080/01446190500521041Search in Google Scholar

Ogunsemi, D. R., & Saka, N. (2006). The NEPAD initiative and the challenge of efficient cost management of infrastructure development in Nigeria. In: Paper Presented at the 22nd Biennial Conference of the Nigeria Institute of Quantity Surveyors, Calabar, 22–25 November.OgunsemiD. R.SakaN.2006The NEPAD initiative and the challenge of efficient cost management of infrastructure development in NigeriaInPaper Presented at the 22nd Biennial Conference of the Nigeria Institute of Quantity SurveyorsCalabar22–25 NovemberSearch in Google Scholar

Okunlola, O. J. O. S. (2012). PROMA - A decision support system to determine appropriate procurement method. Applied Sciences, Engineering and Technology, 4(4), pp. 316–321.OkunlolaO. J. O. S.2012PROMA - A decision support system to determine appropriate procurement methodApplied Sciences, Engineering and Technology44316321Search in Google Scholar

Oladinrin, O. T., Olatunji, S. O., & Hamza, B. T. (2013). Effect of selected procurement systems on building project performance in Nigeria. International Journal of Sustainable Construction Engineering & Technology, 4(1), pp. 48–62.OladinrinO. T.OlatunjiS. O.HamzaB. T.2013Effect of selected procurement systems on building project performance in NigeriaInternational Journal of Sustainable Construction Engineering & Technology414862Search in Google Scholar

Oluwakiyesi, T. (2011). Construction industry report: A haven of opportunities. Vitiva Research, Vitiva Capital Management Limited, pp. 1–48.OluwakiyesiT.2011Construction industry report: A haven of opportunitiesVitiva ResearchVitiva Capital Management Limited148Search in Google Scholar

Omoregie, A., & Radford, D. (2006). Infrastructure delays and cost escalation: Causes and effects in Nigeria. In: Proceeding of Sixth International Postgraduate Research Conference, Delft University of Technology, held in city of Delft, Netherlands, Published by International council for Research and Innovation in Building and Construction, pp. 79–93.OmoregieA.RadfordD.2006Infrastructure delays and cost escalation: Causes and effects in NigeriaInProceeding of Sixth International Postgraduate Research ConferenceDelft University of Technology, held in city of DelftNetherlandsPublished by International council for Research and Innovation in Building and Construction7993Search in Google Scholar

Pallant, J. (2005). SPSS Survival Manual: A Step by Step Guide to Data Analysis Using SPSS for Windows (Version 12). Allen & Unwin, Crows Nest, NSW, Australia.PallantJ.2005SPSS Survival Manual: A Step by Step Guide to Data Analysis Using SPSS for Windows (Version 12)Allen & UnwinCrows Nest, NSW, AustraliaSearch in Google Scholar

Ratnasabapathy, S., Rameezdeen, R., & Gamage, I. (2006). Macro level factors affecting the construction procurement selection: A multi criteria model. In: Dulaimi, M. (ed.), Proceedings of the Joint International Conference on Construction Culture, Innovation and Management (CCIM), held on 26–29 November, Dubai, United Arab Emirates. Rotterdam (Netherlands): In-House publishing.RatnasabapathyS.RameezdeenR.GamageI.2006Macro level factors affecting the construction procurement selection: A multi criteria modelInDulaimiM(ed.)Proceedings of the Joint International Conference on Construction Culture, Innovation and Management (CCIM)26–29 NovemberDubai, United Arab EmiratesRotterdam (Netherlands)In-House publishingSearch in Google Scholar

Sarah, L., Stanley, C., & Hugh, C. (2007). Which Contract? Choosing the Appropriate Building Contract. RIBA Publishing, UK.SarahL.StanleyC.HughC.2007Which Contract? Choosing the Appropriate Building ContractRIBA PublishingUKSearch in Google Scholar

Seeley, I. H. (1997). Quantity Surveying Practice. Macmillan Publishers Ltd, London.SeeleyI. H.1997Quantity Surveying PracticeMacmillan Publishers LtdLondon10.1007/978-1-349-14402-0Search in Google Scholar

Seng, N. W., & Yusof, A. M. (2006). The success factors of design and build procurement method: A literature visits. In: Proceedings of the 6th Asia-Pacific Structural Engineering and Construction Conference, held at Kuala Lampur, Malaysia, September 5–6, pp. 1–11.SengN. W.YusofA. M.2006The success factors of design and build procurement method: A literature visitsInProceedings of the 6th Asia-Pacific Structural Engineering and Construction ConferenceKuala Lampur, MalaysiaSeptember 5–6111Search in Google Scholar

Shiyamini, R., Rameezdeen, R., & Lebbe, N., (2008). Exploratory study of external environmental factors influencing the procurement selection in construction. In: Proceedings of the CIB International Conference on Building Education and Research, Kandalama, Sri Lanka.ShiyaminiR.RameezdeenR.LebbeN.2008Exploratory study of external environmental factors influencing the procurement selection in constructionInProceedings of the CIB International Conference on Building Education and ResearchKandalama, Sri LankaSearch in Google Scholar

eISSN:
1847-6228
Lingua:
Inglese
Frequenza di pubblicazione:
Volume Open
Argomenti della rivista:
Engineering, Introductions and Overviews, other