[Abdul-Rahman, I., Memon, A. H., & Abd-Karim, A. T. (2013). Significant factors causing cost overruns in large construction projects in Malaysia. Journal of Applied Sciences, 13(2), pp. 286-293.10.3923/jas.2013.286.293]Search in Google Scholar
[Adejimi, A. (2005). Poor building maintenance in Nigeria: Are architects free from blame. In: Proceeding at the ENHIR International Conference on Housing: New Challenges and Innovations in Tomorrow’s Cities in Iceland, pp. 1-16. Available at https://borg.hi.is/enhr2005iceland/ppr/Adejimi.pdf on 06 June, 2017.]Search in Google Scholar
[Ahadzie, D. K., Proverbs, D. G., & Olomolaiye, P. O. (2008). Critical success criteria for mass house building projects in developing countries. International Journal of Project Management, 26, pp. 675-687.10.1016/j.ijproman.2007.09.006]Search in Google Scholar
[Ajayi, O., & Oyeyipo, O. (2015). Effect of rework on project performance in building project in Nigeria. International Journal of Engineering Research & Technology (IJERT), 4(02), pp. 294-300.]Search in Google Scholar
[Alreck, P. L., & Settle, R. B. (1985). The Survey Research Handbook. Richard D. Irwin, Inc, Homewood, Ill.]Search in Google Scholar
[Anil, A., & Danielraj, R. C. (2016). Analyze the causes and minimize the occurrence of rework in construction project. International Journal of Innovative Research in Science, Engineering & Technology, 5(4), pp. 6464-6467.]Search in Google Scholar
[Binyam, L., Emer, T. Q., & Yolente, C. M. (2016). Evaluation on the performance of lowest responsive bid contract and the quality of materials used on governmental building projects in Jimma town. International Journal of Scientific & Engineering Research, 7(12), pp. 60-73.]Search in Google Scholar
[Cheng, C. W. M., & Liu, A. M. M. (2007). The relationship of organizational culture and the implementation of total quality management in construction firms. Surveying and Built Environment, 18(1), pp. 7-16.]Search in Google Scholar
[Chindo, P. G., & Adogbo, K. J. (2011). Investigation into the use of total quality management in Nigerian construction industry: A case study of large and medium size firms. In: Laryea, S., Leiringer, R., & Hughes, W. (eds.), Proceedings of the West Africa Built Environment Research (WABER) Conference, Accra, Ghana, 19-21 July 2011, pp. 683-690.]Search in Google Scholar
[Clough, R., Sears, G., & Sears, S. (2005). “Construction Contracting, Seventh Edition”, A Practical Guide to Company Management.]Search in Google Scholar
[Costello, A. B., & Jason, O. (2005). Best practices in exploratory factor analysis: Four recommendations for getting the most from your analysis. Practical Assessment Research & Evaluation, 10(7). Available online: http://pareonline.net/getvn.asp?v=10&n=7.]Search in Google Scholar
[Cusack, D. (1992). Implementation of ISO 9000 in construction. In: ISO 9000 Forum Symposium, the International Group for Lean Construction, Gold Coast, Australia, pp. 157-167.]Search in Google Scholar
[Dalty, C. D., & Crawshaw, D. T. (1973). “Working Drawings in Use”, Building Research Establishment, Current Paper CP 18/73, Watford, UK.]Search in Google Scholar
[Davis, K., Ledbetter, W. B., & Buratti, J. L. (1989). Measuring design and construction quality costs. ASCE Journal of Construction Engineering and Management, 115(3), pp. 389-400.10.1061/(ASCE)0733-9364(1989)115:3(385)]Search in Google Scholar
[Enshassi, A., Sundermeier, M., & Zeiter, M. A. (2017). Factors contributing to rework and their impact on construction projects performance. International Journal of Sustainable Construction Engineering & Technology, 8(1), pp. 12-33.]Search in Google Scholar
[Fellows, R. R., & Liu, A. (2008). ). Research Methods for Construction, 3rd edn. Wiley-Blackwell Science, London.]Search in Google Scholar
[Hair, J. F., Anderson, R. E., Tathan, R. L., & Black, W. C. (1998). Multivariate Data Analysis, 5th edn. Prentice Hall, Upper Saddle River, NJ.]Search in Google Scholar
[Harrington, J., Voehl, F., & Wiggin, H. (2012). Applying TQM to the construction industry. The TQM Journal, 24(4), pp. 352-362. https://doi.org/10.1108/17542731211247373.10.1108/17542731211247373]Open DOISearch in Google Scholar
[Hwang, B. G., Thomas, S. R., Haas, C. T., & Caldas, C. H. (2009). Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135(3), pp. 187-198.10.1061/(ASCE)0733-9364(2009)135:3(187)]Search in Google Scholar
[Josephson, P., Larsson, B., & Li, H. (2002). Illustrative benchmarking rework and rework costs in Swedish construction industry. Journal of Management Engineering, 18(2), pp. 76-83.10.1061/(ASCE)0742-597X(2002)18:2(76)]Search in Google Scholar
[Khan, H. J. (2003). Impact of total quality management on productivity. The TQM Magazine, 15(6), pp. 374-380.10.1108/09544780310502705]Search in Google Scholar
[Koskela, L. (1992). Application of the new production philosophy to construction. In: Technical Report #72, Centre for Integrated Facility Engineering, Department of Civil Engineering, Stanford University. (1993). Lean Production in Construction. In the 10th International Symposium on Automation and Robotics in Construction (ISARC), Elsevier, USA, pp. 47-54.10.22260/ISARC1993/0007]Search in Google Scholar
[Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30, pp. 607-610.10.1177/001316447003000308]Search in Google Scholar
[Love, P. E. D. (2002). “Influence of project type and procurement method of rework costs in building construction projects. Journal of Construction Engineering and Management, 128(1), pp. 1-29.10.1061/(ASCE)0733-9364(2002)128:1(18)]Search in Google Scholar
[Love, P. E. D., Davis, P. R., Ellis, J. M., & Cheung, S. O. (2010). Dispute causation: Identification of pathogenic influences. Engineering, Construction and Architectural Management, 17(4), pp. 404-423.10.1108/09699981011056592]Search in Google Scholar
[Love, P., & Edwards, D. (2004). “Determinants of rework in building construction projects. Engineering, Construction and Architectural Management, 11(4), pp. 259-274.10.1108/09699980410547612]Search in Google Scholar
[Love, P. E., Edwards, D. F., & Sohal, A. (2004). Total quality management in Australian contracting organization: Pre-conditions for successful implementation. Engineering, Construction and Architectural Management, 11(3), pp. 189-198.10.1108/09699980410535796]Search in Google Scholar
[Love, P. E. D., Holt, G. D., Shen, L. Y., Li, H., & Irani, Z. (2002). Using systems dynamics to better understand change and rework in construction project, management systems. International Journal of Project Management, 20(6), pp. 425-436.10.1016/S0263-7863(01)00039-4]Search in Google Scholar
[Love, P. E. D., Mandal, P., & Li, H. (1999). Determining the causal structure of rework in construction projects. Construction Management and Economics, 17(4), pp. 505-517.10.1080/014461999371420]Search in Google Scholar
[Love, P., Mandal, P., Smith, J., & Georgiou, J. (2000). “DECOEM: A design and construction rework minimization model. In: 1st International Conference on Systems Thinking in Management, Geelong.]Search in Google Scholar
[Love, P. E. D., & Smith, J. (2003). Benchmarking, bench-action and bench-learning: Rework mitigation in projects. ASCE Journal of Management in Engineering, 19(4), pp. 147-159.10.1061/(ASCE)0742-597X(2003)19:4(147)]Search in Google Scholar
[Love, P. E., & Sohal, A. S. (2003). Capturing rework costs in projects. Managerial Auditing Journal, 18(4), pp. 329-339.10.1108/02686900310474343]Search in Google Scholar
[Low, S. P., & Peh, K. W. (1996). A framework for implementing total quality management in construction. The TQM Magazine, 8(5), pp. 39-46.10.1108/09544789610146033]Search in Google Scholar
[Low, S. P., & Teo, J. A. (2004). Implementing total quality management in construction firms. Journal of Management in Engineering, 20(1), pp. 8-15.10.1061/(ASCE)0742-597X(2004)20:1(8)]Search in Google Scholar
[Mahamid, I. (2016). Analysis of rework in residential building projects in Palestine. Jordan Journal of Civil Engineering, 10(2), pp. 197-208.10.14525/JJCE.10.1.3536]Search in Google Scholar
[Mastenbroek, Y. C. (2010). Reducing rework costs in construction projects. Published Bsc thesis, University of Twente, San Pedro Sula, Honduras. Available at http://purl.utwente.nl/essays/59691 on 10 July, 2017.]Search in Google Scholar
[McIntyre, C., & Kirschenman, M. (2000). Survey of total quality management in construction industry in upper Midwest. Journal of Management in Engineering, 16(5), pp. 67-70.10.1061/(ASCE)0742-597X(2000)16:5(67)]Search in Google Scholar
[Meshksar, S. (2012). Cost and time impacts of reworks in building a reinforced concrete structure. Master thesis, North Cyprus, Gazimagusa: Eastern Mediterranean University. Available at http://hdl.handle.net/11129/290 on 7 June, 2017.]Search in Google Scholar
[Mundfrom, D. J., Shaw, D. G., & Ke, T. L. (2005). Minimum sample size recommendations for conducting factor analyses. International Journal of Testing, 5(2), pp. 159-168.10.1207/s15327574ijt0502_4]Search in Google Scholar
[Oyewobi, L. O., & Ogunsemi, D. R. (2010). Factors influencing rework occurrence in construction: A study of selected building projects in Nigeria. Journal of Building Performance, 1(1), pp. 1-20.]Search in Google Scholar
[Palaneeswaran, E. (2006). Reducing rework to enhance project performance levels. In: Proceedings of the One Day Seminar on “Recent Developments in Project Management in Hong Kong.]Search in Google Scholar
[Pallant, J. (2007). SPSS Survival Manual: A Step-By-Step Guide to Data Analysis Using SPSS” Version 15, 3rd edn. Open university Press, England.]Search in Google Scholar
[Peter, H., Pascale, C., & Todd, L. (2010). Barriers and benefits of quality management in the construction industry: An empirical study. Total Quality Management., 21(9), pp. 953-969.10.1080/14783363.2010.487673]Search in Google Scholar
[Preacher, K. J., & MacCallum, R. C. (2002). Exploratory factor analysis in behaviour genetics research: Factor recovery with small sample sizes. Behaviour Genetics, 32, pp. 153-161.10.1023/A:1015210025234]Search in Google Scholar
[Rounce, G. (1998). Quality, waste, and cost consideration in architectural building design management. International Journal of Project Management, 16(2), pp. 123-127.10.1016/S0263-7863(97)00042-2]Search in Google Scholar
[Saidu, I., & Shakantu, W. M. (2016b). The contributions of material waste to project-cost overrun in Abuja, Nigeria. Acta Structilia, 23(1), pp. 99-113.10.18820/24150487/as23i1.4]Search in Google Scholar
[Saidu, I., & Shakantu, W. M. W. (2016a). “A study of the relationship between material waste and cost overruns in the construction industry. In: Windapo, A. O. (ed.), The 9th CIDB Postgraduate Conference Cape Town, South Africa. Emerging Trends in Construction Organizational Practices and Project-Management Knowledge Area. 2-4 February, 2016, pp. 124-134]Search in Google Scholar
[Simpeh, E. K. (2012). An analysis of the causes and impact of rework in construction projects. A Thesis submitted Cape Peninsula University of Technology, South Africa. Available at http://hdl.handle.net/11189/1054 on 10 December, 2016.]Search in Google Scholar
[Spacey, J. (2016). What is a risk trigger? Available at http://simplicable.com/new/risk-trigger on 8 March, 2017.]Search in Google Scholar
[Spector, P. (1992). Summated Rating Scale Construction: An Introduction. Sage Publications, Newbury Park, CA.10.4135/9781412986038]Search in Google Scholar
[Tabachnick, B. G., & Fidell, L. S. (2007). Using Multivariate Statistics, 5th edn. Pearson Education Inc, Boston, MA.]Search in Google Scholar
[Wasfy, M. A. F. (2010). Severity and impact of rework, a case study of a residential commercial tower project in the Eastern Province-KSA. Master thesis. Dhahran, Saudi Arabia: King Fahd University of Petroleum & Minerals.]Search in Google Scholar
[Yong, G., & Pearce, S. (2013). A beginner’s guide to factor analysis: Focusing on exploratory factors analysis. Tutorials in Quantitative Methods for Psychology, 9(2), pp. 79-94.10.20982/tqmp.09.2.p079]Search in Google Scholar
[Zhao, N. (2008). The minimum sample size in factor analysis. Retrieved from: https://www.encorewiki.org/plugins/servlet/mobile#content/view/25657 on 15 December, 2016.]Search in Google Scholar