Cite

Abdul-Rahman, I., Memon, A. H., & Abd-Karim, A. T. (2013). Significant factors causing cost overruns in large construction projects in Malaysia. Journal of Applied Sciences, 13(2), pp. 286-293.10.3923/jas.2013.286.293Search in Google Scholar

Adejimi, A. (2005). Poor building maintenance in Nigeria: Are architects free from blame. In: Proceeding at the ENHIR International Conference on Housing: New Challenges and Innovations in Tomorrow’s Cities in Iceland, pp. 1-16. Available at https://borg.hi.is/enhr2005iceland/ppr/Adejimi.pdf on 06 June, 2017.Search in Google Scholar

Ahadzie, D. K., Proverbs, D. G., & Olomolaiye, P. O. (2008). Critical success criteria for mass house building projects in developing countries. International Journal of Project Management, 26, pp. 675-687.10.1016/j.ijproman.2007.09.006Search in Google Scholar

Ajayi, O., & Oyeyipo, O. (2015). Effect of rework on project performance in building project in Nigeria. International Journal of Engineering Research & Technology (IJERT), 4(02), pp. 294-300.Search in Google Scholar

Alreck, P. L., & Settle, R. B. (1985). The Survey Research Handbook. Richard D. Irwin, Inc, Homewood, Ill.Search in Google Scholar

Anil, A., & Danielraj, R. C. (2016). Analyze the causes and minimize the occurrence of rework in construction project. International Journal of Innovative Research in Science, Engineering & Technology, 5(4), pp. 6464-6467.Search in Google Scholar

Binyam, L., Emer, T. Q., & Yolente, C. M. (2016). Evaluation on the performance of lowest responsive bid contract and the quality of materials used on governmental building projects in Jimma town. International Journal of Scientific & Engineering Research, 7(12), pp. 60-73.Search in Google Scholar

Cheng, C. W. M., & Liu, A. M. M. (2007). The relationship of organizational culture and the implementation of total quality management in construction firms. Surveying and Built Environment, 18(1), pp. 7-16.Search in Google Scholar

Chindo, P. G., & Adogbo, K. J. (2011). Investigation into the use of total quality management in Nigerian construction industry: A case study of large and medium size firms. In: Laryea, S., Leiringer, R., & Hughes, W. (eds.), Proceedings of the West Africa Built Environment Research (WABER) Conference, Accra, Ghana, 19-21 July 2011, pp. 683-690.Search in Google Scholar

Clough, R., Sears, G., & Sears, S. (2005). “Construction Contracting, Seventh Edition”, A Practical Guide to Company Management.Search in Google Scholar

Costello, A. B., & Jason, O. (2005). Best practices in exploratory factor analysis: Four recommendations for getting the most from your analysis. Practical Assessment Research & Evaluation, 10(7). Available online: http://pareonline.net/getvn.asp?v=10&n=7.Search in Google Scholar

Cusack, D. (1992). Implementation of ISO 9000 in construction. In: ISO 9000 Forum Symposium, the International Group for Lean Construction, Gold Coast, Australia, pp. 157-167.Search in Google Scholar

Dalty, C. D., & Crawshaw, D. T. (1973). “Working Drawings in Use”, Building Research Establishment, Current Paper CP 18/73, Watford, UK.Search in Google Scholar

Davis, K., Ledbetter, W. B., & Buratti, J. L. (1989). Measuring design and construction quality costs. ASCE Journal of Construction Engineering and Management, 115(3), pp. 389-400.10.1061/(ASCE)0733-9364(1989)115:3(385)Search in Google Scholar

Enshassi, A., Sundermeier, M., & Zeiter, M. A. (2017). Factors contributing to rework and their impact on construction projects performance. International Journal of Sustainable Construction Engineering & Technology, 8(1), pp. 12-33.Search in Google Scholar

Fellows, R. R., & Liu, A. (2008). ). Research Methods for Construction, 3rd edn. Wiley-Blackwell Science, London.Search in Google Scholar

Hair, J. F., Anderson, R. E., Tathan, R. L., & Black, W. C. (1998). Multivariate Data Analysis, 5th edn. Prentice Hall, Upper Saddle River, NJ.Search in Google Scholar

Harrington, J., Voehl, F., & Wiggin, H. (2012). Applying TQM to the construction industry. The TQM Journal, 24(4), pp. 352-362. https://doi.org/10.1108/17542731211247373.10.1108/17542731211247373Open DOISearch in Google Scholar

Hwang, B. G., Thomas, S. R., Haas, C. T., & Caldas, C. H. (2009). Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135(3), pp. 187-198.10.1061/(ASCE)0733-9364(2009)135:3(187)Search in Google Scholar

Josephson, P., Larsson, B., & Li, H. (2002). Illustrative benchmarking rework and rework costs in Swedish construction industry. Journal of Management Engineering, 18(2), pp. 76-83.10.1061/(ASCE)0742-597X(2002)18:2(76)Search in Google Scholar

Khan, H. J. (2003). Impact of total quality management on productivity. The TQM Magazine, 15(6), pp. 374-380.10.1108/09544780310502705Search in Google Scholar

Koskela, L. (1992). Application of the new production philosophy to construction. In: Technical Report #72, Centre for Integrated Facility Engineering, Department of Civil Engineering, Stanford University. (1993). Lean Production in Construction. In the 10th International Symposium on Automation and Robotics in Construction (ISARC), Elsevier, USA, pp. 47-54.10.22260/ISARC1993/0007Search in Google Scholar

Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30, pp. 607-610.10.1177/001316447003000308Search in Google Scholar

Love, P. E. D. (2002). “Influence of project type and procurement method of rework costs in building construction projects. Journal of Construction Engineering and Management, 128(1), pp. 1-29.10.1061/(ASCE)0733-9364(2002)128:1(18)Search in Google Scholar

Love, P. E. D., Davis, P. R., Ellis, J. M., & Cheung, S. O. (2010). Dispute causation: Identification of pathogenic influences. Engineering, Construction and Architectural Management, 17(4), pp. 404-423.10.1108/09699981011056592Search in Google Scholar

Love, P., & Edwards, D. (2004). “Determinants of rework in building construction projects. Engineering, Construction and Architectural Management, 11(4), pp. 259-274.10.1108/09699980410547612Search in Google Scholar

Love, P. E., Edwards, D. F., & Sohal, A. (2004). Total quality management in Australian contracting organization: Pre-conditions for successful implementation. Engineering, Construction and Architectural Management, 11(3), pp. 189-198.10.1108/09699980410535796Search in Google Scholar

Love, P. E. D., Holt, G. D., Shen, L. Y., Li, H., & Irani, Z. (2002). Using systems dynamics to better understand change and rework in construction project, management systems. International Journal of Project Management, 20(6), pp. 425-436.10.1016/S0263-7863(01)00039-4Search in Google Scholar

Love, P. E. D., Mandal, P., & Li, H. (1999). Determining the causal structure of rework in construction projects. Construction Management and Economics, 17(4), pp. 505-517.10.1080/014461999371420Search in Google Scholar

Love, P., Mandal, P., Smith, J., & Georgiou, J. (2000). “DECOEM: A design and construction rework minimization model. In: 1st International Conference on Systems Thinking in Management, Geelong.Search in Google Scholar

Love, P. E. D., & Smith, J. (2003). Benchmarking, bench-action and bench-learning: Rework mitigation in projects. ASCE Journal of Management in Engineering, 19(4), pp. 147-159.10.1061/(ASCE)0742-597X(2003)19:4(147)Search in Google Scholar

Love, P. E., & Sohal, A. S. (2003). Capturing rework costs in projects. Managerial Auditing Journal, 18(4), pp. 329-339.10.1108/02686900310474343Search in Google Scholar

Low, S. P., & Peh, K. W. (1996). A framework for implementing total quality management in construction. The TQM Magazine, 8(5), pp. 39-46.10.1108/09544789610146033Search in Google Scholar

Low, S. P., & Teo, J. A. (2004). Implementing total quality management in construction firms. Journal of Management in Engineering, 20(1), pp. 8-15.10.1061/(ASCE)0742-597X(2004)20:1(8)Search in Google Scholar

Mahamid, I. (2016). Analysis of rework in residential building projects in Palestine. Jordan Journal of Civil Engineering, 10(2), pp. 197-208.10.14525/JJCE.10.1.3536Search in Google Scholar

Mastenbroek, Y. C. (2010). Reducing rework costs in construction projects. Published Bsc thesis, University of Twente, San Pedro Sula, Honduras. Available at http://purl.utwente.nl/essays/59691 on 10 July, 2017.Search in Google Scholar

McIntyre, C., & Kirschenman, M. (2000). Survey of total quality management in construction industry in upper Midwest. Journal of Management in Engineering, 16(5), pp. 67-70.10.1061/(ASCE)0742-597X(2000)16:5(67)Search in Google Scholar

Meshksar, S. (2012). Cost and time impacts of reworks in building a reinforced concrete structure. Master thesis, North Cyprus, Gazimagusa: Eastern Mediterranean University. Available at http://hdl.handle.net/11129/290 on 7 June, 2017.Search in Google Scholar

Mundfrom, D. J., Shaw, D. G., & Ke, T. L. (2005). Minimum sample size recommendations for conducting factor analyses. International Journal of Testing, 5(2), pp. 159-168.10.1207/s15327574ijt0502_4Search in Google Scholar

Oyewobi, L. O., & Ogunsemi, D. R. (2010). Factors influencing rework occurrence in construction: A study of selected building projects in Nigeria. Journal of Building Performance, 1(1), pp. 1-20.Search in Google Scholar

Palaneeswaran, E. (2006). Reducing rework to enhance project performance levels. In: Proceedings of the One Day Seminar on “Recent Developments in Project Management in Hong Kong.Search in Google Scholar

Pallant, J. (2007). SPSS Survival Manual: A Step-By-Step Guide to Data Analysis Using SPSS” Version 15, 3rd edn. Open university Press, England.Search in Google Scholar

Peter, H., Pascale, C., & Todd, L. (2010). Barriers and benefits of quality management in the construction industry: An empirical study. Total Quality Management., 21(9), pp. 953-969.10.1080/14783363.2010.487673Search in Google Scholar

Preacher, K. J., & MacCallum, R. C. (2002). Exploratory factor analysis in behaviour genetics research: Factor recovery with small sample sizes. Behaviour Genetics, 32, pp. 153-161.10.1023/A:1015210025234Search in Google Scholar

Rounce, G. (1998). Quality, waste, and cost consideration in architectural building design management. International Journal of Project Management, 16(2), pp. 123-127.10.1016/S0263-7863(97)00042-2Search in Google Scholar

Saidu, I., & Shakantu, W. M. (2016b). The contributions of material waste to project-cost overrun in Abuja, Nigeria. Acta Structilia, 23(1), pp. 99-113.10.18820/24150487/as23i1.4Search in Google Scholar

Saidu, I., & Shakantu, W. M. W. (2016a). “A study of the relationship between material waste and cost overruns in the construction industry. In: Windapo, A. O. (ed.), The 9th CIDB Postgraduate Conference Cape Town, South Africa. Emerging Trends in Construction Organizational Practices and Project-Management Knowledge Area. 2-4 February, 2016, pp. 124-134Search in Google Scholar

Simpeh, E. K. (2012). An analysis of the causes and impact of rework in construction projects. A Thesis submitted Cape Peninsula University of Technology, South Africa. Available at http://hdl.handle.net/11189/1054 on 10 December, 2016.Search in Google Scholar

Spacey, J. (2016). What is a risk trigger? Available at http://simplicable.com/new/risk-trigger on 8 March, 2017.Search in Google Scholar

Spector, P. (1992). Summated Rating Scale Construction: An Introduction. Sage Publications, Newbury Park, CA.10.4135/9781412986038Search in Google Scholar

Tabachnick, B. G., & Fidell, L. S. (2007). Using Multivariate Statistics, 5th edn. Pearson Education Inc, Boston, MA.Search in Google Scholar

Wasfy, M. A. F. (2010). Severity and impact of rework, a case study of a residential commercial tower project in the Eastern Province-KSA. Master thesis. Dhahran, Saudi Arabia: King Fahd University of Petroleum & Minerals.Search in Google Scholar

Yong, G., & Pearce, S. (2013). A beginner’s guide to factor analysis: Focusing on exploratory factors analysis. Tutorials in Quantitative Methods for Psychology, 9(2), pp. 79-94.10.20982/tqmp.09.2.p079Search in Google Scholar

Zhao, N. (2008). The minimum sample size in factor analysis. Retrieved from: https://www.encorewiki.org/plugins/servlet/mobile#content/view/25657 on 15 December, 2016.Search in Google Scholar

eISSN:
1847-6228
Language:
English
Publication timeframe:
Volume Open
Journal Subjects:
Engineering, Introductions and Overviews, other