Open Access

Diagnostics of Track Quality of Ballastless Track and Transition Areas in Vicinity of Portals of Tunnel Turecky vrch

   | May 12, 2016

Cite

The paper deals with the partial results of diagnostics of experimental sections of ballastless track Rheda 2000® and transition areas between ballastless and ballasted track structure around portals of tunnel Turecky vrch after six measurement cycles. The paper presents differences between each operational measurement and the measurement before putting sections into operation, which indicates a development of track geometry quality.

eISSN:
2199-6512
ISSN:
1336-5835
Language:
English