This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.
Bach, J., 1994. The Immaturity of CMM. American Programmer. Vol. 13, No. 13, pp.1–8.BachJ.1994The Immaturity of CMM131318Search in Google Scholar
Battista, C., Fumi, A. and Schiraldi, M.M., 2012. The Logistic Maturity Model: Guidelines for Logistic Processes Continuous Improvement. Proceedings of the XXIII World POMS Conference, pp.20–23.BattistaC.FumiA.SchiraldiM.M.2012The Logistic Maturity Model: Guidelines for Logistic Processes Continuous Improvement2023Search in Google Scholar
Battista, C. and Schiraldi, M.M., 2013. The Logistic Maturity Model: Application to a Fashion Company. International Journal of Engineering Business Management, Vol. 5, No. SPL.ISSUE, doi.org/10.5772/56838, available at: https://doi.org/10.5772/56838.BattistaC.SchiraldiM.M.2013The Logistic Maturity Model: Application to a Fashion Company5No. SPL.ISSUE, doi.org/10.5772/56838, available at: https://doi.org/10.5772/56838.10.5772/56838Search in Google Scholar
de Bruin, T., Freeze, R., Kulkarni, U. and Rosemann, M., 2005. Understanding the Main Phases of Developing a Maturity Assessment Model. 16th Australasian Conference on Information Systems, No. December, pp.1–10.de BruinT.FreezeR.KulkarniU.RosemannM.2005Understanding the Main Phases of Developing a Maturity Assessment ModelNo.December110Search in Google Scholar
CMMI Product Team, 2010. CMMI for Development, Version 1.3: Improving Processed for Better Products and Services. Carnegie Mellon University, Software Engineering Institute, No. November, doi.org/CMU/SEI-2010-TR-033 ESC-TR-2010-033, available at: https://doi.org/CMU/SEI-2010-TR-033ESCTR-2010-033.CMMI Product Team2010Version 1.3: Improving Processed for Better Products and Services. Carnegie Mellon University, Software Engineering Institute, No. November, doi.org/CMU/SEI-2010-TR-033 ESC-TR-2010-033, available at: https://doi.org/CMU/SEI-2010-TR-033ESCTR-2010-033.Search in Google Scholar
Enke, J., Glass, R. and Metternich, J., 2017. Introducing a Maturity Model for Learning Factories. Procedia Manufacturing, Vol. 9, pp.1–8, doi.org/10.1016/j.promfg.2017.04.010.EnkeJ.GlassR.MetternichJ.2017Introducing a Maturity Model for Learning Factories918doi.org/10.1016/j.promfg.2017.04.010.10.1016/j.promfg.2017.04.010Search in Google Scholar
Finkelstein, A., 1992. A Software Process Immaturity Model. ACM SIGSOFT Software Engineering Notes, Vol. 17. No. 4, pp.22–23, doi.org/10.1145/141874.141878.FinkelsteinA.1992A Software Process Immaturity Model1742223doi.org/10.1145/141874.141878.10.1145/141874.141878Search in Google Scholar
Garcia-Reyes, H. and Giachetti, R.E., 2010. Using Experts to Develop a Supply Chain Maturity Model in Mexico. Supply Chain Management: An International Journal, Vol. 15 No. 6, pp.415–424, doi.org/10.1108/13598541011080400.Garcia-ReyesH.GiachettiR.E.2010Using Experts to Develop a Supply Chain Maturity Model in Mexico156415424doi.org/10.1108/13598541011080400.10.1108/13598541011080400Search in Google Scholar
Harrington, H.J., 1991. Business Process Improvement: The Breakthrough Strategy for Total Quality, Productivity, and Competitiveness. McGraw Hill Professional.HarringtonH.J.1991McGraw Hill ProfessionalSearch in Google Scholar
Hausladen, I. and Schosser, M., 2020. Towards a Maturity Model for Big Data Analytics in Airline Network Planning. Journal of Air Transport Management, Elsevier Ltd, Vol. 82, 101721, doi.org/10.1016/j.jairtraman.2019.101721.HausladenI.SchosserM.2020Towards a Maturity Model for Big Data Analytics in Airline Network PlanningElsevier Ltd82101721, doi.org/10.1016/j.jairtraman.2019.101721.10.1016/j.jairtraman.2019.101721Search in Google Scholar
Hofmann, E. and Rüsch, M., 2017. Industry 4.0 and the Current Status as Well as Future Prospects on Logistics. Computers in Industry, Elsevier B.V., Vol. 89, pp.23–34, doi.org/10.1016/j.compind.2017.04.002.HofmannE.RüschM.2017Industry 4.0 and the Current Status as Well as Future Prospects on LogisticsElsevier B.V.,892334doi.org/10.1016/j.compind.2017.04.002.10.1016/j.compind.2017.04.002Search in Google Scholar
Lahti, M., Shamsuzzoha, A.H.M. and Helo, P., 2009. Developing a Maturity Model for Supply Chain Management. International Journal of Logistics Systems and Management, Vol. 5, No. 6, p.654–678, doi.org/10.1504/IJLSM.2009.024796.LahtiM.ShamsuzzohaA.H.M.HeloP.2009Developing a Maturity Model for Supply Chain Management56654678doi.org/10.1504/IJLSM.2009.024796.10.1504/IJLSM.2009.024796Search in Google Scholar
Meng, X., Sun, M. and Jones, M., 2011. Maturity Model for Supply Chain Relationships in Construction. Journal of Management in Engineering, No. April, pp.97–105, doi.org/10.1061/(asce)me.1943-5479.0000035.MengX.SunM.JonesM.2011Maturity Model for Supply Chain Relationships in ConstructionNo. April,97105doi.org/10.1061/(asce)me.1943-5479.0000035.10.1061/(ASCE)ME.1943-5479.0000035Search in Google Scholar
Nurdiani, I., Börstler, J., Fricker, S., Petersen, K. and Chatzipetrou, P., 2019. Understanding the Order of Agile Practice Introduction: Comparing Agile Maturity Models and Practitioners’ Experience. Journal of Systems and Software, Elsevier Inc., Vol. 156, pp.1–20, doi.org/10.1016/j.jss.2019.05.035.NurdianiI.BörstlerJ.FrickerS.PetersenK.ChatzipetrouP.2019Understanding the Order of Agile Practice Introduction: Comparing Agile Maturity Models and Practitioners’ ExperienceElsevier Inc.,156120doi.org/10.1016/j.jss.2019.05.035.10.1016/j.jss.2019.05.035Search in Google Scholar
Paulk, M.C., 2009. A History of the Capability Maturity Model for Software. The Software Quality Profile, Vol. 1, No. 1, pp.5–19.PaulkM.C.2009A History of the Capability Maturity Model for Software11519Search in Google Scholar
Pérez-Mergarejo, E., Pérez-Vergara, I. and Rodríguez-Ruíz, Y., 2014. Maturity Models and the Suitability of its Application in Small and Medium Enterprises. Ingeniería Industrial, Vol. 35, No. 2, pp.149–160, doi.org/10.1016/j.jag.2015.12.005.Pérez-MergarejoE.Pérez-VergaraI.Rodríguez-RuízY.2014Maturity Models and the Suitability of its Application in Small and Medium Enterprises352149160doi.org/10.1016/j.jag.2015.12.005.Search in Google Scholar
Pfleeger, S.L., 1995. Maturity, Models, and Goals: How to Build a Metrics Plan. The Journal of Systems and Software, Vol. 31. No. 2, pp.143–155, doi.org/10.1016/0164-1212(94)00094-4.PfleegerS.L.1995Maturity, Models, and Goals: How to Build a Metrics Plan312143155doi.org/10.1016/0164-1212(94)00094-4.10.1016/0164-1212(94)00094-4Search in Google Scholar
Piney, K., 2009. A Project Management Immaturity Model. PROject BeneFITS, Vol. 17, No. 4, pp.1–5.PineyK.2009A Project Management Immaturity Model17415Search in Google Scholar
Schorsch, T., 1996. The Capability Im-Maturity Model (CIMM). Nexus, No. Nov, pp.1–4.SchorschT.1996The Capability Im-Maturity Model (CIMM)No. Nov,14Search in Google Scholar