In this study, we introduce a model for optimizing the arrangement of final material depots at a construction site. The target is to minimize the construction time, cost and resources by minimizing the total delivery distance. The model simplifies the structures that shall be constructed as line segments or curves. The model uses continuous conditions: the feasible positions of the final material depots are searched on the entire