À propos de cet article

Citez

Abd Elhamid, M., & Ghareeb, S. (2011). Measuring Performance in Egyptian Construction Firms Applying Quality Management Systems. Journal of Construction Engineering and Project Management, 1(2), 18-27.10.6106/JCEPM.2011.1.2.018Search in Google Scholar

Ahmad, S., Svalestuen, F., Andersen, B., & Torp, O. (2016). A Review of Performance Measurement for Successful Concurrent Construction. Procedia – Social and Behavioral Sciences, 226, 447-454.10.1016/j.sbspro.2016.06.210Search in Google Scholar

Aho, M. (2009). A Capability Maturity Model for Corporate Performance Management. An Empirical Study in Large Finnish Manufacturing Companies. Proceedings from the eBRF – A Research Forum to Understand Business in Knowledge Society.Search in Google Scholar

Bank Audi. (2016). Egypt Economic Report. Beirut, Lebanon: Bank Audi.Search in Google Scholar

Beatham, S., Anumba, C., Thorpe, T., & Hedges, I. (2004). KPIs: a critical appraisal of their use in construction. International Journal of Benchmarking, 11(1), 93-117.10.1108/14635770410520320Search in Google Scholar

Constructing Excellence. (2016). KPI Annual Report. London, England: Constructing Excellence.Search in Google Scholar

EBI. (2016). SME Data Base. Egyptian Banking Institute. Retrieved from http://sme.ebi.gov.egSearch in Google Scholar

Egan, J. (1998). Rethinking Construction: Report of the Construction Task Force. London, England: HMSO.Search in Google Scholar

Greenacre, M., & Hastie, T. (1987). The Geometric Interpretation of Correspondence Analysis. Journal of the American Statistical Association, 82(398), 437-447.10.1080/01621459.1987.10478446Search in Google Scholar

Higgs, N. T. (1991). Practical and Innovative uses of Correspondence Analysis. The Statistician, 40(2), 183-194.10.2307/2348490Search in Google Scholar

Hudson, M., Smart, A., & Bourne, M. (2001). Theory and practice in SME performance measurement systems. International Journal of Operations & Production Management, 21(8), 1096-1115.10.1108/EUM0000000005587Search in Google Scholar

Latham, M. (1994). Constructing the team. London, England: HMSO.Search in Google Scholar

Neely, A. (1999). The performance measurement revolution: Why now and what next? International Journal of Operations & Production Management, 19(2), 205-228.10.1108/01443579910247437Search in Google Scholar

Neely, A., Gregory, M., & Platts, K. (1995). Performance measurement system design: A literature review and research agenda. International Journal of Operations & Production Management, 15(4), 80-116.10.1108/01443579510083622Search in Google Scholar

Nudurupati, S., Arshad, T., & Turner, T. (2007). Performance measurement in the construction industry: An action case investigating manufacturing methodologies. Computers in Industry, 58(7), 667-676.10.1016/j.compind.2007.05.005Search in Google Scholar

Oxford Business Group. (2017). Capacity challenge for Egypt’s construction and real estate sector. Retrieved from https://www.oxfordbusinessgroup.com/Search in Google Scholar

Sharif, A. (2002). Benchmarking performance management systems. International Journal of Benchmarking, 9(1), 62-85.10.1108/14635770210418588Search in Google Scholar

Tennant, S., & Langford, D. (2008). The construction project balanced scorecard. Proceedings 24th Annual ARCOM Conference, 361-370.Search in Google Scholar

Valverde-Gascueña, N., Navarro-Astor, E., Fuentes-del-Burgo, J., & Ruiz-Fernandez, J. P. (2011). Factors that affect the productivity of construction projects in small and medium companies: Analysis of its impact on planning. Proceedings 27th Annual ARCOM Conference, 879-888.Search in Google Scholar

Vukomanovic, M., Ceric, A., & Radujković, M. (2007). BSC-EFQM based approach for performance benchmarking in construction industry. Proceedings 23rd Annual ARCOM Conference, 631-640.Search in Google Scholar

Vukomanović, M., Radujković, M., & Nahod, M. (2010). Leading, lagging and perceptive performance measures in the construction industry. Organization, Technology and Management in Construction, 2(1), 103-111.Search in Google Scholar

Weaver, P. (2007). The Origins of Modern Project Management. 4th Annual PMI College of Scheduling Conference. Retrieved from https://www.mosaicprojects.com.au/PDF_Papers/P050_Origins_of_Modern_PM.pdfSearch in Google Scholar