Uneingeschränkter Zugang

Towards the Building Information Modeling-Based Capital Project Lifecycle Management in the Luxury Yacht Industry


Zitieren

1. NIBS. 2007. Unite States National Building Information Modeling Standard, Version 1 - Part 1: Overview, Principles, and Methodologies Washington, DC.Search in Google Scholar

2. J. Yang, X. Zhang, 2009. Building Information Integration Model and Supporting Technology Standard. Construction Technology, 38(10), 109-112.Search in Google Scholar

3. W. Wu, R. R. A. Issa, 2010. Feasibility of integrating building information modeling and LEED certification process. In: International Conference on Computing in Civil and Building Engineering. Nottingham. pp. 161.Search in Google Scholar

4. McGraw-Hill Construction, 2009. The Business Value of BIM: Getting Building Information Modeling to the Bottom Line. M.-H. Construction, Bedford, MA.Search in Google Scholar

5. McGraw-Hill Construction. 2012. The Business Value of BIM in North America: Multi-Year Trend Analysis and User Ratings (2007-2012). M.-H. Construction, Bedford, MA.Search in Google Scholar

6. C. Eastman, P. Teicholz , R. Sacks, K. Liston, 2011. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors (2nd ed.). NJ: John Wiley and Sons, Hoboken.Search in Google Scholar

7. AIA, 2014. AIA TAP BIM Awards - 2014 Professionas’ Choice BIM Award. http://bimforum.org/wp-content/uploads/2014/04/9ab-2014-Professionals-Choice-BIMAward-MASTER-FINAL-PPT-04172014.pdf.Search in Google Scholar

8. W. Wu, R. R. A. Issa, 2012. Leveraging Cloud-BIM for LEED Automation. Journal of Information Technology in Construction, 17, 367-384.Search in Google Scholar

9. B. Becerik-Gerber, K. Ku, F. Jazizadeh, 2012. BIM-Enabled Virtual and Collaborative Construction Engineering and Management. Journal of Professional Issues in Engineering Education and Practice, 138(3), pp. 234-245.10.1061/(ASCE)EI.1943-5541.0000098Search in Google Scholar

10. W. Zhong, T. Jiang, 2014. Collaborative Construction based on BIM Standard. Journal of Information Technology in Civil Engineering and Architecture, 6(5), pp. 95-101.Search in Google Scholar

11. L. Ran, 2015. Transferring best practices enabled by Building information modeling (BIM) in Architecture, Engineering and Construction (AEC) to shipbuilding industry: An explorative study. (Industry Engineering and Management Master), Aalto University, Espoo, Finland. https://aaltodoc.alto.fi/bitstream/handle/123456789/17703/master_Ran_Luming_2015.pdf?sequence=1.Search in Google Scholar

12. L. Ran, V. Singh, 2016a. Building information modellingenabled best practices in AEC and takeaways for Finnish shipbuilding industry. International Journal of Product Lifecycle Management, 9(3), pp. 238.10.1504/IJPLM.2016.080497Search in Google Scholar

13. L. Ran, V. Singh, 2016b. Comparing BIM in Construction with 3D Modeling in Shipbuilding Industries: Is the Grass Greener on the Other Side? In A. Bouras, B. Eynard, S. Foufou, & K.-D. Thoben (Eds.), Product Lifecycle Management in the Era of Internet of Things (pp. 193- 202): Springer International Publishing.10.1007/978-3-319-33111-9_18Search in Google Scholar

14. M. Braglia, D. Castellano, M. Frosolini, 2014. Computeraided activity planning (CAAP) in large-scale projects with an application in the yachting industry. Computers in Industry, 65(4), pp. 733-745.10.1016/j.compind.2014.02.008Search in Google Scholar

15. K. Hiekata, M. Grau, 2014. Case Studies for Concurrent Engineering Concept in Shipbuilding Industry. In J. Cha, S.-Y. Chou, J. Stjepandić, R. Curran, & W. Xu (Eds.), Moving Integrated Product Development to Service Clouds in the Global Economy (Vol. 1, pp. 102-111): IOS Press Inc.Search in Google Scholar

16. W. Tann, H.-J. Shaw, R. Bronsart, 2005. Integrating the Collaborative Environment in Shipbuilding: An Implementation Strategy. Journal of Ship Production, 21(1), pp. 37-45.10.5957/jsp.2005.21.1.37Search in Google Scholar

17. CADMATIC, 2016. CADMATIC Marine Design. http://www.nupas-cadmatic.com/company/overview.html.Search in Google Scholar

18. Intergraph, 2016a. Intergraph Smart 3D. http://ppm.intergraph.com/products/3d-product-family/intergraph-smart-3d.Search in Google Scholar

19. Intergraph, 2016b. SmartMarine Enterprise: Improving the Complete Marine Life Cycle. http://viewer.zmags.com/publication/f19dd27d#/f19dd27d/1.Search in Google Scholar

20. Intergraph, 2009. Capital Project Life Cycle Management (cPLM) vs. Product Life Cycle Management (PLM) for the Shipbuilding, Marine, and Offshore Industries. http://www.intergraph.com/assets/pdf/IntergraphcPLMvsPLMwhitepaper.pdf.Search in Google Scholar

21. N. Gu, K. London, 2010. Understanding and facilitating BIM adoption in the AEC industry. Automation in Construction, 19(8), pp. 988-999.10.1016/j.autcon.2010.09.002Search in Google Scholar

22. J. E. Gaul, M. N. Rieger, 2016. BIM Use in New Aircraft Carrier Pier and Bulkhead Rehabilitation Design. http://www.aecbytes.com/feature/2016/BIMPierBulkheadDesign.html.Search in Google Scholar

eISSN:
2083-7429
Sprache:
Englisch
Zeitrahmen der Veröffentlichung:
4 Hefte pro Jahr
Fachgebiete der Zeitschrift:
Technik, Einführungen und Gesamtdarstellungen, andere, Geowissenschaften, Atmosphärenkunde und Klimatologie, Biologie