Zitieren

[1] E.I. Bogomolny. Intensification of recovery of highly viscous oil from carbonate reservoirs of Udmurtia. Moscow-Izhevsk: Institute of Computer Science, 2003.Search in Google Scholar

[2] U.V. Zheltov, V.I. Kudinov and G.E. Malofeev. “Razrabotka slozhnopostroennyh mestorozhdeniy vyazkoy nefti v carbonathyh collectorah” [Development of oilfields of complex structure with high viscous oil in carbonate reservoirs]. Regular and Chaotic Dynamics, 2011, p. 327.Search in Google Scholar

[3] M.N. Baranov and T.N. Ivanova. “Employing dual completion technology and dual completion assemblies on oilfields of Udmurtia”. Natural and Technology Sciences, vol. 9, no. 99, pp. 32-37, 2016.Search in Google Scholar

[4] M.N. Baranov, N.G. Istomina, A.L. Gavrikov and T.N. Ivanova. “Optimization of oilfield development models”. Natural and Technology Sciences, vol. 10, no. 100, pp. 48-54, 2016.Search in Google Scholar

[5] Baranov M.N., Gavrikov A.L., Gubanov A.M., Drachuk V.R., Ziganshin F.H., Ivanova T.N. “On the improvement of the WEM technology at a late stage development of oil fields with hard-to-recover reserves”. In Modern technologies of oil and gas extraction. Prospects of development of mineral raw material, Izhevsk: UdSU, pp. 195-204, 2016.Search in Google Scholar

[6] M.N Baranov, O.A. Chikisheva and T.N. Ivanova. “Calculation economical efficiency of dual completion technology”. In Current socio-economic problems of modern times, Sarapul, Carton-Plus Publisher's House, pp. 30-34, 2016.Search in Google Scholar

[7] V.D. Lysenko. “Development of oil fields. Effective methods”. Monograph. Moscow, Nedra-Business Center, 2009. p. 552.Search in Google Scholar

[8] T.N. Ivanova, E.O. Emelyanov, D.N. Novokshonov and E.U. Vdovina. “Research of pump working capacity and identifying causes of its failures”. Сhemical and petroleum engineering, vol. 5, pp. 257-268, 2016.Search in Google Scholar

[9] M.D. Valeev, Y.V. Belousov and A.V. Kalugin. “Method of determination of oil inflow from layers at simultaneously-separate wells operation”. Oil Industry, vol. 2, pp. 28-35, 2006.Search in Google Scholar

[10] P. Božek and E. Pivarčiová. “Flexible manufacturing system with automatic control of product quality”. Strojarstvo, vol. 55, no. 3, pp. 211-221, 2013.Search in Google Scholar

[11] O.M. Garipov, V.A. Leonov and M.Z. Sharifov. “Technology and equipment for simultaneous-separate injection of water into several reservoirs by a single well”. Vestnik nedropolzovatelya HMAO, no 17, pp. 69-74, 2007.Search in Google Scholar

[12] R.H. Muslimov. Oil recovery: past, present, future. Kazan: FEN Publisher's House, 2012.Search in Google Scholar

[13] R.K. Nizaev, R.G. Ramazanov, R.T. Shakirova, V.Y. Kondakova and G.V. Aleksandrov. “Estimating efficiency of dual completion for development of the Bashkirian stage using geological and reservoir modelling”. Oil industry, no 7, pp. 29-31, 2010.Search in Google Scholar

[14] K.M. Garifov, N.G. Ibragimov and R.G.Zabbarov. “Dual completion technology development”. Oil and life, no 3, pp. 40-41, 2008.Search in Google Scholar

[15] P.Božek and E. Pivarčiová. “Registration of Holographic Images Based on Integral Transformation”. Computing and Informatics, vol. 31, no. 6, pp. 1369- 1383, 2012.Search in Google Scholar

[16] R.R. Gabdullov, P.I. Slivka, A.A. Agafonov and V.I. Nikishov. “Expirience of employing dual completion technology for multilayered oilfields in Rosneft oil company”. Engineering Practise, no 1, pp. 30-31, 2010.Search in Google Scholar

[17] H. Oberhaensli, K. Novotna, A. Piskova, S. Chabrillat, D.K. Nourgaliev and A.K. Kurbaniyazov. “Extraterrestrial iron in the Cretaceous-Danian sediments”. Izvestiya, Physics of the Solid Earth, vol. 47, no. 5, pp. 379-401, 2011.10.1134/S1069351311040082Search in Google Scholar

[18] V.A. Afanasyev. “Optimization of well assemblies and well pump equipment of dual completion”. Engineering Practice., no 2, p. 36, 2012.Search in Google Scholar

[19] A.I. Ipatov. “Monitoring and regulating of formations with employing dual completion and SMART WELL equipment”. Engineering practice, no 2, pp. 16-25, 2012.Search in Google Scholar

[20] V.N. Ivanovskiy. “Dual completion and lateral hole exploitation: modern technologies review and development prospects”. Engineering practice, no 2, pp. 4-15, 2012.Search in Google Scholar

[21] Y. Muslimov. “The projects of WEM in TNK-BP: at a low start”. Innovator, no 5, pp. 2-10, 2012.Search in Google Scholar

[22] Y.V. Zeigman, O.A. Gumerov, I.V. Generalov. Choice of equipment and operation processes of wells equipped with sucker rod pumps and electric submersible pumps. Ufa: USPTU, 2000.Search in Google Scholar

[23] M. Fabián, R. Boslai, P. Ižol, J. Janeková, J. Fabiánová, G. Fedorko and P. Božek. “Use of parametric 3D modelling - tying parameter values to spreadsheets at designing molds for plastic injection”. Manufacturing technology, vol. 15, no. 1, pp. 24-31, 2015.10.21062/ujep/x.2015/a/1213-2489/MT/15/1/24Search in Google Scholar

[24] J. Černecký, P. Božek, E. Pivarčiová. “A new system for measuring the Deflection of the beam with the support of digital holographic interferometry”. Journal of Electrical Engineering, vol. 66, no. 1, pp. 52-55, 2015.10.1515/jee-2015-0008Search in Google Scholar

[25] M.N. Baranov, P. Božek, V. Prajová, T.N. Ivanova, D.N. Novokshonov and A.I. Korshunov. “Constructing and calculating of multistage sucker rod string according to reduced stress”. Acta Montanistica Slovaca, vol. 22, no. 2, pp. 107-115, 2017.Search in Google Scholar

eISSN:
2450-5781
Sprache:
Englisch