Optimization of Construction Schedules with the Assumed Multi-Tasking of Working Brigades
Michał Krzemiński
Michał Krzemiński
| May 26, 2020
Technical Transactions
Volume 114 (2017): Issue 8 (August 2017)
About this article
Previous Article
Next Article
Abstract
References
Authors
Articles in this Issue
Preview
PDF
Cite
Share
Published Online:
May 26, 2020
Page range:
109 - 118
DOI:
https://doi.org/10.4467/2353737XCT.17.133.6884
Keywords
flowshop models
,
slack minimization
,
construction schedules
© 2020 Michał Krzemiński, published by Sciendo
This work is licensed under the Creative Commons Attribution-ShareAlike 4.0 Public License.
Michał Krzemiński
Institute of Building Engineering, Faculty of Civil Engineering, Warsaw University of Technology