Open Access

Integrative Programming of Production and Preventive Maintenance Tasks in an Environment of Identical Parallel Machines: Proposal of a Construction Heuristic


Cite

1. SWANSON, L. 1997. An empirical study of the relationship between production technology and maintenance management. Int. Journal of Production Economics, 53, pp.199 – 207. ISSN 0925-5273.Search in Google Scholar

2. GAO, X., BARABADY, J., MARKESET, T. 2010. Criticality analysis of a production facility using cost importance measures. Int. Journal of Systems Assurance Engineering and Management. 1, pp. 17–23.Search in Google Scholar

3. TAMBE, P. P., KULKARNI, M. S. 2013. A novel approach for production scheduling of a high pressure die casting machine subjected to selective maintenance and a sampling procedure for quality control. Int. Journal of Systems Assurance Engineering and Management.10.1007/s13198-013-0183-4Search in Google Scholar

4. RUIZ, R., GARCÍA-DÍAZ, J., MAROTO, C. 2007. Considering scheduling and preventive maintenance in the flowshop sequencing problem. In Computers & Operations Research,34(11), pp. 3314-3330. ISSN: 0305-0548.Search in Google Scholar

5. HADIDI, L. A., AL-TURKI. U. M. 2012. Integrated models in production planning and scheduling, maintenance and quality: a review. Int. Journal of Industrial and Systems Engineering, 10(1).10.1504/IJISE.2012.044042Search in Google Scholar

6. KUMAR, S., PUROHIT, B, S., KUMAR, B, L. 2014. Integrated Approach for Job Scheduling and Multi-Component Maintenance Planning in a Production System. 5th Int. & 26th All India Manufacturing Technology, Design and Research Conference (AIMTDR 2014).Search in Google Scholar

7. DA, W., FENG, H., PAN, E. 2016. Integrated preventive maintenance and production scheduling optimization on uniform parallel machines with deterioration effect. In Industrial Engineering and Engineering Management (IEEM). Int. Conference on. IEEE, pp. 951-955.Search in Google Scholar

8. ZAHEDI, Z., SALIM, A. 2017. Integrating Preventive Maintenance Scheduling as Probability Machine Failure and Batch Production Scheduling. ComTech: Computer, Mathematics and Engineering Applications, 7(2), pp. 105-112.Search in Google Scholar

9. JING, Z., HUA, J., ZHU, Y. 2017. Multi-objective Integrated Optimization Problem of Preventive Maintenance Planning and Flexible Job-Shop Scheduling. In: Proceedings of the 23rd Int. Conference on Industrial Engineering and Engineering Management. DOI 10.2991/978-94-6239-255-7_25.10.2991/978-94-6239-255-7_25Open DOISearch in Google Scholar

10. BOUDJELIDA, A. 2017. On the robustness of joint production and maintenance scheduling in presence of uncertainties. Journal of Intelligent Manufacturing, pp. 1-16.Search in Google Scholar

11. PINEDO, M. L. 2012. Scheduling. Theory, Algorithms, and Systems. Fourth edition. Springer. New York University. New York.Search in Google Scholar

12. COFFMAN, E. G., GAREY, M. R., JOHNSON, D. S. 1978. An application of Bin-Packing to multiprocessor scheduling. SIAM J. COMPUT., 7(1), pp. 1-17.Search in Google Scholar

13. XU, D.; SUN, K.; LI, H. 2008. Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan. In Computers & Operations Research 35, pp. 1344 – 1349.Search in Google Scholar

14. LEE, W., CH., WU, CH, CH. 2008. Multi machine scheduling with deteriorating jobs and scheduled maintenance. In Applied Mathematical Modelling, 32, pp. 362–373.Search in Google Scholar

15. MIRABEDINI, S, N., IRANMANESH, H. 2014. A scheduling model for serial jobs on parallel machines with different preventive maintenance (PM). Int. Journal of Advanced Manufacturing Technologies, 70, 1579–1589.Search in Google Scholar

16. LEE, W. CH., WANG, J. Y., LEE, L. Y. 2015. A hybrid genetic algorithm for an identical parallel machine problem with maintenance activity. Journal of the Operational Research Society, pp. 1–13.Search in Google Scholar

17. KUMAR, S., KUMAR – LAD, B. 2016. Integrated production and maintenance planning for parallel machine system considering cost of rejection. Journal of the Operational Research Society, pp. 1-13.Search in Google Scholar

eISSN:
1338-0532
Language:
English
Publication timeframe:
2 times per year
Journal Subjects:
Engineering, Introductions and Overviews, other