Open Access

Approximate Estimation of Man-Day in Ship Block Production: A Two-Stage Stochastic Program


Cite

Y. Guo, H. Wang, X. Liang, and H. Yi, “A quantitative evaluation method for the effect of construction process on shipbuilding quality,” Ocean Engineering, vol. 169, pp. 484-491, 2018, doi.org/101016/j.oceaneng.2018.09.046.Search in Google Scholar

H. Wang, Y. Guo, X. Liang, and H. Yi, “A function-oriented quality control method for shipbuilding,” Ships and Offshore Structures, vol. 14, no. 2, pp. 220-228, 2019, doi.org/10.1080/17445302.2018.1493910.Search in Google Scholar

H. Kim, J. Kang, and S. Park, “Scheduling of shipyard block assembly process using constraint satisfaction problem,” Asia Pacific Management Review, vol. 7, no. 1, pp. 119-138, 2002.Search in Google Scholar

J. Li, M. Sun, D. Han, J. Wang, X. Mao, and X. Wu, “A knowledge discovery and reuse method for time estimation in ship block manufacturing planning using DEA,” Advanced Engineering Informatics, vol. 39, pp. 25-40, 2019, doi.org/10.1016/j.aei.2018.11.005.Search in Google Scholar

J. Park, D. Lee, and J. Zhu, “An integrated approach for ship block manufacturing process performance evaluation: case from Korea shipbuilding company,” International Journal of Production Economics, vol. 156, pp. 214-222, 2014, doi.org/10.1016/j.ijpe.2014.06.012.Search in Google Scholar

M. Kang, J. Seo, and H. Chung, “Ship block assembly sequence planning considering productivity and welding deformation,” International Journal of Naval Architecture and Ocean Engineering, vol. 10, pp. 450-457, 2018, doi.org/10.1016/j.ijnaoe.2017.09.005.Search in Google Scholar

H. Kim, S. S. Lee, J. H. Park, and J. G. Lee, “A model for simulation-based shipbuilding system in a shipyard manufacturing process,” International Journal of Computer Integrated Manufacturing, vol. 18, no. 6, pp. 427-441, 2005, doi:10.1080/09511920500064789.Open DOISearch in Google Scholar

J. M. Lee, Y. K. Jeong, and J. H. Woo, “Development of an evaluation framework of production planning for the shipbuilding industry,” International Journal of Computer Integrated Manufacturing, vol. 31, no. 99, pp. 831-847, 2018, doi.org/10.1080/0951192X.2018.1449968.Search in Google Scholar

A. Türk, S. Gürgen, M. Özkök, and İ. Altın, “A comprehensive investigation into the performance of genetic algorithm for effective shipyard topological layout,” Proceedings of the Institution of Mechanical Engineers Part M-Journal of Engineering for the Maritime Environment, vol. 236, no. 3, pp. 726-740, 2022, doi.org/10.1177/147509022110620.Search in Google Scholar

B. Lujibenkov, B. Blagojević, J. Bašić, and M. Bašić, “Procedure for reconstruction of gajeta hull form using photogrammetric measurement method,” Brodogradnja, vol. 73, no. 2, pp. 139-151, 2022, doi.org/10.21278/brod73208.Search in Google Scholar

Y. J. Song, J. H. Woo, and J. G. Shin, “Research on systematization and advancement of shipbuilding production management for flexible and agile response for high value offshore platform,” International Journal of Naval Architecture and Ocean Engineering, vol. 3, no. 3, pp. 181-192, 2011, doi.org/10.2478/IJNAOE-2013-0061.Search in Google Scholar

I. H. Hwang, Y. Kim, D. K. Lee, and J. G. Shin, “Automation of block assignment planning using a diagram-based scenario modelling method,” International Journal of Naval Architecture and Ocean Engineering, vol. 6, no. 1, pp. 162-174, 2014, doi.org/10.2478/IJNAOE-2013-0170.Search in Google Scholar

M. Kafalı and M. Özkök, “Evaluation of shipyard selection criteria for ship owners using a fuzzy technique,” Journal of Marine Engineering & Technology, vol. 14, no. 3, pp. 146-158, 2015, doi.org/10.1080/20464177.2015.1118787.Search in Google Scholar

U. Bilen and Ş. Helvacioglu, “Data driven performance evaluation in shipbuilding,” Brodogradnja, vol. 71, no. 4, pp. 39-51, 2020, doi.org/10.21278/brod71403.Search in Google Scholar

L. Lei, L. Di, W. Pengyu, and Z. Honggen, “Research on hull assembly planning based on rule reasoning” Materials Science and Engineering, vol. 751, pp. 1-7, 2020, doi:10.1088/1757-899X/751/1/012084.Open DOISearch in Google Scholar

M. de C. Porath, R. Simoni, R. de A. Nunes, and A. Bertoldi, “Feasibility of measurement-assisted assembly of ship hull blocks,” Marine System & Ocean Technology, vol. 14, pp. 23-33, 2019, doi.org/10.1007/s40868-018-00053-w.Search in Google Scholar

M. Kafalı, N. Aydın, Y. Genç, and U. B. Çelebi, “A two-stage stochastic model for workforce capacity requirement in shipbuilding,” Journal of Marine Engineering & Technology, vol. 21, no. 3, pp. 146-158, 2022, doi.org/10.1080/20464177.2019.1704977.Search in Google Scholar

T. Urbanski, T. Graczyk, M. Taraska, and R. R. Iwankowicz, “Assessment of technological usefulness of panel production line in shipbuilding process,” Polish Maritime Research, vol. 25, pp. 134-144, 2018, doi:10.2478/pomr-2018-0034.Open DOISearch in Google Scholar

Y. K. Jeong, S. Ju, H. Shen, D. K. Lee, J. G. Shin, and C. Ryu, “An analysis of shipyard spatial arrangement planning problems and a spatial arrangement algorithm considering free space and unplaced block,” The International Journal of Advanced Manufacturing Technology, vol. 95, pp. 4307-4325, 2018, doi:10.1007/s00170-017-1525-1.Open DOISearch in Google Scholar

M. Afzalirad and J. Rezaeian, “Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictions,” Computers & Industrial Engineering, vol. 98, pp. 40-52, 2016, doi.org/10.1016/j.cie.2016.05.020.Search in Google Scholar

C. Wang, P. Mao, Y. Mao, and J. G. Shin, “Research on scheduling an optimisation under uncertain conditions in panel block production line in shipbuilding,” International Journal of Naval Architecture and Ocean Engineering, vol. 8, pp. 398-408, 2016, doi.org/10.1016/j.ijnaoe.2016.03.009.Search in Google Scholar

Z. Yuguang, A. Bo, and Z. Yong, “A PSO algorithm for multi-objective hull assembly line balancing using the stratified optimisation strategy,” Computers & Industrial Engineering, vol. 98, pp. 53-62, 2016, doi.org/10.1016/j.cie.2016.05.026.Search in Google Scholar

R. R. Iwankowicz, “A multi-case-base assembly management method for the shipbuilding industry,” Polish Maritime Research, vol. 28, no. 2, pp. 27-35, 2021, doi:10.2478/pomr-2021-0018.Open DOISearch in Google Scholar

B. Kwon and G. M. Lee, “Spatial scheduling for large assembly blocks in shipbuilding,” Computers & Industrial Engineering, vol. 89, pp. 203-212, 2015, doi.org/10.1016/j.cie.2015.04.036.Search in Google Scholar

M. Hadjina, N. Fafandjel and T. Matulja, “Shipbuilding production process design methodology using computer simulation,” Brodogradnja, vol. 6, no. 2, pp. 77-91, 2015.Search in Google Scholar

A. Oliveire and J. M. Gordo, “Lean tools applied to a shipbuilding panel line assembling process,” Brodogradnja, vol. 69, no. 4, pp. 53-64, 2018, doi.org/10.21278/brod6944.Search in Google Scholar

M. Hur, S. K. Lee, B. Kim, S. Cho, D. Lee, and D. Lee, “A study on the man-hour prediction system for shipbuilding,” Journal of Intelligent Manufacturing, vol. 26, no. 6, pp. 1267-1279, 2015, doi:10.1007/s10845-013-0858-3.Open DOISearch in Google Scholar

S. Hu, T. Liu, S. Wang, Y. Kao, and X. Sun, “A hybrid heuristic algorithm for shipbuilding construction space scheduling problem,” Discrete Dynamics in Nature and Society, vol. 2015, no.7, pp. 1-6, 2015, doi:10.1155/2015/841637.Open DOISearch in Google Scholar

J. Zheng, Z. Jiang, and Q. Chen, “Block spatial scheduling modelling and application in shipbuilding,” International Journal of Production Research, vol. 50, no. 10, pp. 2744-2756, 2012, doi.org/10.1080/00207543.2011.588629.Search in Google Scholar

Z. Liu, D. K. H. Chua, and K. H. Wee, “A simulation model for spatial scheduling for dynamic block assembly in shipbuilding,” Journal of Engineering, Project, and Production Management, vol. 1, no. 1, pp. 3-12, 2011, doi:10.32738/JEPPM.201107.0002.Open DOISearch in Google Scholar

S. I. Wahidi, S. Oterkus, and E. Oterkus, “Simulation of a ship’s block panel assembly process: optimising production processes and cost through welding robots,” Journal of Marine Science and Engineering, vol. 11, no. 8, pp. 1506-1522, 2023, doi.org/10.3390/jmse11081506.Search in Google Scholar

B. Liu and Z. H. Jiang, “The man-hour estimation models & its comparison of interim products assembly for shipbuilding,” International Journal of Operations Research, vol. 2, no. 1, pp. 9-14, 2005.Search in Google Scholar

Y. Imai, Y. Ohta, and H. Suzuki, “A man-hour estimation tool focused on graphical user interface,” Lecture Notes of Software Engineering, vol. 4, no. 3, pp. 175-178, 2016, doi: 10.18178/lnse.2016.4.3.245.Open DOISearch in Google Scholar

S. A. Seyfi, İ. Yanıkoğlu, and G. Yılmaz, “Multi-stage scenario-based stochastic programming for managing lot sizing and workforce scheduling at Vestel,” Annals of Operations Research, Published online, 2023, doi.org/10.1007/s10479-023-05741-4.Search in Google Scholar

D. J. Eyres and G. J. Bruce, Ship Construction, Seventh Edition, Butterworth-Heinemann: Oxford, UK, 2012.Search in Google Scholar

M. Kafalı, Y. Ünsan, and M. Özkök, “A production planning and control methodology for shipyards,” (In Turkish) Journal of ETA Maritime Science, vol. 6, no. 1, pp. 47-59, 2018, doi.org/10.5505/jems.2018.02986.Search in Google Scholar

F. Dong, H. Parvin, M. P. V. Oyen, and D. J. Singer, “Innovative ship block assembly production control using a flexible curved block job shop,” Journal of Ship Production, vol. 25, no. 4, pp. 206-213, 2009, doi:10.5957/jsp.2009.25.4.206.Open DOISearch in Google Scholar

M. Branda, “Sample approximation technique for mixed-integer stochastic programming problems with several change constraints,” Operation Research Letters, vol. 40, pp. 207-211, 2012, doi.org/10.1016/j.orl.2012.01.002.Search in Google Scholar

S. W. Wallace and W. T. Ziemba, (Eds.), Applications of stochastic programming, 1st ed., MPS SIAM- Series in Optimisation Number 5, 2005.Search in Google Scholar

J. R. Birge and F. Louveaux, “Introduction to Stochastic Programming”, 2nd Edition, Springer, New York, 2011.Search in Google Scholar

S. Ahmed and A. Shapiro, 2002. “The sample average approximation method for stochastic programs with integer recourse”, [Optimisation Online], 2002, http://www.optimisation-online.org.Search in Google Scholar

B. Ayvaz, B. Bolat, and N. Aydin, “Stochastic reverse logistics network design for waste of electrical and electronic equipment,” Resources, Conservation and Recycling, vol. 104, pp. 391–404, 2015, doi.org/10.1016/j.resconrec.2015.07.006.Search in Google Scholar

eISSN:
2083-7429
Language:
English
Publication timeframe:
4 times per year
Journal Subjects:
Engineering, Introductions and Overviews, other, Geosciences, Atmospheric Science and Climatology, Life Sciences