Open Access

Steam Turbine Stage Modernisation in Front of the Extraction Point


Cite

1. Gardzilewicz A, Marcinkowski S, 1995 Diagnosis of LP Steam Turbine prospects of Measuring Technique, PWR Vol. 28 1995, Joint Power Generation Vol. 3 ASME 1995, pp. 349-358,Search in Google Scholar

2. Gardzilewicz A, 1995 Analysis of Regenerative Extractions of Turbine Based on Thermal Measurements in Power Plants, VDI Berichte 1186, 1995 Erlangen, pp. 427-443, 8Search in Google Scholar

3. Gardzilewicz A and Marcinkowski S, 1997 Stage of Steam Turbine, Patent No 160-805, Warsaw, Poland (in Polish),Search in Google Scholar

4. Gardzilewicz A, Marcinkowski S, Sobera H. and Józefowicz Z 1994 Experimental Experience of Patent No. 160-805 Application in 200 MW Turbines, Energetyka (No. 3), pp. 73-78, (in Polish),Search in Google Scholar

5. Szymaniak M., Gardzilewicz A, 2009, CFD Technique Applied for the Modernisation of a Steam Turbine Construction in the Regenerative Extraction Area, Proc. IX ISAIF, Gyeongju (Korea) 2009,Search in Google Scholar

6. Szymaniak M., Świrydczuk J., Gardzilewicz A., Karcz M., 2011, Circumferential flow asymmetry in steam turbines, 9th European Conference on Turbomachinery - Fluid Dynamics and Thermodynamics, vols I and II, pp. 1435-1444, Istanbul Tech Univ, Istanbul, TURKEY, MAR 21-25, 2011Search in Google Scholar

7. Gardzilewicz A, Marcinkowski S., 2004, Corrosive-Erosive Threat to the LP Stages of Steam Turbines, Proc. XVIII Workshop on Turbomachinery, Plzen 2004,Search in Google Scholar

8. Gardzilewicz A, Marcinkowski S, Szymaniak M., 2009, Surveys and Erosion Threat Analysis of Lasts Stages of 225 MW Turbine (Power Unit 3) in Kozienice Power Station, Diagnostyka Maszyn Ltd. Report No. 6/09, (in Polish),Search in Google Scholar

9. Szymaniak M., 2012, Report on monitoring the implementation and installation of a new stage in the turbine 13K-225 unit 11 in Łaziska Power Station, IMP PAN, Report No. 913/12(in Polish)Search in Google Scholar

10. Szymaniak M., Gardzilewicz A, Gluch J., 2014, Application of new Solution for LP Stages in the Power Unit No. 7 in Kozienice Power Station, IMP PAN, Report No. 892/14, (in Polish),Search in Google Scholar

11. Gardzilewicz A, Marcinkowski S, 1993, Investigations of steam flow in the LP part of 225 MW Modernised Turbine (Power Unit 4) in Polaniec Power Station, Diagnostyka Maszyn Ltd. Report No. 6/93, (in Polish),Search in Google Scholar

12. Szymaniak M., Gardzilewicz A, 2015, CFD Calculation of New LP Stage Before the Extraction Point in a 225 MW Turbine, Conference on Modelling Fluid Flow (CMFF’15), The 16th International Conference on Fluid Flow Technologies, Budapest, Hungary, September 1-4, 2015,Search in Google Scholar

13. 13 Gardzilewicz A., Gluch J., Bogulicz M., Uzieblo W., 2002, DIAGAR Program Version 2002, Diagnostyka Maszyn Ltd. Report No. 28/02, (in Polish),Search in Google Scholar

14. Badur J., Slawinski D., 2008, Strength and Dynamic Calculation for the Patent No. P160-805, Diagnostyka Maszyn Ltd. Report No. 05/08.Search in Google Scholar

15. Graczyk P., Graczyk T., Gronert J., 2014, Technology of manufacturing and assembly of ring in the steam turbine, Posteor Ltd. Report No. 07/15, (in Polish).10.2478/bile-2013-0014Search in Google Scholar

16. Gardzilewicz A, Palzewicz A., Szymaniak M., Gluch J., Gronert J., Graczyk P., 2009, Application of new Solution for LP Stages in the Power Unit No. 3 in Polaniec Power Station, Diagnostyka Maszyn Ltd. Report No. 26/10, (in Polish).Search in Google Scholar

eISSN:
2083-7429
Language:
English
Publication timeframe:
4 times per year
Journal Subjects:
Engineering, Introductions and Overviews, other, Geosciences, Atmospheric Science and Climatology, Life Sciences