Cite

C.E. Betterton & S.J. Silver, “Detecting bottlenecks in serial production lines - A focus on interdeparture time variance,” Int J Prod Res, vol. 50, no. 15, pp. 4158–4174, Aug. 2012, doi: 10.1080/00207543.2011.596847. Search in Google Scholar

L.D. Fredendall, D. Ojha, J. Wayne Patterson, “Concerning the theory of workload control,” Eur J Oper Res, vol. 201, no. 1, pp. 99–111, Feb. 2010, doi: 10.1016/j.ejor.2009.02.003. Search in Google Scholar

N.O. Fernandes, M. Thürer, T.M. Pinho, P. Torres, and S. Carmo-Silva, “Workload control and optimised order release: an assessment by simulation,” Int J Prod Res, vol. 58, no. 10, pp. 3180–3193, May 2020, doi: 10.1080/00207543.2019.1630769. Search in Google Scholar

M. Thürer, M. Stevenson, & P. Renna, “Workload control in dual-resource constrained high-variety shops: an assessment by simulation,” Int J Prod Res, vol. 57, no. 3, pp. 931–947, Feb. 2019, doi: 10.1080/00207543.2018.1497313. Search in Google Scholar

T. Hutter, S. Haeussler, & H. Missbauer, “Successful implementation of an order release mechanism based on work-load control: a case study of a make-to-stock manufacturer,” Int J Prod Res, vol. 56, no. 4, pp. 1565–1580, Feb. 2018, doi: 10.1080/00207543.2017.1369598. Search in Google Scholar

C. Silva, M. Stevenson, & M. Thürer, “A case study of the successful implementation of workload control: A practitioner-led approach,” Journal of Manufacturing Technology Management, vol. 26, no. 2, pp. 280–296, Mar. 2015, doi: 10.1108/JMTM-10-2013-0144. Search in Google Scholar

N. Nahavandi, “CWIPL II, a mechanism for improving throughput and lead time in unbalanced flow line,” Int J Prod Res, vol. 47, no. 11, pp. 2921–2941, Jan. 2009, doi: 10.1080/00207540701725059. Search in Google Scholar

N.O. Fernandes, C. Silva, & S. Carmo-Silva, “Order release in the hybrid MTO-FTO production,” Int J Prod Econ, vol. 170, pp. 513–520, Dec. 2015, doi: 10.1016/j.ijpe.2015.03.025. Search in Google Scholar

N.O. Fernandes & S. Carmo-Silva, “Order release in a work-load controlled flow-shop with sequence-dependent set-up times,” Int J Prod Res, vol. 49, no. 8, pp. 2443–2454, Apr. 2011, doi: 10.1080/00207541003720376. Search in Google Scholar

N.O. Fernandes & S. Carmo-Silva, “Workload control under continuous order release,” Int J Prod Econ, vol. 131, no. 1, pp. 257–262, May 2011, doi: 10.1016/j.ijpe.2010.09.026. Search in Google Scholar

M. Thürer, M.J. Land, M. Stevenson, & L.D. Fredendall, “On the integration of due date setting and order release control,” Production Planning and Control, vol. 28, no. 5, pp. 420–430, Apr. 2017, doi: 10.1080/09537287.2017.1302102. Search in Google Scholar

M. Thürer, M. Stevenson, M.J. Land, & L.D. Fredendall, “On the combined effect of due date setting, order release, and output control: an assessment by simulation,” Int J Prod Res, vol. 57, no. 6, pp. 1741–1755, Mar. 2019, doi: 10.1080/00207543.2018.1504250. Search in Google Scholar

R. Singh & M. Mathirajan, “Experimental investigation for performance assessment of scheduling policies in semiconductor wafer fabrication – a simulation approach,” International Journal of Advanced Manufacturing Technology, vol. 99, no. 5–8, pp. 1503–1520, Nov. 2018, doi: 10.1007/s00170-018-2414-y. Search in Google Scholar

M. Thürer & M. Stevenson, “Bottleneck-oriented order release with shifting bottlenecks: An assessment by simulation,” Int J Prod Econ, vol. 197, pp. 275–282, Mar. 2018, doi: 10.1016/j.ijpe.2018.01.010. Search in Google Scholar

S. Kim, K. Roscoe Davis, & J.F. Cox, “An investigation of out-put flow control, bottleneck flow control and dynamic flow control mechanisms in various simple lines scenarios,” Production Planning and Control, vol. 14, no. 1, pp. 15–32, Jan. 2003, doi: 10.1080/0953728021000039416. Search in Google Scholar

A. Prabhu, K. Raghunandana, & P. Yogesh Pai, “Bottleneck shifting in serial line production: An investigation with different order release methods,” in Materials Today: Proceedings, Elsevier Ltd, 2022, pp. 1714–1720. doi: 10.1016/j.matpr.2021.11.337. Search in Google Scholar

D. Corti, A. Pozzetti, & M. Zorzini, “A capacity-driven approach to establish reliable due dates in a MTO environment,” Int J Prod Econ, vol. 104, no. 2, pp. 536–554, Dec. 2006, doi: 10.1016/j.ijpe.2005.03.003. Search in Google Scholar

M. Thürer & M. Stevenson, “The use of finite loading to guide short-term capacity adjustments in make-to-order job shops: an assessment by simulation,” Int J Prod Res, vol. 58, no. 12, pp. 3554–3569, Jun. 2020, doi: 10.1080/00207543.2019.1630771. Search in Google Scholar

S.N. Kadipasaoglu, W. Xiang, S.F. Hurley, & B.M. Khumawala, “A study on the efffect of the extent and location of protective capacity in flow systems,” Int. J. Production Economics. Vol. 63, 217–228, 2000. Search in Google Scholar

M. Thürer, M. Stevenson, C. Silva, M.J. Land, L.D. Fredendall, & S.A. Melnyk, “Lean control for make-to-order companies: Integrating customer enquiry management and order release,” Prod Oper Manag, vol. 23, no. 3, pp. 463–476, 2014, doi: 10.1111/poms.12058. Search in Google Scholar

P.R. Kumar, “Scheduling Manufacturing Systems of Re-En-trant Lines,” in Stochastic Modeling and Analysis of Manufacturing Systems, New York, NY: Springer New York, 1994, pp. 325–360. doi: 10.1007/978-1-4612-2670-3_8. Search in Google Scholar

M. Thürer & M. Stevenson, “Workload control in job shops with re-entrant flows: an assessment by simulation,” Int J Prod Res, vol. 54, no. 17, pp. 5136–5150, Sep. 2016, doi: 10.1080/00207543.2016.1156182. Search in Google Scholar

S.C. Graves, H.C. Meal, D. Stefek, & A.H. Zeghmi, “Scheduling of Re-Entrant Flow Shops,” 1983. Search in Google Scholar

Y. Arzi & D. Raviv, “Dispatching in a workstation belonging to a re-entrant production line under sequence-dependent set-up times,” Production Planning and Control, vol. 9, no. 7, pp. 690–699, Jan. 1998, doi: 10.1080/095372898233696. Search in Google Scholar

J.W. Fowler, G.L. Hogg, & S.J. Mason, “Workload control in the semiconductor industry,” Production Planning and Control, vol. 13, no. 7, pp. 568–578, Oct. 2002, doi: 10.1080/0953728021000026294. Search in Google Scholar

S.T. Enns & M.P. Costa, “The effectiveness of input control based on aggreǵate versus bottleneck work loads,” Production Planning and Control, vol. 13, no. 7, pp. 614–624, Oct. 2002, doi: 10.1080/0953728021000026258. Search in Google Scholar

S. Kim, J.F. Cox, & V.J. Mabin, “An exploratory study of protective inventory in a re-entrant line with protective capacity,” Int J Prod Res, vol. 48, no. 14, pp. 4153–4178, Jan. 2010, doi: 10.1080/00207540902991666. Search in Google Scholar

P. Neuner & S. Haeussler, “Rule based workload control in semiconductor manufacturing revisited,” Int J Prod Res, vol. 59, no. 19, pp. 5972–5991, 2021, doi: 10.1080/00207543.2020.1797208. Search in Google Scholar

S. Haeussler, P. Neuner, & M. Thürer, “Balancing earliness and tardiness within workload control order release: an assessment by simulation,” Flex Serv Manuf J, vol. 35, no. 2, pp. 487–508, Jun. 2023, doi: 10.1007/s10696-021-09440-9. Search in Google Scholar

F. Costa, K. Kundu, M. Rossini, & A. Portioli-Staudacher, “Comparative study of bottleneck-based release models and load-based ones in a hybrid MTO-MTS flow shop: an assessment by simulation,” Operations Management Research, vol. 16, no. 1, pp. 33–48, Mar. 2023, doi: 10.1007/s12063-022-00276-6. Search in Google Scholar

N.O. Fernandes, M. Thürer, & M. Stevenson, “Direct Workload Control: simplifying continuous order release,” Int J Prod Res, vol. 60, no. 4, pp. 1424–1437, Feb. 2022, doi: 10.1080/00207543.2020.1857451. Search in Google Scholar

M. Thürer & M. Stevenson, “Order release, dispatching and resource assignment in multiple resource-constrained job shops: an assessment by simulation,” Int J Prod Res, vol. 60, no. 12, pp. 3669–3681, Jun. 2022, doi: 10.1080/00207543.2021.1930240. Search in Google Scholar

M. Thürer, N.O. Fernandes, S. Haeussler, & M. Stevenson, “Dynamic planned lead times in production planning and control systems: does the lead time syndrome matter?,” Int J Prod Res, vol. 61, no. 4, pp. 1268–1282, Feb. 2023, doi: 10.1080/00207543.2022.2034193. Search in Google Scholar

P. Bortolotti et al., “A Detailed Wind Turbine Blade Cost Model,” 2019. [Online]. Available: www.nrel.gov/publications.Search in Google Scholar

R.G. Sargent, “Verification and validation of simulation models,” in Proceedings of the 2010 Winter Simulation Conference, IEEE, Dec. 2010, pp. 166–183. doi: 10.1109/WSC.2010.5679166. Search in Google Scholar

M. Land & G. Gaalman, “International journal of production economics ELSEVIER Workload control concepts in job shops A critical assessment,” 1996. Search in Google Scholar

M. Thürer, N.O. Fernandes, M. Stevenson, & T. Qu, “On the backlog-sequencing decision for extending the applicability of ConWIP to high-variety contexts: an assessment by simulation,” Int J Prod Res, vol. 55, no. 16, pp. 4695–4711, Aug. 2017, doi: 10.1080/00207543.2017.1281462. Search in Google Scholar

M. Thürer, M. Stevenson, & C. Silvaa, “Three decades of workload control research: A systematic review of the literature,” International Journal of Production Research, vol. 49, no. 23. pp. 6905–6935, Dec. 01, 2011. doi: 10.1080/00207543.2010.519000. Search in Google Scholar

M.L. Spearman, D.L. Woodruff, & W.J. Hopp, “CONWIP: A pull alternative to kanban,” Int J Prod Res, vol. 28, no. 5, pp. 879–894, May 1990, doi: 10.1080/00207549008942761. Search in Google Scholar

M. Thürer, M. Stevenson, C. Silva, & T. Qu, “Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation,” Int J Prod Econ, vol. 188, pp. 116–127, Jun. 2017, doi: 10.1016/j.ijpe.2017.03.025. Search in Google Scholar

M. Thürer, T. Qu, M. Stevenson, C.D. Li, & G.Q. Huang, “De-constructing bottleneck shiftiness: the impact of bottleneck position on order release control in pure flow shops,” Production Planning and Control, vol. 28, no. 15, pp. 1223–1235, Nov. 2017, doi: 10.1080/09537287.2017.1362486. Search in Google Scholar

W.G. Gilland, “A simulation study comparing performance of CONWIP and bottleneck-based release rules,” Production Planning and Control, vol. 13, no. 2, pp. 211–219, Mar. 2002, doi: 10.1080/09537280110069784. Search in Google Scholar

R. Singh & M. Mathirajan, “Investigation of different inputs and a new release policy in the proposed simulation model for wafer fabrication system,” Sādhanā, vol. 44, no. 2, p. 41, Feb. 2019, doi: 10.1007/s12046-018-1006-8. Search in Google Scholar

M. Thürer & M. Stevenson, “Card-based delivery date promising in pure flow shops with order release control,” Int J Prod Res, vol. 54, no. 22, pp. 6798–6811, Nov. 2016, doi: 10.1080/00207543.2016.1177672. Search in Google Scholar

C.E. Betterton & J.F. Cox, “Espoused drum-buffer-rope flow control in serial lines: A comparative study of simulation models,” Int J Prod Econ, vol. 117, no. 1, pp. 66–79, Jan. 2009, doi: 10.1016/j.ijpe.2008.08.050 Search in Google Scholar