Abdul-Rahman, H., Mohammed Ali Berawi, A. R. Berawi, O. Mohamed, M. Othman, and I. A. Yahya. (2006). “Delay mitigation in the Malaysian construction industry”, Journal of construction engineering and management 132, no. 2: 125-133.10.1061/(ASCE)0733-9364(2006)132:2(125)Search in Google Scholar

Ahmed, S. M., Azhar, S., Kappagantula, P., & Gollapudi, D. (2003). “Delays in: A brief study of the Florida construction industry”, In Proceeding of the 39th Annual Conference of the Associated Schools of Construction. Clemson, South Carolina: Clemson University. Final report, Miami F (Vol. 1, p. 33174).Search in Google Scholar

Aibinu, A. A., & Jagboro, G. O. (2002). “The effects of construction delays on project delivery in Nigerian construction industry”, International journal of project management, 20(8), 593-599.10.1016/S0263-7863(02)00028-5Search in Google Scholar

Bromilow, F. J. (1974). “Measurement and scheduling of construction time and cost performance in the building industry”, The Chartered Builder, 10(9), 57-65.Search in Google Scholar

Jhatial, A. A., Sohu, S., Bhatti, N. K., Lakhiar, M. T., & Oad, R. (2018). “Effect of steel fibres on the compressive and flexural strength of concrete”, International journal of advanced and applied sciences, 5(10), 16-21.10.21833/ijaas.2018.10.003Search in Google Scholar

Kumaraswamy, M. M., & Chan, D. W. (1998). “Contributors to construction delays”, Construction Management & Economics, 16(1), 17-29.10.1080/014461998372556Search in Google Scholar

Frimpong, Y., & Oluwoye, J. (2003). “Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana”, Journal of Construction Research, 4(02), 175-187.10.1142/S1609945103000418Search in Google Scholar

Harris, M., & Fraser, I. (2002). “Natural resource accounting in theory and practice: A critical assessment”, Australian Journal of Agricultural and Resource Economics, 46(2), 139-192.10.1111/1467-8489.00018Search in Google Scholar

Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). “Factors influencing construction time and cost overruns on high-rise projects in Indonesia”, Construction Management & Economics, 15(1), 83-94.10.1080/014461997373132Search in Google Scholar

Lundin, R. A., Tryggestad, K., Amoatey, C. T., Ameyaw, Y. A., Adaku, E., & Famiyeh, S. (2015). “Analysing delay causes and effects in Ghanaian state housing construction projects”, International Journal of Managing Projects in Business.Search in Google Scholar

Keerio, M. A., Sohu, S., Mangi, S. A., Bhatti, N. U. K., & Ullah, K. (2017). “Significant Causative Factors of Delay in Road Construction Projects in Pakistan”, Engineering Science and Technology International Research Journal, Vol.1, No.2, 2017, pp. 59 – 63.Search in Google Scholar

Sambasivan, M., & Soon, Y. W. (2007). “Causes and effects of delays in Malaysian construction industry”, International Journal of project management, 25(5), 517-526.10.1016/j.ijproman.2006.11.007Search in Google Scholar

Shen, L. Y. (1997). “Project risk management in Hong Kong”, International journal of project management, 15(2), 101-105.10.1016/S0263-7863(96)00045-2Search in Google Scholar

Shen, L. Y., Fisher, N., & Sun, C. S. (2001). “An analysis of the distribution of cost variance for building projects”, Journal of Construction Research, 2(1), 35-40.Search in Google Scholar

Sohu, S., Ullah, K., Jhatial, A. A., Jaffar, M., & Lakhiar, M. T. (2018a). “Factors adversely affecting quality in highway projects of Pakistan”, International Journal of Advanced and Applied Sciences, 5(10), 62-66.Search in Google Scholar

Sohu, S., Jhatial, A. A., Ullah, K., Lakhiar, M. T., & Shahzaib, J. (2018b). “Determining the critical success factors for highway construction projects in Pakistan”, Engineering, Technology & Applied Science Research, 8(2), 2685-2688.10.48084/etasr.1866Search in Google Scholar

Mehr, S. Y., & Omran, A. (2013). “Examining The Challenges Affect On The Effectiveness Of Materials Management In The Malaysian Construction Industry”, International Journal of Academic Research, 5(2).10.7813/2075-4124.2013/5-2/A.7Search in Google Scholar

Ullah, K., Khan, M. S., Lakhiar, M. T., Vighio, A. A., & Sohu, S. (2018). “Ranking of Effects of Construction Delay: Evidence from Malaysian Building Projects”, Journal of Applied Engineering Sciences, 8(1), 79-84.10.2478/jaes-2018-0011Search in Google Scholar

eISSN:
2284-7197
ISSN:
2247-3769
Language:
English
Publication timeframe:
2 times per year
Journal Subjects:
Engineering, Introductions and Overviews, other, Electrical Engineering, Energy Engineering, Geosciences, Geodesy