[Abdullah, M. R., Rahman, I. A., & Azis, A. A. A., 2010. Causes of Delay in MARA Management Procurement Construction Projects. Journal of Surveying, Construction & Property, 1(1), 123–138.10.22452/jscp.vol1no1.6]Search in Google Scholar
[Aibinu, A. A., & Jagboro, G. O., 2002. The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593–599.10.1016/S0263-7863(02)00028-5]Search in Google Scholar
[Al-Najjar, J., 2008. Factors influencing time and cost overruns on construction projects in the Gaza Strip. The Islamic University of Gaza Master Thesis.]Search in Google Scholar
[Amu, O. O., & Adesanya, D. A., 2011. Mathematical expressions for explaining project delays in south western Nigeria. Singapore Journal of Scientific Research, 1(1), 59–67.10.3923/sjsres.2011.59.67]Search in Google Scholar
[Assaf, S. A., & Al-Hejji, S., 2006. Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349–357.10.1016/j.ijproman.2005.11.010]Search in Google Scholar
[Aziz, R. F., 2013. Ranking of delay factors in construction projects after Egyptian revolution. Alexandria Engineering Journal, 52(3), 387–406.10.1016/j.aej.2013.03.002]Search in Google Scholar
[Azlan, O., & Syuhada, I., 2014. Delay in Government Project Delivery in Kedah, Malaysia. In Recent Advances in Civil Engineering and Mechanics (pp. 248–254).]Search in Google Scholar
[Denini, F., 2012. Causes, effects and methods of minimizing delays on large construction projects in Libya. In 6th International Conference and Workshop on the Built Environment in Developing Countries. Adelaide, Australia.]Search in Google Scholar
[Enshassi, A., Kumaraswamy, M., & Al-najjar, J., 2010. Significant Factors Causing Time and Cost Overruns in Construction Projects in the Gaza Strip: Contractors’ Perspective. International Journal of Construction Management, 10(1), 35–60.10.1080/15623599.2010.10773137]Search in Google Scholar
[Fugar, F. D. K., & Agyakwah-baah, A. B., 2010. Delays in building construction projects in Ghana. Australasian Journal of Construction Economics and Building, 10(1/2), 103–116.10.5130/ajceb.v10i1/2.1592]Search in Google Scholar
[Haseeb, M., & Bibi, A., 2011. Problems of Projects and Effects of Delays in the Construction Industry of Pakistan. Australian Journal of Business and Management Research, 1(5), 41–50.10.52283/NSWRCA.AJBMR.20110106A05]Search in Google Scholar
[Jarkas, A. M., & Bitar, C. G., 2012. Factors Affecting Construction Labor Productivity in Kuwait. Journal of Construction Engineering and Management, 138(7), 811–820.10.1061/(ASCE)CO.1943-7862.0000501]Search in Google Scholar
[Kikwasi, G. J., 2012. Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania. Australasian Journal of Construction Economics and Building, 1(2), 52–59.10.5130/ajceb-cs.v1i2.3166]Search in Google Scholar
[Litwin, M. S., 1995. How to Measure Survey Reliability and Validity. Thousand Oaks, Calif, USA: Sage.10.4135/9781483348957]Search in Google Scholar
[Majid, I. A., 2006. Causes and effects of delays in Aceh construction Industry. Master Thesis, Universiti Teknologi Malaysia.]Search in Google Scholar
[Muhwezi, L., Chamuriho, L. M., & Lema, N. M., 2012. An investigation into materials wastes on building construction projects in Kampala, Uganda. Scholarly Journal of Engineering Research, 1(1), 11–18.]Search in Google Scholar
[Sambasivan, M., & Soon, Y. W., 2007. Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526.10.1016/j.ijproman.2006.11.007]Search in Google Scholar
[Senouci, A., Ismail, A., & Eldin, N., 2016. Time Delay and Cost Overrun in Qatari Public Construction Projects. Procedia Engineering, 164, 368–375.10.1016/j.proeng.2016.11.632]Search in Google Scholar
[Sincich, T. L., Levine, D. M., & Stephan, D. F., 2002. Practical Statistics by Example Using Microsoft Excel and Minitab. (Second, Ed.). Prentice Hall, Upper Saddle River, New Jersey.]Search in Google Scholar
[Tikote, R., Magdum, M., & Khandare, M., 2017. Delay Analysis in Industrial Projects by Using Relative Importance Index Method. International Research Journal of Engineering and Technology, 4(6), 1982–1988.]Search in Google Scholar
[Tumi, S. A. H., Omran, A., & Pakir, A. H. K., 2009. Causes of Delay in Construction Industry in Libya. In The International Conference on Economics and Administration (pp. 265–272). Romania.]Search in Google Scholar