[Adamides, E.D. & Karacapilidis, N. (2006). A knowledge centred framework for collaborative business process modelling. Business Process Management Journal, 5, 557-575.10.1108/14637150610690993]Open DOISearch in Google Scholar
[Alibabaei, A., Aghdasi, M., Zarei, B., & Stewart, G. (2010). The role of culture in business process management initiatives. Australian Journal of Basic and Applied Sciences, 4, 2143–2154. Retrieved from: http://eprints.qut.edu.au/43250/, Assessed on 11. November 2017.]Search in Google Scholar
[Andersen, B. (1999). Business Process Improvement Toolbox. Milwaukee: ASQ Quality Press.]Search in Google Scholar
[Bai,Ch. & Sarkis, J. (2013). A grey-based DEMATEL model for evaluating business process management critical success factors. International Journal of Production Economics, 146 (1), 281-29210.1016/j.ijpe.2013.07.011]Search in Google Scholar
[Bandara, W., Alibabaei, A. & Aghdasi, M. (2009). Means of achieving Business Process Management success factors. In: Proceedings of the 4th Mediterranean Conference on Information Systems, Athens University of Economics and Business, Athens.]Search in Google Scholar
[Benner,M. J. & Tushman, M. L. (2003). Exploitation, exploration, and process management: The productivity dilemma revisited. The Academy of Management Review, 28(2), 238–256.10.5465/amr.2003.9416096]Open DOISearch in Google Scholar
[Bosilj-Vukšić, V., Spremić, M., Omazić, M.A., Vidović, M. & Hernaus, T. (2006). Menadžment poslovnih procesa i znanja u hrvatskim poduzećima. EFZG working paper series, (05), 1-20.]Search in Google Scholar
[Cantista, I. & Tylecote, A. (2008). Industrial Innovation, Corporate Governance and Supplier-Customer Relationships. Journal of Manufacturing Technology Management, 19(5), 516-590.10.1108/17410380810877267]Search in Google Scholar
[Chae, B., Yen, H. R., & Sheu, C. (2005). Information technology and supply chain collaboration: Moderating effects of existing relationships between partners. IEEE Transactions on Engineering Management, 52(4), 440–448.10.1109/TEM.2005.856570]Open DOISearch in Google Scholar
[Chen, I.J. (2001). Planning for ERP systems: analysis and future trend. Business Process Management Journal, 7(5), 374-86.10.1108/14637150110406768]Open DOISearch in Google Scholar
[Duh, R.-R., Chow, C. W. & Chen, H. (2006). Strategy, IT applications for planning and control, and firm performance: The impact of impediments to IT implementation. Information & Management, 43(8), 939–949.10.1016/j.im.2006.08.007]Search in Google Scholar
[Erl, T. (2005) Service-oriented architecture concepts, technology and design. Upper Saddle River. NJ: Pearson Education.]Search in Google Scholar
[Fisher, D.M. (2004). The Business Process Maturity Model—A Practical Approach for Identifying Opportunities for Optimization. Bearing Point, Inc. Retrieved from: http://www.bptrends.com/publicationfiles/1004%20ART%20BP%20Maturity%20Model%20-%20Fisher.pdf, Assessed on 10. December 2017.]Search in Google Scholar
[Garimella, K., Lees, M. & Williams, B. (2008). BPM Basics for Dummies. Software AG Special Edition. Wiley Publishing, Inc., Indiana: Indianapolis.]Search in Google Scholar
[Hall, J. M. & Johnson, M. E. (2009). When should a process be art, not science?. Harvard Business Review, (March), 59–65.]Search in Google Scholar
[Hammer, M., & Stanton, S. (1999) How process enterprises really work. Harvard Business Review, 77(6), 108–118.]Search in Google Scholar
[Harmon, P. (2003). Business process change: A manager’s guide to improving, redesigning and automating processes. San Francisco: Morgan Kaufmann.]Search in Google Scholar
[Harmon, P. (2014). Business Process Change.: A Business Process Management Guide for Managers and Process Professionals (3nd ed). Burlington: Morgan Kaufmann.]Search in Google Scholar
[Hassan, N. R. (2009). Using social network analysis to measure IT-enabled business process performance, Information Systems Management, 26(1), 61–7610.1080/10580530802557762]Open DOISearch in Google Scholar
[Herzig, S. E. & Jimmieson, N. L. (2006). Middle managers’ uncertainty management during organizational change. Leadership & Organization Development Journal, 27(8), 628–645.10.1108/01437730610709264]Search in Google Scholar
[Hiemstra,A. Ravesteyn,P & Versendaal J. (2009). An alignment model for business process management and service oriented architecture. In: 6th intenational conference on enterprice, systems, accounting and logistics.]Search in Google Scholar
[Jarrar, Y. F., Al-Mudimigh, A. & Zairi, M. (2000). ERP implementation critical success factors-the role and impact of business process management. In Management of Innovation and Technology, ICMIT 2000.1, 122-127.10.1109/ICMIT.2000.917299]Search in Google Scholar
[Jeston, J. & Nelis, J. (2014). Business process management. New York: Routledge.10.4324/9780203081327]Search in Google Scholar
[Koster, S. (2009). An evaluation method for Business Process Management products. Graduation thesis. Business Information Technology. University of Twente. Netherlans10.1007/978-3-642-12186-9_42]Search in Google Scholar
[Küng, P. & Hagen, C. (2007). The fruits of business process management: An experience report from a Swiss bank. Business Process Management Journal, 13(4), 477–487.10.1108/14637150710763522]Open DOISearch in Google Scholar
[Lahajnar, S. & Rožanec, A. (2016). The evaluation framework for business process management methodologies. Management, 21(1), 47-69.]Search in Google Scholar
[Leavitt, H. (2005). Top down: Why hierarchies are here to stay and how to manage them more effectively. Boston: Harvard Business School Press.]Search in Google Scholar
[Madison J. D. (2005). Process Mapping, Process Improvement and Process Mangement – A Practical Guide to Enhancing Work and Information Flow. Chico: Paton Press.]Search in Google Scholar
[Melenovsky, M.J. & Sinur, J. (2006). BPM maturity model identifies six phases for successful BPM adoption, Gartner Research, ID No: G00142643 18 October.]Search in Google Scholar
[Melville,N., Kraemer,K. & Gurbaxani,V. (2004). Information technology and organizational performance: An integrative model of IT business value. MIS Quarterly, 28(2), 283–322.10.2307/25148636]Open DOISearch in Google Scholar
[Mulyar, N. & van der Aalst, W. M. P. (2005). Towards a pattern language for colored Petri nets. Paper presented at the sixth workshop and tutorial on practical use of coloured Petri nets and the CPN tools. Retrieved from: http://www.pads.rwthaachen.de/wvdaalst/publications/p288.pdf, Assessed on 20. November 2017.]Search in Google Scholar
[Ngai, E. W. T., Law, C. C. H., & Wat, F. K. T. (2008). Examining the critical success actors in the adoption of enterprise resource planning. Computers in Industry, 59(6), 48–564.10.1016/j.compind.2007.12.001]Search in Google Scholar
[Radosavljević, M. (2015). Process Orientation as a Basis for increasing supply chain Management Maturity. Economic Themes, 53(3), 398-414.10.1515/ethemes-2015-0023]Search in Google Scholar
[Ravesteyn, P. & Batenburg, R. (2010). Surveying the critical success factors of BPM-systems implementation. Business Process Management Journal,16(3), 492-507.10.1108/14637151011049467]Open DOISearch in Google Scholar
[Ravesteyn, P. & Versendaal, J. (2007). Success factors of business process management systems implementation. ACIS Proceedings, 60, 396-406.]Search in Google Scholar
[Reijers, H. A. & Mansar, L. (2005). Best practices in business process redesign: An overview and qualitative evaluation of successful redesign heuristics. Omega, 33(4), 283–30610.1016/j.omega.2004.04.012]Search in Google Scholar
[Rhee, M. & Mehra, S. (2006). Aligning operations, marketing, and competitive strategies to enhance performance: An empirical test in the retail banking industry. Omega, 34(5), 505-515.10.1016/j.omega.2005.01.017]Search in Google Scholar
[Roberts, EB. (2001). Benchmarking Global Strategic Management of Technology. Res. Technol. Manage, 44(2), 25-36.10.1080/08956308.2001.11671416]Open DOISearch in Google Scholar
[Rosemann, M. & De Bruin, T. (2005a) Application of a Holistic Model for Determining BPM Maturity. BPTrends, p. 1-20.]Search in Google Scholar
[Rosemann, M. & De BruinT. (2005b).Toward s a Business Process Management Maturity Model. 13th European Conference on Information Systems (ECIS 2005), Regensburg, Germany.]Search in Google Scholar
[Rosemann, M. (2006). Potential pitfalls of process modeling: part A. Business Process Management Journal, 12 (2), 249-254.10.1108/14637150610657567]Open DOISearch in Google Scholar
[Rosemann, M. & vom Brocke, J. (2010). The six core elements of business process management. In: vom Brocke, J. & Rosemann, M. (Eds.), Handbook on business process management, Introduction, methods and information systems 1, 109–124, Springer, Berlin.10.1007/978-3-642-00416-2_5]Search in Google Scholar
[Savolainen, T. I. (1999). Cycles of continuous improvement: Realizing competitive advantages through quality. International Journal of Operations & Production Management, 19(11), 1203–1222.10.1108/01443579910291096]Open DOISearch in Google Scholar
[Sharp, A. & McDermott, P. (2009). Workflow modelling: tools for process improvement and applications development. Norwood: Artech House, MA.]Search in Google Scholar
[Sikavica, P., & Hernaus, T. (2011). Dizajniranje organizacije. Novi informator, Zagreb.]Search in Google Scholar
[Silvestro, R. & Westley, C. (2002). Challenging the paradigm of the process enterprise: A case-study analysis of BPR implementation. Omega, 30(3), 215–225.10.1016/S0305-0483(02)00028-2]Search in Google Scholar
[Štemberger, M. I., Bosilj-Vukšić, V., & Jaklić, M. I. (2009). Business process management software selection–two case studies. Economic research - Ekonomska istraživanja, 22(4), 84-99.10.1080/1331677X.2009.11517393]Search in Google Scholar
[Terziovski, M., Fitzpatrick, P. & O’Neill, P. (2003). Successful predictors of business process reengineering (BPR) in financial services. International Journal of Production Economics, 84(1), 35–50.10.1016/S0925-5273(02)00378-X]Search in Google Scholar
[Trkman, P. & McCormack, K. (2010). Estimating the benefits and risks of implementing eprocurement. IEEE Transactions on Engineering Management, 57(2), 338–349.10.1109/TEM.2009.2033046]Open DOISearch in Google Scholar
[Trkman, P. (2010). The critical success factors of business process management. International journal of information management, 30(2), 125-134.10.1016/j.ijinfomgt.2009.07.003]Search in Google Scholar
[Valle S, & Vázquez Bustelo, D. (2009). Involving suppliers in new product development: An Analysis of Spanish Firms. Universia Bus. Rev., 24, 62-75.]Search in Google Scholar
[vom Brocke, J. & Schmiedel, T. (2011). Towards a conceptualisation of BPM culture: Results from a literature review.15th Pacific Asia Conference on Information Systems, Brisbane, Australia: In PACIS Proceedings. Retrieved from: https://webdocs.uni.li/public/03805967.PDF, Assessed on 10. December 2017.]Search in Google Scholar
[Weske, M. (2007). Business process management. Concepts, languages and architectures. Berlin Heidelberg, Springer.]Search in Google Scholar