Cite

Arashpour, M., Bai, Y., Aranda-Mena, G., Bab-Hadiashar, A., Hosseini, R., & Kalutara, P. (2017). Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction. Automation in Construction, 84, 146-153.10.1016/j.autcon.2017.08.032Search in Google Scholar

Ashcraft, Jr., H. W. (2011). Negotiating an integrated project delivery agreement. San Francisco, USA: Hanson Bridgett.Search in Google Scholar

Astour, H., & Franz, V. (2014). BIM- and simulation-based site layout planning. 2014 International Conference on Computing in Civil and Building Engineering, 291-298.10.1061/9780784413616.037Search in Google Scholar

Azhar, S. (2011). Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and management in engineering, 11(3), 241-252.10.1061/(ASCE)LM.1943-5630.0000127Search in Google Scholar

Becerik-Gerber, B., Jazizadeh, F., Li, N., & Calis, G. (2011). Application areas and data requirements for BIMenabled facilities management. Journal of construction engineering and management, 138(3), 431-442.10.1061/(ASCE)CO.1943-7862.0000433Search in Google Scholar

Bryde, D., Broquetas, M., & Volm, J. M. (2013). The project benefits of building information modelling (BIM). International Journal of Project Management, 31(7), 971-980.10.1016/j.ijproman.2012.12.001Search in Google Scholar

Choi, J., & Kim, I. (2008). An approach to share architectural drawing information and document information for automated code checking system. Tsinghua Science & Technology, 13, 171-1178.10.1016/S1007-0214(08)70145-7Search in Google Scholar

Crnković, D., & Vukomanović, M. (2016). Comparison of trends in risk management theory and practices within the construction industry. Electronic Journal of the Faculty of Civil Engineering Osijek, 7(13), 1-11.10.13167/2016.13.1Search in Google Scholar

Ding, L. Y., Zhou, Y., Luo, H. B., & Wu, X. G. (2012). Using nD technology to develop an integrated construction management system for city rail transit construction. Automation in Construction, 21, 64-73.10.1016/j.autcon.2011.05.013Search in Google Scholar

Eastman, C. (2009). Automated assessment of early concept designs. Architectural Design, 79(2), 52-57.10.1002/ad.851Search in Google Scholar

Ejdys, J. (2014). Future oriented strategy for SMEs. Procedia – Social and Behavioral Sciences, 156, 8-12. doi:10.1016/j.sbspro.2014.11.11010.1016/j.sbspro.2014.11.110Open DOISearch in Google Scholar

Elbeltagi, E., & Dawood, M. (2011). Integrated visualized time control system for repetitive construction projects. Automation in Construction, 20(7), 940-953.10.1016/j.autcon.2011.03.012Search in Google Scholar

El-Rayes, K., & Khalafallah, A. (2005). Trade-off between safety and cost in planning construction site layouts. Journal of Construction Engineering and Management, 131(11), 1186-1195.10.1061/(ASCE)0733-9364(2005)131:11(1186)Search in Google Scholar

Fink, L. (2014). The effect of customer focus competence on construction project performance. Procedia-Social and Behavioral Sciences, 119, 427-436.10.1016/j.sbspro.2014.03.048Search in Google Scholar

Fischer, M., Khanzode, A., Reed, D., & Ashcraft, H. W. (2017). Integrating Project Delivery. New Jersey, USA: John Wiley & Sons.10.1002/9781119049272Search in Google Scholar

Gerrish, T., Ruikar, K., Cook, M., Johnson, M., Phillip, M., & Lowry, C. (2017). BIM application to building energy performance visualisation and management: Challenges and potential. Energy and Buildings, 144, 218-228.10.1016/j.enbuild.2017.03.032Search in Google Scholar

Greenwood, D., Lockley, S., Malsane, S., & Matthews, J. (2010). Automated compliance checking using building information models. London, England: RICS.Search in Google Scholar

Hardin, B., & McCool, D. (2015). BIM and Construction Management: Proven Tools, Methods, and Workflows. Indianapolis, USA: John Wiley & Sons.Search in Google Scholar

Harris, J. (2013). Integration of BIM and Business Strategy. Evanston, USA: Northwestern University.Search in Google Scholar

Hartmann, T., van Meerveld, H., Vossebeld, N., & Adriaanse, A. (2012). Aligning building information model tools and construction management methods. Automation in Construction, 22, 605-613.10.1016/j.autcon.2011.12.011Search in Google Scholar

Heesom, D., & Mahdjoubi, L. (2004). Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(2), 171-182.10.1080/0144619042000201376Search in Google Scholar

Hjelseth, E. (2015). BIM-based model checking (BMC). Building Information Modeling – Applications and Practices, 33-61.10.1061/9780784413982.ch02Search in Google Scholar

Isaac, S., Curreli, M., & Stoliar, Y. (2017). Work packaging with BIM. Automation in Construction, 83, 121-133.10.1016/j.autcon.2017.08.030Search in Google Scholar

Juszczyk, M., Tomana, A., & Bartoszek, M. (2016). Current Issues of BIM-based Design Change Management. Analysis and Visualization. Procedia Engineering, 164, 518-525.10.1016/j.proeng.2016.11.653Search in Google Scholar

Kuenzel, R., Teizer, J., Mueller, M., & Blickle, A. (2016). SmartSite: Intelligent and autonomous environments, machinery, and processes to realize smart road construction projects. Automation in Construction, 71, 21-33.10.1016/j.autcon.2016.03.012Search in Google Scholar

Martínez-Rojas, M., Marín, N., & Miranda, M. A. V. (2016). An intelligent system for the acquisition and management of information from bill of quantities in building projects. Expert Systems with Applications, 63, 284-294.10.1016/j.eswa.2016.07.011Search in Google Scholar

Migilinskas, D., Popov, V., Juocevicius, V., & Ustinovichius, L. (2013). The benefits, obstacles and problems of practical BIM implementation. Procedia Engineering, 57, 767-774.10.1016/j.proeng.2013.04.097Search in Google Scholar

Migilinskas, D., & Ustinovichius, L. (2006). Computeraided modelling, evaluation and management of construction projects according to PLM concept. In Y. Luo (Ed.), International Conference on Cooperative Design, Visualization and Engineering (pp. 242-250). Berlin, Germany: Springer.10.1007/11863649_30Search in Google Scholar

Reizgevičius, M., Reizgevičiūtė, L., & Ustinovičius, L. (2015). The need of BIM technologies implementation to design companies. Ekonomia i Zarządzanie, 7(4), 45-53.Search in Google Scholar

Reizgevičius, M., Ustinovičius, L., Cibulskienė, D., Kutut, V., & Nazarko, L. (2018). Promoting Sustainability through Investment in Building Information Modeling (BIM) Technologies: A Design Company Perspective. Sustainability, 10(3), 600. doi:10.3390/su1003060010.3390/su10030600Open DOISearch in Google Scholar

Smith, P. (2014). Why Supplier Management should be central to your procurement thinking. OFS Portal LLC. Retrieved from https://ofs-portal.com/Search in Google Scholar

Shi, Q., Ding, X., Zuo, J., & Zillante, G. (2016). Mobile Internet based construction supply chain management: A critical review. Automation in Construction, 72, 143-154.10.1016/j.autcon.2016.08.020Search in Google Scholar

Sobieraj, J. (2017). Impact of spatial planning on the preinvestment phase of the development process in the residential construction field. Archives of Civil Engineering, 63(2), 113-130.10.1515/ace-2017-0020Search in Google Scholar

Талапов, В. (2017). Основы BIM: введение в информационное моделирование зданий [Basics of BIM: an introduction to Building Information Modeling]. Moscow, Russia: DMK Press.Search in Google Scholar

Tomana, A. (2016). BIM Innowacyjna technologia w budownictwie: podstawy, standardy, narzędzia [BIM Innovative technology in construction: foundations, standards, tools]. Warsaw, Poland: PWB Media Zdziebłowski.Search in Google Scholar

Tommelein, I. D., Levitt, R. E., & Hayes-Roth, B. (1992). Site-layout modeling: how can artificial intelligence help? Journal of Construction Engineering and Management, 118(3), 594-611.10.1061/(ASCE)0733-9364(1992)118:3(594)Search in Google Scholar

Trani, M. L., Cassano, M., Todaro, D., & Bossi, B. (2015). BIM level of detail for construction site design. Procedia Engineering, 123, 581-589.10.1016/j.proeng.2015.10.111Search in Google Scholar

Tserng, H. P., Ho, S. P., & Jan, S. H. (2014). Developing BIM-assisted as-built schedule management system for general contractors. Journal of Civil Engineering and Management, 20(1), 47-58.10.3846/13923730.2013.851112Search in Google Scholar

Ustinovičius, L., Rasiulis, R., Nazarko, L., Vilutienė, T., & Reizgevicius, M. (2015). Innovative research projects in the field of Building Lifecycle Management. Procedia Engineering, 122, 166-171.10.1016/j.proeng.2015.10.021Search in Google Scholar