Cite

Abramovsky, L., Bond, S., Harrison, R., & Simpson, H. (2005). Election Briefing Note No. 6. London, United Kingdom: The Institute for Fiscal Studies.Search in Google Scholar

Adams, S. (1989). Practical Buildability. Construction Industry Research and Information Association (CIRIA), Building Design Report.Search in Google Scholar

Agyarkwah-Baah, A., & Fugar, F. DK. (2010). Delays in Building Construction in Ghana. Australian Journal of Construction Economics and Building, 10(1/2), 103–116. https://doi.org/10.5130/ajceb.v10i1/2.159210.5130/ajceb.v10i1/2.1592Search in Google Scholar

Akomah, B. B., Boakye, N. A., & Fugar, F. D. K. (2010). Safety on construction sites: The role of the employer and employee. In S. Laryea, R. Leiringer, & W. Hughes (Eds.). Proceedings of the West Africa Built Environment Research (WABER) Conference (pp. 477–49). Accra, Ghana.Search in Google Scholar

Akomah, B. B., Zakari, M., & Enoch Ayeh, E. (2020). Impact of Cost of Construction Projects in Cape Coast Metropolis. Buletinul Institutului Politehnic Din Iaşi, 66(1), 95–112.Search in Google Scholar

Alinaitwe, H., Mwakali, J., & Hanson, B. (2007). Factors Affecting the Productivity of Building Craftsmen - Studies of Uganda. Journal of Civil Engineering and Management, 13(3), 169–176. https://doi.org/10.3846/13923730.2007.963643410.3846/13923730.2007.9636434Search in Google Scholar

Allmon, E., Haas, C. T., Borcherding, J. D., & Goodrum, P. M. (2000). U.S. Construction Labour Productivity Trends, 1970–1998. Journal of Construction Engineering and Management, 126(2), 97–104. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:2(97)10.1061/(ASCE)0733-9364(2000)126:2(97)Search in Google Scholar

Amoah, P., Ahadzie, D. K., & Dansoh, A. (2007). The Factors Affecting Construction Performance: The Perspective of Small-Scale in Ghana Building Contractors. The Ghana Surveyor Journal, 4(1), 41–48.Search in Google Scholar

Asibuodu, U. R., & Stewart, P. (2015). Investigating Factors that Influence Construction Productivity - A Review of the Literature. United Kingdom: University of Salford Manchester.Search in Google Scholar

Banks, G. (2012). Productivity policies: the ‘to do’ list. Economic and Social Outlook Conference, ‘Securing the Future’. Melbourne, Australia: Productivity Commission.Search in Google Scholar

Barg, J. E., Ruparathna, R., Mendis, D., & Hewage, K. N. (2014). Motivating Workers in Construction. Journal of Construction Engineering, 1–11. https://doi.org/10.1155/2014/70308410.1155/2014/703084Search in Google Scholar

Bernard, H. R. (2002). Research Methods in Anthropology: Qualitative and Quantitative Methods (3rd ed.). California, USA: Alta Mira Press.Search in Google Scholar

Cetin, I. (2013). Motivation and its impact on labour productivity at hotel business “a conceptual study”. International Journal of New Trends in Arts, Sports & Science Education, 2(1), 70–79.Search in Google Scholar

Cox, R. F. Issa, R. R. A. and Koblegard, K. (2005). Management’s perception of key behavioural indicators for construction. Journal of Construction Engineering and Management, 131(3), 368–376. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(368)10.1061/(ASCE)0733-9364(2005)131:3(368)Search in Google Scholar

Dai, J., Goodrum, P. M., & Maloney, W. F. (2009a). Construction Craft Workers’ Perceptions of the Factors Affecting their Productivity. Journal of Construction Engineering and Management, 135(3), 217–226. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(217)10.1061/(ASCE)0733-9364(2009)135:3(217)Search in Google Scholar

Dai, J., Goodrum, P. M., Maloney, W. F., & Srinivasan, C. (2009b). Latent Structures of the Factors Affecting Construction Labour Productivity. Journal of Construction Engineering and Management, 135(5), 397–406. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:5(397)10.1061/(ASCE)0733-9364(2009)135:5(397)Search in Google Scholar

Dozzi, S., & AbouRizk, S. (1993). Productivity in construction. Ottawa, Canada: National Research Council.Search in Google Scholar

Durdyev, S., Ismail, S., & Kandymov, N. (2018). Structural Equation Model of the Factors Affecting Construction Labour Productivity. Journal of Construction Engineering and Management, 144(4), 04018007. https://doi.org/10.1061/(ASCE)CO.1943-7862.000145210.1061/(ASCE)CO.1943-7862.0001452Search in Google Scholar

Durdyev, S., & Mbachu, J. (2011). On-Site Labour Productivity of New Zealand Construction Industry: Key Constraints and Improvement Measures. CEB, 11(3), 18–33. https://doi.org/10.5130/AJCEB.v11i3.212010.5130/AJCEB.v11i3.2120Search in Google Scholar

Franklin, J. (2017). Behavioural factors in human resource planning. Retrieved from https://bizfluent.com/list-6557409-behavioral-factors-human-resource-planning.htmlSearch in Google Scholar

Gratton, L. (2000). Living strategy: putting people at the heart of corporate purpose. London, United Kingdom: Pearson Education Limited.Search in Google Scholar

Guo, B. H., Yiu, T. W., & González, V. A. (2015). Identifying Behaviour Patterns of Construction Safety Using System Archetypes. Accident Analysis Prevention, 80, 125–141. https://doi.org/10.1016/j.aap.2015.04.00810.1016/j.aap.2015.04.008Search in Google Scholar

Hamza, M., Shahid, S., Bin Hainin, M. R., & Nashwan, M. S. (2019). Construction Labour Productivity: Review of Factors Identified. International Journal of Construction Management, 19, 1–13. https://doi.org/10.1080/15623599.2019.162750310.1080/15623599.2019.1627503Search in Google Scholar

Hanna, A., Chang, C-K., Lackney, J., & Sullivan, K. (2007). Impact of Overmanning on Mechanical and Sheet Metal Labour Productivity. Journal of Construction Engineering and Management, 133(1), 22–28. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:1(22)10.1061/(ASCE)0733-9364(2007)133:1(22)Search in Google Scholar

Hawthorne, M. (2017). Objectives of motivation in the workplace. Retrieved from https://bizfluent.com/info-8747634-objectives-motivation-workplace.htmlSearch in Google Scholar

Hewage, K. N., & Ruwanpura, J. Y. (2007). Carpentry Workers Issues and Efficiencies Related to Construction Productivity in Commercial Construction Projects in Alberta. Journal of Civil Engineering Canadian, 33(8), 1075–1089. https://doi.org/10.1139/l06-05010.1139/l06-050Search in Google Scholar

Horner, R. M. W., Talhouni, B. T., & Thomas, H. R. (1989). Preliminary results of major labour productivity monitoring programme. Paper presented at 3rd Yugoslavian Symposium on Construction Management, Cavtat., 18–28.Search in Google Scholar

HSE (2017). Measuring performance. Retrieved from https://www.hse.gov.uk/managing/delivering/check/measuring-performance.htmSearch in Google Scholar

Jarkas, A. M. (2010). The Impacts of Buildability Factors on Formwork Labour Productivity of Columns. Journal of Civil Engineering and Management, 16(4), 471–483. https://doi.org/10.3846/jcem.2010.5310.3846/jcem.2010.53Search in Google Scholar

Jergeas, G. (2009). Improving Construction Productivity on Alberta Oil and Gas Capital Projects. Alberta, Canada: Alberta Finance and Enterprise.Search in Google Scholar

Jha. K. N. (2011). Construction project management: Theory and practice. Delhi, India: Pearson Education India.Search in Google Scholar

Khaled M. EI-G., & Mostafa E. S. (2011). Towards Improving Construction Labour Productivity and Projects Performance. Alexandria Engineering Journal, 50, 321–330. https://doi.org/10.1016/j.aej.2012.02.00110.1016/j.aej.2012.02.001Search in Google Scholar

Lewis, J. L., & Sheppard, S. R. J. (2006). Culture and Communication: Can Landscape Visualization Improve Forest Management Consultation with Indigenous Communities? Landscape and Urban Planning, 77(3), 291–313. https://doi.org/10.1016/j.landurbplan.2005.04.00410.1016/j.landurbplan.2005.04.004Search in Google Scholar

Mazin, R. (2017). Factors that affect employee performance in an organization. Retrieved from https://bizfluent.com/how-7630782-improve-team-work.htmlSearch in Google Scholar

Mctague, B., & Jergeas, G. (2002). Productivity improvements on Alberta major construction projects. Construction Productivity Improvement Report, Project Evaluation Tool. Alberta, Canada: Alberta Economic Development.Search in Google Scholar

Meier, K. S. (2020). How Does Behavior Affect Work Performance? Retrieved from https://work.chron.com/behavior-affect-work-performance-4476.htmlSearch in Google Scholar

Muriel, A., Phillips, D., & Sibieta, L. (2010). Living Standards, Inequality and Poverty: Labour’s Record, IFS 2010 Election Briefing Note 2 (IFS BN89). Retrieved from http://www3.weforum.org/docs/WEF_Forum_IncGrwth.pdfSearch in Google Scholar

Nimo Boakye, A., Akomah, B. B., & Fugar, F. D. K. (2010). Ensuring the Health and Safety of Ghanaian Construction Workers by Decentralised Government Agencies: An Exploratory Study. In S. Laryea, R. Leiringer, & W. Hughes (Eds.). Proceedings of the West Africa Built Environment Research (WABER) Conference (pp. 295–304). Accra, Ghana.Search in Google Scholar

Organization for Economic Cooperation and Development. (2015). The future of productivity. Joint Economics Department and the Directorate for Science, Technology and Innovation Policy Note. Retrieved from http://www.oecd.org/economy/growth/OECD-2015-The-future-of-productivity-book.pdfSearch in Google Scholar

Peles C. (1987). Productivity analysis - A case study: Transaction of the American Association of Cost Engineers, 31st Annual Meeting. Atlanta, USA.Search in Google Scholar

Pinder, C. C. (1998). Work Motivation in Organizational Behaviour. Prentice Hall, Upper Saddle River, NJ, USA, 1998.Search in Google Scholar

Ritz, G. J. (1994). Total Construction Project Management. Boston, United States of America: McGraw-Hill Companies.Search in Google Scholar

Sezer, A. A. (2016). Construction performance measurement: Site managers in refurbishment projects (Doctoral dissertation). Chambers University of Technology, Göteborg, Sweden.Search in Google Scholar

Shehata, M. E., & El-Gohary, K. M. (2011). Towards improving construction labour productivity and projects’ performance. Alexandria Engineering Journal, 50(4), 321–330. https://doi.org/10.1016/j.aej.2012.02.00110.1016/j.aej.2012.02.001Search in Google Scholar

Shivam, N. (2020). Work Measurement: Definition, Objectives and Techniques Retrieved from https://www.economicsdiscussion.net/engineering-economics/work-measurement-definition-objectives-and-techniques/21707Search in Google Scholar

Siebers, P-O., Aickelin, U., Battisti, G., Celia, H., Clegg, C., Fu, X., De Hoyos, R., Iona, A., Petrescu, A., & Peixoto, A. (2008). Enhancing Productivity: The Role of Management Practices. Advanced Institute of Management Research Paper No. 065, 1–29. https://doi.org/10.2139/ssrn.130960510.2139/ssrn.1309605Search in Google Scholar

Soekiman, A., Pribadi, K. S., Soemardi, B. W., & Wirahadikusumah, R.D. (2011). Factors relating to labour productivity affecting the project schedule performance in Indonesia. Procedia Engineering, 14, 865–873. https://doi.org/10.1016/j.proeng.2011.07.11010.1016/j.proeng.2011.07.110Search in Google Scholar

Tongoco, D. C. (2007). Purposive Sampling as a Tool for Informant Selection. Ethnobotany Research & Applications, 5, 147–158. https://doi.org/10.17348/era.5.0.147-15810.17348/era.5.0.147-158Search in Google Scholar

The Institute of Management Services (2020). Work measurement. Retrieved from https://www.ims-productivity.com/page.cfm/content/Work-Measurement/Search in Google Scholar

Tucker, R. L. (1986). Management of Construction Productivity. Journal of Management in Engineering, 2(3), 148–156. https://doi.org/10.1061/(ASCE)9742-597X(1986)2:3(148)10.1061/(ASCE)9742-597X(1986)2:3(148)Search in Google Scholar

Watkins, M., Mukherjee, A., Onder, N., & Mattila, K. (2009). Using Agent-Based Modelling to Study Construction Labor Productivity as an Emergent Property of Individual and Crew Interactions. Journal of Construction Engineering and Management, 135(7), 657–667. https://doi.org/10.1061/(ASCE)CO.1943-7862.000002210.1061/(ASCE)CO.1943-7862.0000022Search in Google Scholar