Login
Register
Reset Password
Publish & Distribute
Publishing Solutions
Distribution Solutions
Subjects
Architecture and Design
Arts
Business and Economics
Chemistry
Classical and Ancient Near Eastern Studies
Computer Sciences
Cultural Studies
Engineering
General Interest
Geosciences
History
Industrial Chemistry
Jewish Studies
Law
Library and Information Science, Book Studies
Life Sciences
Linguistics and Semiotics
Literary Studies
Materials Sciences
Mathematics
Medicine
Music
Pharmacy
Philosophy
Physics
Social Sciences
Sports and Recreation
Theology and Religion
Publications
Journals
Books
Proceedings
Publishers
Blog
Contact
Search
EUR
USD
GBP
English
English
Deutsch
Polski
Español
Français
Italiano
Cart
Home
Journals
Baltic Journal of Real Estate Economics and Construction Management
Volume 6 (2018): Issue 1 (January 2018)
Open Access
Interpretation of Mathematical Model of Measurement of a Public Work Cost after Contractor Selection and before the Start of Contractual Activities
Pavlos Metallinos
Pavlos Metallinos
| Oct 18, 2018
Baltic Journal of Real Estate Economics and Construction Management
Volume 6 (2018): Issue 1 (January 2018)
About this article
Previous Article
Next Article
Abstract
References
Authors
Articles in this Issue
Preview
PDF
Cite
Share
Published Online:
Oct 18, 2018
Page range:
131 - 143
DOI:
https://doi.org/10.2478/bjreecm-2018-0010
Keywords
Cost
,
earned schedule method
,
earned value method
,
public works
© 2018 Pavlos Metallinos, published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.
Pavlos Metallinos
School of Science and Technology, Patra, Greece Hellenic Open University,
Patra, Greece