Fig. 1

Definition of collaboration levels.
Definition of collaboration levels.

Fig. 2

Framework for collaboration in construction supply chain.
Framework for collaboration in construction supply chain.

Fig. 3

The membership function of the fuzzy number.
The membership function of the fuzzy number.

Fig. 4

Prioritization of main factors affecting the use of collaboration (a) and prioritizing the sub-criteria of managerial factor (b).
Prioritization of main factors affecting the use of collaboration (a) and prioritizing the sub-criteria of managerial factor (b).

Fig. 5

Prioritizing the sub-criteria of structural factor (a) and prioritizing the sub-criteria of financial factor (b).
Prioritizing the sub-criteria of structural factor (a) and prioritizing the sub-criteria of financial factor (b).

Fig. 6

Prioritization of the exceptive positive results from the use of collaboration.
Prioritization of the exceptive positive results from the use of collaboration.

Positive resultsPositive results
Higher QualityLower Cost
Lower TimeHigher Quality
Lower CostLower Time

The significant patterns of the sub-criteria of organizational factor and financial factor.

A2B1A2B2A2B3AlphaA3B1A3B2A3B3Alpha
0.3430.3440.3110.10.3010.3210.3770.1
0.3430.3460.3100.30.2980.3220.3790.2
0.3420.3480.3080.50.2960.3220.3800.3
0.3420.3490.3080.70.2950.3220.3820.4
0.3410.3520.3060.90.2940.3210.3830.5
0.3410.3530.30510.2930.3210.3850.6

The significant patterns of the main factors and the sub-criteria of managerial factor.

A1A2A3AlphaA1B1A1B2A1B3Alpha
0.4890.2400.2700.10.4770.2550.2670.1
0.4920.2370.2690.30.4850.2520.2620.3
0.4940.2360.2690.50.4910.2500.2580.5
0.4950.2350.2680.70.4950.2350.2680.7
0.4960.2360.2670.90.4980.2480.2520.9
0.4960.2360.26610.4990.2480.2511

Specific symbol of criteria and sub-criteria.

SymbolFactorSymbolFactor
A1ManagerialA1B1Manager's commitment to the goals
A1B2Manager's trust to share the information system
A1B3Manager's justice and impartiality of communications with other members of the supply chain
A2StructuralA2B1Existence of the culture of collaboration within the organization
A2B2Knowledge, information and experience of employees
A2B3Correct definition of the roles and responsibilities in the organization chart
A3FinancialA3B1Spending money for use of updated information sharing system
A3B2Use of financial resources to control and update project information
A3B3Use of financial resources for training members (how to collaborate with each other)

Linguistic scale for importance (Fuzzy AHP).

Triangular fuzzy scaleLinguistic scale for importance
uml
311Equally preferred
531Moderately preferred
753Strongly preferred
975Very strongly preferred
1197Extremely preferred
eISSN:
1847-6228
Language:
English
Publication timeframe:
Volume Open
Journal Subjects:
Engineering, Introductions and Overviews, other