[Arthur, P.S., & and Hunt, S.P. (2005). ISASMELT™ - 25 Years of Continuous Evolution. In The John Floyd International Symposium on Sustainable Developments in Metals Processing, Melbourne, 3 - 6 July 2005 (pp. 73-94).]Search in Google Scholar
[Mount Isa Mines (2015). URL: http://www.mountisamines.com.au/EN/Pages/default.aspx ]Search in Google Scholar
[Pegden, C.D., Shandan, R.E., & Sadowski, R.P. (1990). Introduction to simulation using SIMAN. New York: McGraw-Hill.]Search in Google Scholar
[Player, R. (1998). Renewal of the Csmelter at Mount Isa. In Proceedings of AusIMM ‘98 - The Mining Cycle, Mount Isa, Queensland, 19-23 April 1998 (pp. 391-394).]Search in Google Scholar
[Sargent, R.G. (1984). A Tutorial on Verification and Validation of Simulation Models. In Winter Simulation Conference Proceedings, Dallas, Texas, USA, Nov. 28-30 (pp. 114-121). Piscataway, NJ, USA: IEEE Press.]Search in Google Scholar
[System Modelling Corporation (1993). SIMAN V Reference Guide. Sewickley, PA.]Search in Google Scholar
[Welgama, P., Mills, R.G., Aboura, K., Struthers, A., & Tucker, D. (1995). Evaluation of Options to Improve Copper Production. In Sixth International Conference on Manufacturing Engineering, Melbourne, Australia, Nov. 29 - Dec. 1 1995 (pp. 219-223). Barton, ACT: Institution of Engineers, Australia.]Search in Google Scholar
[Welgama, P., Mills, R.G., Aboura, K., Struthers, A., & Tucker, D. (1996a). Evaluating Options to Increase Production of a Copper Smelter Aisle: A Simulation Approach. Simulation, 67(4), pp. 247-267, http://dx.doi.org/10.1177/00375497960670040410.1177/003754979606700404]Search in Google Scholar
[Welgama, P., Mills, R.G., Aboura, K., Struthers, A., & Tucker, D. (1996b). Modeling Downtimes in a Simulation Model for Copper Production. In International Conference of Maintenance Societies, Melbourne, Australia, May 22-23 1996 (pp. 1-6).]Search in Google Scholar
[Wikipedia (2015). Mount Isa Mines. URL: http://en.wikipedia.org/wiki/Mount_Isa_Mines]Search in Google Scholar