Open Access

Simulation for Jewelry Production Process Improvement Using Line Balancing: A Case Study


Cite

[1] M.E. Salveson. “The Assembly Line Balancing Problem.” The Journal of Industrial Engineering, vol.6, pp. 18-25, 1995.Search in Google Scholar

[2] A.L. Gutjahr and G.L. Nemhauser. “An Algorithm for the Line Balancing Problem.” Management Science. vol. 11, pp. 308-315, 1964.10.1287/mnsc.11.2.308Search in Google Scholar

[3] T.R. Hoffmann. “Assembly Line Balancing with a Precedence Matrix,” Management Science, vol. 9, pp. 551-562, 1963.10.1287/mnsc.9.4.551Search in Google Scholar

[4] A.L. Arcus. “COMSOAL: A Computer Method of Sequencing Operations for Assembly Lines,” International Journal of Production Research, vol. 4, pp. 259-277, 1965.10.1080/00207546508919982Search in Google Scholar

[5] A. Raouf and E.A. El-Sayed. “A New Heuristic Approach to Assembly Line Balancing,” Computer & Industrial Engineering, vol. 4, pp. 223-234, 1980.10.1016/0360-8352(80)90023-6Search in Google Scholar

[6] I. Baybars. “An Efficient Heuristic Method for the Simple Assembly Line Balancing Problem,” International Journal of Production Research, vol. 24, pp. 149-166, 1984.10.1080/00207548608919719Search in Google Scholar

[7] M. Jim and S.D. Wu. “A New Heuristic Method for Mixed Model Assembly Line Balancing Problem,” Computer & Industrial Engineering, vol. 44, pp. 159-169, 2003.10.1016/S0360-8352(02)00190-0Search in Google Scholar

[8] F.B. Talbol and J.H. Patterson. “An Integer Programming Algorithm with Network Cuts for Solving the Assembly Line Balancing Problem,” Management Science, vol. 30, pp. 85-99, 1984.10.1287/mnsc.30.1.85Search in Google Scholar

[9] A. Scholl and C. Becker, C. “State-of-the-art Exact and Heuristic Solution Procedures for Simple Assembly Line Balancing,” European Journal of Operational Research, vol. 168, pp. 666-693, 2006.10.1016/j.ejor.2004.07.022Search in Google Scholar

[10] P. Chutima and P. Olanviwatchai.“Mixed-Model U-Shaped Assembly Line Balancing Problems with Coincidence Memetic Algorithm,” Journal of Software Engineering and Applications, vol. 3, pp. 347-363, 2010.10.4236/jsea.2010.34040Search in Google Scholar

[11] S. Avikal and H.C. Yadav. “A Heuristic Approach for U-Shaped Assembly Line Balancing to Improve Labor Productivity,” Computer & Industrial Engineering, vol. 64, pp. 895-902, 2013.10.1016/j.cie.2013.01.001Search in Google Scholar

[12] P. Sivasankaran and P.M. Shahabudeen. “Design and Comparison of Genetic Algorithms for Mixed-Model Assembly Line Balancing Problem with Original Task Times of Models,” American Journal of Industrial and Business Management, vol. 6, pp. 674-696, 2016.10.4236/ajibm.2016.65063Search in Google Scholar

[13] H. Zupan and N. Herakovic. (2015). “Production Line Balancing with Discrete Even Simulation: A Case Study,” IFAC-Paper Online, 45(3), pp. 2305-2311. Available:https://www.sciencedirect.com/science/article/pii/S2405896315006709.Search in Google Scholar

[14] A. Maria. “Introduction to modeling and simulation,” Proceedings of the 1997 Winter Simulation Conference (WSC '97), 1997, pp. 7-13.10.1145/268437.268440Search in Google Scholar

[15] B. Kadar, A. Pfeiffer, and L. Monostori. “Discrete Event Simulation for Supporting Production Planning and Scheduling Decisions in Digital Factories,” Proceedings of the 37th CIRP International Seminar on Manufacturing Systems, 2004, pp. 441-448.Search in Google Scholar

[16] I. Stankovic, Z. Car, and B. Barisic. “Comparative Simulation of the Heavy Machine Production System,” Engineering Review, vol. 31, pp. 11-23, 2011.Search in Google Scholar

[17] Y. L. Ho. “Staged improvement of delivery-oriented production,” International Journal of Simulation Modelling, vol. 14, pp. 17-27, 2011.Search in Google Scholar

[18] Y. W. Ng, J.C.R. Jie, and S. Kamaruddin. “Analysis of Shop Floor Performance through Discrete Event Simulation: A Case Study,” Journal of Industrial Engineering, vol. 2014, pp. 10-18, 2014.Search in Google Scholar

[19] M. Pröpstera, L. Märzb, G. Reinharta, and C. Intra. “Validation of Line Balancing by Simulation of Workforce Flexibility, ”9th CIRP Conference on Intelligent Computation in Manufacturing Engineering, Procedia CIRP 33,2015, pp. 93-98.10.1016/j.procir.2015.06.018Search in Google Scholar

[20] G. Sargent. “Verification and Validation of Simulation Models,” Winter Simulation Conference, USA, 2009, pp. 108-116.10.1109/WSC.2009.5429327Search in Google Scholar

[21] H. Güçdemir, and H. Selim. “Customer Centric Production Planning and Control in Job Shops: A Simulation Optimization Approach,” Journal of Manufacturing Systems, vol.43, pp. 100-116, 2017.10.1016/j.jmsy.2017.02.004Search in Google Scholar

[22] S. Lang, T. Reggelin, and T. Wunder. “Mesoscopic Simulation Models for Logistics Planning Tasks in the Automotive Industry,” Procedia Engineering, vol.178, pp. 298-307, 2017.10.1016/j.proeng.2017.01.118Search in Google Scholar