Open Access

Computational Intelligence for Estimating Cost of New Product Development

   | Mar 26, 2016

Cite

[1] Cooper R., Edgett S., 2008. Maximizing productivity in product innovation. Research Technology Management, 51(2), pp.47-58.10.1080/08956308.2008.11657495Search in Google Scholar

[2] Chan S.L., Ip W.H., 2011. A dynamic decision support system to predict the value of customer for new product development. Decision Support Systems, Vol. 52, pp.178-188.10.1016/j.dss.2011.07.002Open DOISearch in Google Scholar

[3] Spalek S., 2013. Improving industrial engineering performance through a successful project management office. Engineering Economics, 24(2), pp.88-98.10.5755/j01.ee.24.2.3087Open DOISearch in Google Scholar

[4] Relich M., Bzdyra K., 2014. Estimating new product success with the use of intelligent systems. Foundations of Management, 6(2), pp.7-20.10.1515/fman-2015-0007Search in Google Scholar

[5] Trott P., 2005. Innovation Management and New Product Development. Essex: Prentice Hall.Search in Google Scholar

[6] Relich M., Bzdyra K., 2015. Knowledge discovery in enterprise databases for forecasting new product success. Intelligent Data Engineering and Automated Learning (ed. K. Jackowski et al.). Lecture Notes in Computer Science, Vol. 9375, Springer, pp.121-129.Search in Google Scholar

[7] Dieter G.E., 2000. Engineering Design: A Material and Processing Approach. Boston: McGraw-Hill.Search in Google Scholar

[8] Nepal B., Monplaisir L., Singh N., 2005. Integrated fuzzy logic-based model for product modularization during concept development phase. International Journal of Production Economics, Vol. 96, pp.157-174.10.1016/j.ijpe.2004.03.010Open DOISearch in Google Scholar

[9] Ulrich K.T., Eppinger S.D., 2011. Product Design and Development. Boston: McGraw-Hill.Search in Google Scholar

[10] Relich M., 2015. Identifying relationships between eco-innovation and product success. Technology Management for Sustainable Production and Logistics (ed. P. Golinska, A. Kawa). Berlin Heidelberg: Springer, pp.173-192.10.1007/978-3-642-33935-6_9Search in Google Scholar

[11] Anderson D.M., 2001. Design for Manufacturability: Optimizing Cost, Quality and Time-to-Market. Cambria: CIM Press.Search in Google Scholar

[12] Sharma A., 2005. Collaborative product innovation: integrating elements of CPI via PLM framework. Computer-Aided Design, Vol. 37, pp.1425-1434.10.1016/j.cad.2005.02.012Open DOISearch in Google Scholar

[13] Danesi F., Gardan N., Gardan Y. Reimeringer M., 2008. P4LM: A methodology for product lifecycle management. Computers in Industry, Vol. 59, pp.304-317.10.1016/j.compind.2007.06.013Open DOISearch in Google Scholar

[14] Alemanni M., Destefanis F., Vezzetti E., 2011. Model-based definition design in the product lifecycle management scenario. International Journal of Advanced Manufacturing Technology, Vol. 52, pp.1-14.10.1007/s00170-010-2699-yOpen DOISearch in Google Scholar

[15] Gola A., Relich M., Kłosowski G., Świć A., 2015. Mathematical models for manufacturing systems capacity planning and expansion – an overview. Applied Mechanics and Materials, Vol. 791, pp.125-131.10.4028/www.scientific.net/AMM.791.125Search in Google Scholar

[16] Ernst H., 2002. Success factors of new product development: a review of the empirical literature. International Journal of Management Reviews, Vol. 4, pp.1-40.10.1111/1468-2370.00075Open DOISearch in Google Scholar

[17] Kormancova G., 2012. Project success and failure. Theory of Management 6: The Selected Problems for the Development Support of Management Knowledge Base, Zilina, pp.117-119.Search in Google Scholar

[18] Bhuiyan N., 2011. A framework for successful new product development. Journal of Industrial Engineering and Management, Vol. 4, pp.746-770.10.3926/jiem.334Open DOISearch in Google Scholar

[19] McCarthy I.P., Tsinopoulos C., Allen P., Rose-Anderssen C., 2006. New product development as a complex adaptive system of decisions. Journal of Product Innovation Management, Vol. 23, pp.437-456.10.1111/j.1540-5885.2006.00215.xSearch in Google Scholar

[20] Kahraman C., Buyukozkan G., Ates N.Y., 2007. A two phase multi-attribute decision-making approach for new product introduction. Information Sciences, Vol. 177, pp.1567-1582.10.1016/j.ins.2006.09.008Search in Google Scholar

[21] Sun H., Wing W., 2005. Critical success factors for new product development in the Hong Kong toy industry. Technovation, Vol. 25, pp.293-303.10.1016/S0166-4972(03)00097-XOpen DOISearch in Google Scholar

[22] Relich M., 2016. A knowledge-based system for new product portfolio selection. New Frontiers in Information and Production Systems Modelling and Analysis (ed. P. Rozewski et al.). Intelligent Systems Reference Library, Vol. 98, Springer, pp.169-187.10.1007/978-3-319-23338-3_8Search in Google Scholar

[23] Cooper R., Slagmulder R., 1999. Develop profitable new products with target costing. Sloan Management Review, Vol. 40, pp.23-33.Search in Google Scholar

[24] Ben-Arieh D., Qian L., 2003. Activity-based cost management for design and development stage. International Journal of Production Economics, Vol. 83, pp.169-183.10.1016/S0925-5273(02)00323-7Search in Google Scholar

[25] Niazi A., Dai J., Balabani S., Seneviratne L., 2005. Product cost estimation: technique classification and methodology review. Journal of Manufacturing Science and Engineering, Vol. 128, pp.563-575.10.1115/1.2137750Search in Google Scholar

[26] Weustink I.F., ten Brinke E., Streppel A.H., Kals H.J., 2000. A generic framework for cost estimation and cost control in product design. Journal of Materials Processing Technology, Vol. 103, pp.141-148.10.1016/S0924-0136(00)00405-2Search in Google Scholar

[27] Foussier P., 2006. From Product Description to Cost: A Practical Approach. London: Springer.Search in Google Scholar

[28] Mislick G., Nussbaum D., 2015. Cost Estimation: Methods and Tools. New Jersay: Wiley & Sons.10.1002/9781118802342Search in Google Scholar

[29] Kusiak A., 2000. Computational Intelligence in Design and Manufacturing. New York: John Wiley & Sons.Search in Google Scholar

[30] Medsker L., 1995. Hybrid Intelligent Systems. New York: Springer Science.10.1007/978-1-4615-2353-6Search in Google Scholar

[31] Cavalieri S., Maccarrone P., Pinto R., 2004. Parametric vs. neural network models for the estimation of production costs: a case study in the automotive industry. International Journal of Production Economics, Vol. 91, pp.165-177.10.1016/j.ijpe.2003.08.005Search in Google Scholar

[32] Relich M., 2010. Assessment of task duration in investment projects. Management, 14(2), pp.136-147.Search in Google Scholar

[33] Lolas S., Olatunbosun O., 2008. Prediction of vehicle reliability performance using artificial neural networks. Expert Systems with Applications, Vol. 34, pp.2360-2369.10.1016/j.eswa.2007.03.014Open DOISearch in Google Scholar

[34] Seo K., Park J., Jang D., Wallace D., 2002. Approximate estimation of the product life cycle cost using artificial neural networks in conceptual design. International Journal of Advanced Manufacturing Technology, Vol. 19, pp.461-471.10.1007/s001700200049Open DOISearch in Google Scholar

[35] Aydin R., Kwong C., Ji P., Law H., 2014. Market demand estimation for new product development by using fuzzy modelling and discrete choice analysis. Neurocomputing, Vol. 142, 2014, pp.136-146.10.1016/j.neucom.2014.01.051Search in Google Scholar

[36] Yadav O., Singh N., Chinnam R., Goel P., 2003. A fuzzy logic based approach to reliability improvement estimation during product development. Reliability Engineering & System Safety, Vol. 80, pp.63-74.10.1016/S0951-8320(02)00268-5Search in Google Scholar

[37] Carrera D., Mayorga R., 2008. Supply chain management: a modular fuzzy inference system approach in supplier selection for new product development. Journal of Intelligent Manufacturing, Vol. 19, pp.1-12.10.1007/s10845-007-0041-9Open DOISearch in Google Scholar

[38] Doskocil R., 2016. An evaluation of total project risk based on fuzzy logic. Business: Theory and Practice, 17(1), pp.23-31.10.3846/btp.2016.534Search in Google Scholar

[39] Doskocil R., 2015. Fuzzy logic: an instrument for the evaluation of project status. Revista de Metodos Cuantitativos para la Economia y la Empresa, Vol. 19, pp.5-23.Search in Google Scholar

[40] Relich M., 2013. Fuzzy project scheduling using constraint programming. Applied Computer Science, 9(1), pp.3-16.Search in Google Scholar

[41] Chang D., Chen C., Lee K., 2014. A crowd-sourcing development approach based on a neuro-fuzzy network for creating innovative product concepts. Neurocomputing, Vol. 142, pp.60-72.10.1016/j.neucom.2014.03.044Search in Google Scholar

[42] Kwong C., Wong T., Chan K., 2009. A methodology of generating customer satisfaction models for new product development using a neuro-fuzzy approach. Expert Systems with Applications, Vol. 36, pp.11262-11270.10.1016/j.eswa.2009.02.094Open DOISearch in Google Scholar

[43] Relich M., 2015. A computational intelligence approach to predicting new product success. Proceedings of the 11th International Conference on Strategic Management and its Support by Information Systems, Uherske Hradiste, pp.142-150.Search in Google Scholar

[44] Rossi F., van Beek P., Walsh T., 2006. Handbook of Constraint Programming. Elsevier.Search in Google Scholar

[45] Bocewicz G., Nielsen I., Banaszak Z., 2014. Iterative multimodal processes scheduling. Annual Reviews in Control, 38(1), pp.113-132.10.1016/j.arcontrol.2014.03.011Open DOISearch in Google Scholar

[46] Relich M., Swic A., Gola A., 2015. A knowledge-based approach to product concept screening. Distributed Computing & Artificial Intelligence (ed. S. Omatu et al.). Advances in Intelligent Systems and Computing, Vol. 373, Springer, pp.341-348.10.1007/978-3-319-19638-1_39Search in Google Scholar

[47] Relich M., Banaszak Z., 2011. Reference model of project prototyping problem. Foundations of Management, 3(1), pp.33-46.10.2478/v10238-012-0034-7Search in Google Scholar

[48] Han J., Kamber M., 2006. Data Mining. Concepts and Techniques. San Francisco: Morgan Kaufmann Publishers.Search in Google Scholar

[49] Cios K.J., Pedrycz W., Swiniarski R.W., Kurgan L.A., 2007. Data Mining: A Knowledge Discovery Approach. New York: Springer.Search in Google Scholar

[50] Relich M., Pawlewski P., 2015. A multi-agent system for selecting portfolio of new product development project. PAAMS 2015 Workshops (ed. J. Bajo et al.). Communications in Computer and Information Science, Vol. 524, Springer, pp.102-114.10.1007/978-3-319-19033-4_9Search in Google Scholar

[51] Fayyad U., Piatetsky-Shapiro G., Smith P., 1996. From data mining to knowledge discovery in databases. American Association for Artificial Intelligence, Fall, pp.37-54.10.1007/3-540-61286-6_131Search in Google Scholar

[52] Relich M., 2013. Project parameter estimation on the basis of an ERP database. Foundations of Management, 5(2), pp.49-58.10.2478/fman-2014-0012Search in Google Scholar

[53] Van Roy P., Haridi S., 2004. Concepts, Techniques and Models of Computer Programming. Massachusetts Institute of Technology.Search in Google Scholar

[54] Baptiste P., Le Pape C., Nuijten W., 2001. Constraint-Based Scheduling: Applying Constraint Programming to Scheduling Problems. Norwell, Massachusetts: Kluwer Academic Publishers.10.1007/978-1-4615-1479-4Search in Google Scholar

[55] Relich M., 2011. CP-based decision support for scheduling. Applied Computer Science, 7(1), pp.7-17.Search in Google Scholar

[56] Banaszak Z., Zaremba M., Muszyński W., 2009. Constraint programming for project-driven manufacturing. International Journal of Production Economics, Vol. 120, pp. 463-475.10.1016/j.ijpe.2008.12.016Open DOISearch in Google Scholar

[57] Relich M., 2014. A constraint programming approach for scheduling in a multi-project environment. International Journal of Advanced Computer Science and Information Technology, 3(2), pp.156-171.Search in Google Scholar