Review of Various Delay Causing Factors and Their Resolution by Application of Lean Principles in India


Cite

Alaghbari, W., Razali A. Kadir, M., Salim, A., & Ernawati. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192-206. https://doi.org/10.1108/0969998071073130810.1108/09699980710731308Open DOISearch in Google Scholar

Al-Khalil, M. I., & Al-Ghafly, M. A. (1999). Important causes of delay in public utility projects in Saudi Arabia. Construction Management and Economics, 17(5), 647-655. https://doi.org/10.1080/01446199937125910.1080/014461999371259Open DOISearch in Google Scholar

Al-Momani, A. H. (2000). Construction delay: a quantitative analysis. International Journal of Project Management, 18(1), 51-59. https://doi.org/10.1016/s0263-7863(98)00060-x10.1016/s0263-7863(98)00060-xOpen DOISearch in Google Scholar

Arditi, D., Akan, G. T., & Gurdamar, S. (1985). Reasons for delays in public projects in Turkey. Construction Management and Economics, 3(2), 171-181. https://doi.org/10.1080/0144619850000001310.1080/01446198500000013Open DOISearch in Google Scholar

Arditi, D., & Robinson, M. A. (1995). Concurrent Delays in Construction Litigation. Cost Engineering Journal, AACE International, 37(7), 20-31.Search in Google Scholar

Asim, M., Deep, S., & Dr. Aqeel, S. A. (2017). Time Impact Study of Real Estate Sector Construction Projects Post Application of Lean Principles for Delay Resolutions. International Journal of Civil Engineering and Technology, 8(2), 89-99.Search in Google Scholar

Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-357. https://doi.org/10.1016/j.ijproman.2005.11.01010.1016/j.ijproman.2005.11.010Open DOISearch in Google Scholar

Assaf, S. A., Al-Khalil, M., & Al-Hazmi, M. (1995). Causes of Delay in Large Building Construction Projects. Journal of Management in Engineering, 11(2), 45-50. https://doi.org/10.1061/(asce)0742-597x(1995)11:2(45)10.1061/(asce)0742-597x(1995)11:2(45Open DOISearch in Google Scholar

Baldwin, J. R., Mathei, J. M., Rothbart, H., & Harris, R. B. (1971). Causes of Delay in the Construction Industry. Journal of Construction Division, 97(2), 177-187.10.1061/JCCEAZ.0000305Search in Google Scholar

Barker, R., Childerhouse, P., Naim, M., Masat, J., & Wilson, D. (2004). Potential of Total Cycle Time Compression in Construction: Focus on Program Development and Design. Journal of Construction Engineering and Management, 130(2), 177-187. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(177)10.1061/(ASCE)0733-9364(2004)130:2(177Open DOISearch in Google Scholar

Chang, A. S., Shen, F.-Y., & Ibbs, W. (2010). Design and construction coordination problems and planning for design-build project new users. Canadian Journal of Civil Engineering, 37(12), 1525-1534. https://doi.org/10.1139/l10-09010.1139/L10-090Open DOISearch in Google Scholar

Deep, S., Singh, D., & Ahmad, S. A. (2017). A Review of Contract Awards to Lowest Bidder in Indian Construction Projects via Case Based Approach. Open Journal of Business and Management, 05(01), 159-168. https://doi.org/10.4236/ojbm.2017.5101510.4236/ojbm.2017.51015Open DOISearch in Google Scholar

Dlakwa, M. M., & Culpin, M. F. (1990). Reasons for overrun in public sector construction projects in Nigeria. International Journal of Project Management, 8(4), 237-241. https://doi.org/10.1016/0263-7863(90)90032-710.1016/0263-7863(90)90032-7Open DOISearch in Google Scholar

Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479-489. https://doi.org/10.1016/j.ijproman.2011.10.00410.1016/j.ijproman.2011.10.004Open DOISearch in Google Scholar

Etges, B., Saurin, T. A., & Bulhões, I. R. (2012). “Identifying lean construction categories of practices in IGLC proceedings.” Proc., 20th Annual Conf. of the Int. Group for Lean Construction, International Group for Lean Construction (IGLC), Oslo, NorwaySearch in Google Scholar

Gao, S. & Low, S. P. (2014). Lean Construction Management. http://dx.doi.org/10.1007/978-981-287-014-810.1007/978-981-287-014-8Open DOISearch in Google Scholar

Gibson, G. E., Wang, Y.-R., Cho, C.-S., & Pappas, M. P. (2006). What Is Preproject Planning, Anyway? Journal of Management in Engineering, 22(1), 35-42. https://doi.org/10.1061/(asce)0742-597x(2006)22:1(35)10.1061/(asce)0742-597x(2006)22:1(35Open DOISearch in Google Scholar

Gonzalez, V., Alarcon, L. F., & Mundaca, F. (2008). Investigating the relationship between planning reliability and project performance. Production Planning & Control, 19(5), 461-474. https://doi.org/10.1080/0953728080205902310.1080/09537280802059023Open DOISearch in Google Scholar

Hanna, A. S., & Skiffington, M. A. (2010). Effect of Preconstruction Planning Effort on Sheet Metal Project Performance. Journal of Construction Engineering and Management, 136(2), 235-241. https://doi.org/10.1061/(asce)0733-9364(2010)136:2(235)10.1061/(asce)0733-9364(2010)136:2(235Open DOISearch in Google Scholar

Kazaz, A., Ulubeyli, S., & Tuncbilekli, N. A. (2012). Causes of Delays in Construction Projects in Turkey. Journal of Civil Engineering and Management, 18(3), 426-435. https://doi.org/10.3846/13923730.2012.69891310.3846/13923730.2012.698913Open DOISearch in Google Scholar

LCI. (2013). “Lean project design and delivery in action.” Retrieved May 10, 2013, from http://www.leanconstruction.org/.Search in Google Scholar

LCI. (2014). “LCI lean project delivery glossary.” Retrieved May 12, 2014, from http://www.leanconstruction.org.Search in Google Scholar

LCI. (2015). “What is lean design and construction?” Retrieved May 20, 2015, from http://www.leanconstruction.org/.Search in Google Scholar

Lovejoy, V. A. (2004). Claims Schedule Development and Analysis: Collapsed As-built Schedule for Beginners. Cost Engineering Journal, AACE International, 46(1), 27-30.Search in Google Scholar

Lowsley, S., & Linnett, C. (2006). About Time: Delay Analysis in Construction. RICS Business Services Limited.Search in Google Scholar

Iyer, K. C., & Jha, K. N. (2006). Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects. Journal of Construction Engineering and Management, ASCE, 132(8), 871-881.10.1061/(ASCE)0733-9364(2006)132:8(871)Search in Google Scholar

Nesensohn, C., Demir, S. T., & Bryde, D. J. (2012). “Developing a ‘true north’ best practice lean company with navigational compass.” Proc., 20th Annual Conf. of the Int. Group for Lean Construction, International Group for Lean Construction (IGLC), Oslo, Norway.Search in Google Scholar

Thomas, H. R., & Ellis, R. D. (2007). Contractor Prebid Planning Principles. Journal of Construction Engineering and Management, 133(8), 542-552. https://doi.org/10.1061/(asce)0733-9364(2007)133:8(542)10.1061/(ASCE)0733-9364(2007)133:8(542)Search in Google Scholar

Yang, J.-B., & Wei, P.-R. (2010). Causes of Delay in the Planning and Design Phases for Construction Projects. Journal of Architectural Engineering, 16(2), 80-83. https://doi.org/10.1061/(asce)1076-0431(2010)16:2(80)10.1061/(asce)1076-0431(2010)16:2(80Open DOISearch in Google Scholar

Yang, L.-R., Chen, J.-H., & Huang, C.-F. (2012). Requirements Definition and Management Practice to Improve Project Outcomes. Journal of Civil Engineering and Management, 18(1), 114-124. https://doi.org/10.3846/13923730.2012.65734010.3846/13923730.2012.657340Open DOISearch in Google Scholar