LEAN Production issues in the organization of the company - the first stage

Open access

Abstract

Today’s market determinants and most importantly, very dynamically changing customer requirements significantly shortened the product life cycle. This situation reflects in companies by common extension of the assortment offered and personalised serial production. The result of a flexible approach to market changes is the implementation of LEAN concept, which, both in terms of management and production aims to develop efficiency within an organisation, which will then enable quick and dynamic response to changes in the environment. The popularity of LEAN concept (in management and production) among managers comes from its universality and a wide range of instruments used to maximise the use of existing potential. The main assumptions of LEAN concept are aimed at the maximum use of an organisation’s resources, defining the activities necessary to execute an order and identifying the areas generating losses and then minimising them and eventually eliminating. LEAN concept is based on flagship-main tools for identification and modernisation of processes, the difficulty in using them results from the need to recognise and select the most effective ones that meet the expectations of a given organisation. The article presents issues related to the first stage of implementing LEAN concept in a company’s structures, i.e. identification of opportunities and selection of appropriate tools.

If the inline PDF is not rendering correctly, you can download the PDF file here.

  • Aoki M. 2013. Jak działa fabryka Toyoty. Shinsei Consulting Sp. z o.o. Sp. komandytowa. Poznań.

  • Bhasin S. Burcher P. 2006. Lean viewed as a philosophy. Journal of Manufacturing Technology Management 17(1) 56-72 https://doi.org/10.1108/17410380610639506.

  • Bonovia T. Marin J.A. 2006. An empirical study of lean production in the ceramic tile industry in Spain. International Journal of Operations & Production Management 26(5) 505-531.

  • Bortolotti T. Boscari S. Danese P. 2015. Successful lean implementation: Organizational culture and soft lean practices. Int. J. Production Economics 160 182-201.

  • Czerska J. 2014. Podstawowe Narzędzia Lean Manufacturing. LeanQ Team Gdańsk.

  • Haefner B. Kraemer A. Stauss T. Lanza G. 2014. Quality Value Stream Mapping. Procedia CIRP 17 254-259.

  • Hines P. Holwe M. Rich N. 2004. Learning to evolve - A review of contemporary lean thinking. International Journal Of Operations & Production Management 24(9-10) 994-1011 DOI: 10.1108/01443570410558049.

  • Hines P. Holweg M. Rich N. 2004. Learning to Evolve: A Review of Contemporary Lean Thinking. International Journal of Operations & Production Management 24(10) DOI: 10.1108/01443570410558049.

  • Kleszcz D. 2018. Barriers and opportunities in implementation of Lean Manufacturing tools in the ceramic industry. Production Engineering Archives 19 (2018) 48-52 DOI: 0.30657/pea.2018.19.10.

  • Kleszcz D. Ulewicz R. Nowakowska-Grunt J. 2013. The Use of Lean Tools in the Ceramic Industry. In Toyotarity Management of the Production Values. Ankara Turkey 94-111.

  • Klimecka-Tatar D. 2017. Value Stream Mapping as Lean Production tool to improve the production process organization – case study in packaging manufacturing. Production Engineering Archives 17 (2017) 40-44. DOI: 10.30657/pea.2017.17.09.

  • Liker J.K. 2005. The Toyota Way: 14 Management Principles from the World’s Greatest Manufacturer. MT Biznes Warsaw (in Polish).

  • Mann D. 2005. Creating a Lean Culture Tools to Sustain Lean Conversion. Productivity Press New York.

  • Matt D.T. Rauch E. 2013. Implementation of Lean Production in small sized Enterprises Procedia CIRP 12 420-425. DOI: 10.1016/j.procir.2013.09.072.

  • Mielczarek K. Knop K. 2016. Significance of factor describing visual control in the second management principle of Toyota in the automotive supply industry Production Engineering Archives 13 16-19.

  • Nowicka-Skowron M. Ulewicz R. 2016. Problems In the implementation of lean concept in the metal industry companies Brno Czech Republic.

  • Ortiz Ch.O. Park M.R. 2011. Visual Controls. Applying Visual Management to the Factory. Productivity Press New York.

  • Piasecka-Głuszak A. 2014. Lean management w polskich przedsiębior-stwach przy wykorzystaniu wybranych narzędzi rozwiązywania proble-mów – wyniki badań. Research Papers of Wrocław University of Economics 369 88-103.

  • Resta B. Powell D. Gaiardelli P. Dotti S. 2015. Towards a framework for lean operations in product-oriented product service systems. CIRP Journal of Manufacturing Science and Technology 9 12-22. DOI: 10.1016/j.cirpj.2015.01.008.

  • Rose A.N.M. Deros B.M. Rahman M.N.A. 2009. A Review of Lean manufacturing practices in Small and Medium Enterprises. Seminar 3 - AMReG 09 29 Julai 2009 Kajang Selangor Malaysia 1-6.

  • Rother M. Shook J. 2009. Learning to See VSM to Create Value and Eliminate Muda. Lean Enterprise Institute Cambridge.

  • Szatkowski K. 2014. Nowoczesne zarządzanie produkcją ujęcie proceso-we. PWN.

  • Ulewicz R. Kucęba R. 2016. Identification of problems of implementation of Lean concept in the SME sector. Ekonomia i Zarzadzanie 8(1) 19-25. Retrieved 22 Jan. 2018 from doi:10.1515/emj-2016-0002.

  • Urbaniak M. 2010. Kierunki doskonalenia systemów zarzadzania jakością. Uniwersytet Łódzki Łódź.

  • Walentynowicz P. 2016. Zakres zastosowania Lean Management w przed-siębiorstwach produkcyjnych – wyniki badań empirycznych. In: Inno-wacje w zarządzaniu i inżynierii produkcji (red: Knosala R.) Oficyna Wydawnicza Polskiego Towarzystwa Zarządzania Produkcją Opole 407-418.

  • Womack J. Jones D. 2002. Zobaczyć całość. Lean Enterprise Institute Wrocław.

  • Womack J.P. Jones D.T. 2003 Lean Thinking: Banish Waste and Create Wealth In Your Corporation. Simon & Schuster UK. ISBN 9780743231640.

  • Womack J.P. Jones D.T. 1996. Lean Thinking. New York Free Press.

  • Żywiołek J. 2016. The application of value stream mapping method for identifying basic drawbacks and reducing duration of information process in a company. Production Engineering Archives 11(2) 36-39.

Search
Journal information
Metrics
All Time Past Year Past 30 Days
Abstract Views 0 0 0
Full Text Views 109 109 5
PDF Downloads 91 91 5