Open Access

Plastic production machinery – the evaluation of effectiveness


Cite

In this paper TPM and PAMCO coefficients were shortly characterised. On the basis of TPM coefficients its effectiveness was estimated. Thanks to using time and PAMCO coefficients, the utilization of working time machines was researched. Moreover, there a correlation between TPM coefficient and the quality level was examined. A histogram was drawn up in order to illustrate the distribution. The obtained results allowed to evaluate the effectiveness of the machine. The period of research embraced fifty-two weeks (1 year) and the object of the analysis is the injection moulding machine.