Business Management Strategies for Business Development. Organization of the Territory and Planning of Construction Works

Nicolae Postavaru 1 , Gabriela Draghici 2 , Cosmin Filip 3 , Al-Rubaye Mohammed 4  and Sami Mahdi Mohammed 5
  • 1 Technical University of Civil Engineering, Bucharest, Romania
  • 2 Ovidius University of Constanta, Constanta
  • 3 Ovidius University of Constanta, Constanta
  • 4 Technical University of Civil Engineering, Bucharest, Romania
  • 5 Technical University of Civil Engineering, Bucharest, Romania

Abstract

In order for a project to be built with respect to quality, budget compliance and execution time - all required conditions, a professional management of site-level operations is required. The technical complexity, the importance of performing the work on the set deadline, the resource constraints and the substantial costs require the planning, programming and rigorous control of all the works.

If the inline PDF is not rendering correctly, you can download the PDF file here.

  • [1] Cagle, Ronald B. Blueprint for Project Recovery: A Project Management Guide: The Complete Process for Getting Derailed Projects Back on the Track. New York: Amacom, 2002

  • [2] Chandler, A.D., Strategy and Structure, M.I.T. Press, 1962

  • [3] Doval E., Previziunea Economică în Managementul Firmei, Ed. Fundaţiei România De Mâine, Bucureşti, 2007

  • [4] Doval E., Analiza Strategică a Mediului Concurenţial, Editura Fundaţiei România De Mâine, Bucureşti, 2008

  • [5] Grant R.M., Contemporary Strategy Analysis, Blackwell, 1998, p.19

  • [6] Johnson G., Scholes, K., Exploring Corporate Strategy, Forth Edition, Prentice Hall, London, 1997

  • [7] Lemon Consulting, www.lemon-consulting.com

  • [8] Project Management Institute. A Guide to the Project Management Body of Knowledge (Pmbok Guide) - Project Management Institute – Editia A 6-A, 2017

  • [9] Strategy, Curs MBA, Vol. 1-10, The Open University Business School, Uk, 1998

OPEN ACCESS

Journal + Issues

Search