Control panel and indicators for production control in building projects

Open access

Abstract

In general, every project should have indicators that monitor compliance with established goals. In con­struction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper sub­mitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230), presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.

If the inline PDF is not rendering correctly, you can download the PDF file here.

  • Alarcon L. Grillo A. Freire J. & Diethelm S. (2001). Learning from collaborative benchmarking in the construction industry. In: 9th Annual Conference of the International Group for Lean Construction. International Group for Lean Construction Singapore.

  • Ali H. Al-Sulaihi I. & Al-Gahtani K. (2013). Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia. Journal of King Saud University - Engineering Sciences. 25 pp. 125-134.

  • American Institute of Architects - California Council. (2007). Integrated Project Delivery: A Guide. American Institute of Architects California.

  • Atkinson R. (1999). Project management: cost time and quality two best guesses and a phenomenon it’s time to accept other success criteria. International Journal of Project Management 17 pp. 337-342.

  • Ballard G. (2008). The Lean Project Delivery System - An Update. Lean Construction Journal 1 pp. 1-19.

  • Botero L. Álvarez M. & Ramírez C. (2007). Iniciativa colombiana en la definición de indicadores de desempeño como punto de partida de un sistema de referenciación para la construcción. Ambiente Construido 7 pp. 89-102.

  • Building Research Establishment. (2016). BREEAM International New Construction 2016. BRE Global Watford.

  • Cheung S. Suen H. & Cheung K. (2004). PPMS: a web-based construction project performance monitoring system. Automation in construction 13 pp. 361-376.

  • CII Construction Industry Institute. (2011). Productivity Benchmarking Summary Report. Construction Industry Institute Austin.

  • Constructing Excellence. (2013). Client’s Commitments Best Practice Guide. Constructing Client’s Group London.

  • Costa D. Formoso C. Kagioglou M. & Alarcón L. (2004). Performance measurement systems for benchmarking in the construction industry. In: 12th Annual Conference of the International Group for Lean Construction. International Group for Lean Construction Denmark.

  • Da Costa J. Horta I. Guimaraes N. Nóvoa H. & Sousa R. (2006). Sistemas de Indicadores de desempenho e produtividade para a construção civil. In: Encontro nacional sobre qualidade e inovacao na construcao. Laboratório Nacional de Engenharia Civil Lisboa.

  • Egan J. (1998). Rethinking Construction Construction Task Force Report for Department of the Environment Transport and the Regions. Department of Trade and Industry Londres.

  • El-Mashaleh M. Minchin R. & O’Brien W. (2007). Management of construction firm performance using benchmarking. Journal of Management in Engineering 23 pp. 10-17.

  • Green Building Council of Australia. (2017). Green Star - Design & As Built v1.2 Submission Guidelines. Green Building Council of Australia Sydney.

  • Hinze J. Thurman S. & Wehle A. (2013). Leading indicators of construction safety performance. Safety Science 51 pp. 23-28.

  • Jablonowski C. (2011). Identification of HSE leading indicators using regression analysis. In: SPE Americas E&P Health Safety Security and Environmental Conference. Society of Petroleum Engineers Houston.

  • Jastaniah Y. (1997). Performance evaluation and benchmarking of construction industry projects using data envelopment analysis. PhD dissertation Southern Methodist University.

  • Kaplan R. & Norton D. (1992). The balanced scorecard measures that drive performance. Harvard Business Review 70 pp. 71-79.

  • Kim S. Y. & Huynh T. A. (2008). Improving project management performance of large contractors using benchmarking approach. International Journal of Project Management 26 pp. 758-769.

  • KPI Working Group. (2000). KPI Report for the Minister for Construction. Department of the Environment Transport and Regions West Yorkshire.

  • Kunz J. & Fischer M. (2012). Virtual Design and Construction: Themes Case Studies and Implementation Suggestions. Center for Integrated Facility Engineering (CIFE) Stanford University Stanford.

  • National Research Council. (2005). Measuring Performance and Benchmarking Project Management at the Department of Energy. The National Academies Press Washington DC.

  • Navarro Sánchez R. (2010). Creación de un “Balanced ScoreCard” para la dirección integrada de proyectos de construcción. BS dissertation Universidad Politécnica de Cataluña.

  • Orihuela P. & Orihuela J. (2014). Needs values and post-occupancy evaluation of housing project customers: a pragmatic view. Procedia Engineering 85 pp. 412-419.

  • Orihuela P. Pacheco S. Aguilar R. & Orihuela J. (2016). Propuesta de Indicadores de Resultado para Proyectos de Edificación. In: VII Encuentro Latinoamericano de Gestión y Economía en la Construcción. Universidad de Los Andes Bogotá pp. 407-416.

  • Pillai A. Joshi A. & Rao K. (2002). Performance measurement of R&D projects in a multi- project concurrent engineering environment. International Journal of Project Management 20 pp. 165-177.

  • Ramírez R. Alarcón L. & Knights P. (2004). Benchmarking system for evaluating management practices in the construction industry. Journal of Management in Engineering 20 pp. 110-117.

  • Rankin J. Fayek A. Meade G. Haas C. & Manseau A. (2008). Initial metrics and pilot program results for measuring the performance of the Canadian construction industry. Canadian Journal of Civil Engineering 35 pp. 849-907.

  • Roberts M. & Latorre V. (2009). KPIs in the UK’s construction industry: using system dynamics to understand undera­chievement. Revista de la Construcción 8 pp. 69-82.

  • Skibniewski M. & Ghosh S. (2009). Determination of key performance indicators with enterprise resource planning systems in engineering construction firms. Journal of Construction Engineering and Management 135 pp. 965-978.

  • Suk S. Hwang B. Caldas C. Dai J. & Mulva S. (2012). Performance dashboard for a pharmaceutical project benchmarking program. Journal of Construction Engineering and Management 138 pp. 864-876.

  • Toellner J. (2001). Improving safety and health performance: identifying and measuring leading indicators. Professional Safety 46 pp. 42-47.

  • Toor S. & Ogunlana S. (2010). Beyond the “iron triangle”: stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. International Journal of Project Management 28 pp. 228-236.

  • US Green Building Council. (2013). LEED Reference Guide for Building Design and Construction. US Green Building Council Washington D. C..

  • Ward S. Curtis B. & Chapman C. (1991). Objectives and performance in construction projects. Construction Management and Economics 9 pp. 343-353.

  • Wideman R. M. (2004). The Role of the Project Life Cycle (Life Span) in Project Management. AEW Services Vancouver.

  • Wong C. (2004). Contractor performance prediction model for the United Kingdom construction contractor: study of logistic regression approach. Journal of Construction Engineering and Management 130 pp. 691-698.

Search
Journal information
Metrics
All Time Past Year Past 30 Days
Abstract Views 0 0 0
Full Text Views 430 198 8
PDF Downloads 239 116 3