Draft Methodology to Specify the Railway Sections Capacity

Open access

Abstract

This paper presents the individual parameters of the selected railway corridors in the selected country. Particularly, it describes the specific features of selected corridors in this country, summarizes their capacity, as well as proposes the methodology in order to specify the capacity of given railway section. The outcome is represented by the calculation of the appropriate railway section capacity implemented on the particular railway corridor in the selected EU country.

If the inline PDF is not rendering correctly, you can download the PDF file here.

  • [1] European strategies. (2011). White paper 2011 - Roadmap to a Single European Transport Area – Towards a competitive and resource efficient transport system from https://ec.europa.eu/transport/themes/strategies/2011_white_paper_en.

  • [2] Černá L. & Mašek J. (2015). The proposal the methodology of the supply chain management in transport and logistic company. Transport means 2015: proceedings of the 19th international scientific conference Kaunas University of Technology Lithuania. ISSN 1822-296X.

  • [3] Nedeliakova E. Sekulova J. & Nedeliak I. (2014). Risk management in the conditions of railway infrastructure manager. Ekonomicko-manazerske spectrum 8(1) 22-28. ISSN 1337-0839.

  • [4] Sun W. (2016). Study on calculation method for carrying capacity of main railway line based on transportation demand. Journal of the China Railway Society 38(12) 8-13. DOI: 10.3969/j.issn.1001-8360.2016.12.002.

  • [5] Regulation (EU) No. 913/2010 of the European parliament and of the council – concerning a European rail network for competitive freight is one possibility to increase of transport volume in railway transport from http://eurlex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:L:2010:276:0022:0032:en:PDF.

  • [6] Li H. Luan X. Meng L. & Wang Y. (2014). Calculation method for released capacity of existing railway. China Railway Science 35(3) 113-119. DOI: 10.3969/j.issn.1001-4632.2014.03.18.

  • [7] Jiamin Z. & Baoming H. (2011). Analysis and calculation of the scheduled waiting time for the train route. Proceedings - 4th International Conference on Intelligent Computation Technology and Automation ICICTA 2011 1(2011) 54-58.

  • [8] Morlok E.K. & Chang D.J. (2004). Measuring capacity flexibility of a transportation system. Transportation Research Part A: Policy and Practice 38(6) 405-420. DOI: 10.1016/j.tra.2004.03.001.

  • [9] Zhang J.-M. & Han B.-M. (2011). Optimization on the occupation order for trains on tracks of the railway station. Journal of Transportation Systems Engineering and Information Technology 11(3) 100-107.

  • [10] Luo Y.-J. Liu J. Sun X. & Lai Q.-Y. (2015). Regression model for daily passenger volume of high-speed railway line under capacity constraint. Journal of Central South University 22(9) 3666-3676. DOI: 10.1007/s11771-015-2908-9.

  • [11] Zhang H.-B. & Dong B.-T. (2011). Railway timetable saturation based on capacity calculation. Journal of Transportation Systems Engineering and Information Technology 11(4) 129-134.

  • [12] Yaghini M. Sarmadi M. Nikoo N. & Momeni M. (2014). Capacity Consumption Analysis Using Heuristic Solution Method for Under Construction Railway Routes. Networks and Spatial Economics 14(3-4) 317-333. DOI: 10.1007/s11067-014-9223-0.

  • [13] Simon B. & Endemann P. (2016). Corridor Development from a Regional Perspective: The Case of the Frankfurt/Rhine-Main Region. Contributions to Economics 207 81-97. DOI: 10.1007/978-3-319-15708-5-5.

  • [14] Zhang H. Dong B. & Sun Y. (2016). Multi-type empty car dynamic distribution method based on capacity constraints. Journal of Beijing Jiaotong University 40(6) 50-56. DOI: 10.11860/j.issn.1673-0291.2016.06.009.

  • [15] Chen L. Li X. & Liu G. (2013). Analysis of the capacity of the turning-back station in the railway system. ICTE 2013 - Proceedings of the 4th International Conference on Transportation Engineering 2761-2765. DOI: 10.1061/9780784413159.401.

  • [16] Lindfeldt O. (2011). An analysis of double-track railway line capacity. Transportation Planning and Technology 34(4) 301-322. DOI: 10.1080/03081060.2011.577150.

  • [17] Zheng Y.-J. Zhang X.-C. Xu B. & Wang L.-L. (2011). Carrying capacity reliability of railway networks. Journal of Transportation Systems Engineering and Information Technology 11(4) 16-21.

  • [18] Tian R. & Qu M. (2013). Contradiction analysis and freight capacity promotion measures of mixed passenger and freight transportation during the spring festival. ICTE 2013 - Proceedings of the 4th International Conference on Transportation Engineering 1538-1544. DOI: 10.1061/9780784413159.223.

  • [19] Ni S. Zuo D. Lv H. & Yin Y. (2011). The carrying capacity of high speed railway under the mode of high and medium speed mixture trains in one line. ICTE 2011 - Proceedings of the 3rd International Conference on Transportation Engineering 2011 1245-1250. DOI: 10.1061/41184(419)206.

  • [20] Francesco R. Gabriele M. & Stefano R. (2016). Complex railway systems: capacity and utilisation of interconnected networks. European Transport Research Review 8(4) Article number 29. DOI: 10.1007/s12544-016-0216-6.

  • [21] Markovic I. Vucic D. & Muic M. (2004). Railway line “Zagreb-Rijeka”. Promet - Traffic - Traffico 16(2) 83-89.

Search
Journal information
Cited By
Metrics
All Time Past Year Past 30 Days
Abstract Views 0 0 0
Full Text Views 383 204 4
PDF Downloads 187 119 2