Open Access

Aspects on the Influence of Starting the Own Services Consumers of an Energy Group with Unit of 330 MW on the Power Supply


Cite

The elaborated paper had as support a study case on the monitoring of the supply voltage on a busbar system, which feeds the electric motors that enters into the configuration of the technological flow of electricity production of an energy group with a unitary power of 330 MW. In the start-up phase of the energy groups with a unitary power of 330 MW, the consumers of their own services are supplied with electricity by means of general service transformers interconnected to the National Energy System.

eISSN:
2451-3113
ISSN:
1843-6722
Language:
English