Evaluation of Unit Rates Bids of Common Building Items

Olubimbola Oladimeji 1
  • 1 Civil and Maintenance Department, Obafemi Awolowo University Teaching Hospitals Complex, Ile-Ife, Nigeria

Abstract

It is important to assess firms’ financial health in the harsh construction market of developing countries. This study seeks to achieve this by assessing locally owned construction firms’ (LOCOFs) financial performance through evaluating firms’ bill of quantities (BOQ) contract sums and bid unit rates of common building items. Accessible 60 BOQ of the 79 BOQ of building projects awarded to various LOCOFs from 2007 to 2015 by federal universities and federal universities teaching hospitals in Southwest Nigeria were obtained from the institutional archives. Regression analysis of the contract sums and bid unit rates of common building construction items of works such as concrete, sandcrete block, iron, mortar and floor tiles were carried out. LOCOFs’ bid unit rates were compared with published unit rates and Nigeria consumer price index (CPI) within the study period and inferences bothering on firms’ pricing pattern and financial viability of firms based on items of work unit rates were highlighted and discussed. The results showed that 119 out of a total 461 unit rates values representing 25.81% of the LOCOFs bided unit rates were higher than the published unit rates. LOCOFs unit rates trend decreased within 3 to 4 consecutive years while the Nigeria CPI trend increased all through the years considered in the study. This implies that LOCOFs common items of work bids unit rates were not always influenced by the prevailing prices of goods and services in Nigeria. A possible reason for this is the lowest tender selection criteria which influences LOCOFs’ bided unit rates thereby leading to the acclaimed compromise in the quality of construction output and stunted financial performance.

If the inline PDF is not rendering correctly, you can download the PDF file here.

  • Adnan, H., Nawawa, A. H. M., Akhir, S. M. M, Supardi, A., and Chong, H. Y. (2011). Bills of quantities: perspectives of contractors in Malaysia. Australian Journal of Basic and Applied Sciences, 5(11), 863–873.

  • Ahmad, I. (1990). Decision-support system for modeling the bid/no bid decision problem. Journal of Construction Engineering and Management, 116(4), 595-607.

  • Ahmed, M. O.; El-adaway, I. H., Coatney, K. T., and Eid, M. S. (2017). Construction bidding and the winner’s curse: Game theory approach. Journal of Construction engineering and Management, 142(2), 1-9.

  • AIQS (Australian Institute of Quantity Surveyors). (2001), Guaranteed Bills of Quantities. Discussion paper, 25 August 2000, 1-7.

  • Aiswarya, V. S., Beyoola, W., Harsha, V. N., and Preethi M. (2017). Palm oil fuel ash as partial replacement of cement in concrete. International Journal of Engineering Research & Technology, 6(3), 544-546.

  • Ajuwon, O. S., Ikhide, S., and Akotey, J. O. (2017). MSMEs and employment generation in Nigeria. The Journal of Developing Areas, 51(3), 230-249.

  • Akugri, M. S., Bagah, D. A., Wulifan, J. K. (2015). The contributions of small and medium scale enterprises to economic growth: A cross section of Zebilla in the Bawku west district of Northan Ghana. European Journal of Business and Management, 7(9), 262–274.

  • Akintoye, A. and Skitmore, M. (1990). A conceptual model of construction contractors’ pricing strategies. Proceedings of the 6th Annual ARCOM Conference, University of Salford, Association of Researchers in Construction Management, Birmingham, 31-47.

  • Alabi, F. O. (2010). The macroeconomic review of building and construction sector in Nigeria: pre 1980-2006 In: Laryea, S., Leiringer, R., and Hughes, W. (Eds) Procs West Africa Built Environment Research (WABER) Conference, 27-28 July 2010, Accra, Ghana, 605-13.

  • Ameyaw, E. E., Chan, A. P. C., Owusu-Manu, D. G., and Coleman, E. (2015). A fuzzy model for evaluating risk impacts on variability between contract sum and final account in government funded construction projects. Journal of Facility Management, 13(1), 45–69.

  • Ashworth, A. and Hogg, K. (2007). Willis's practice and procedure for the quantity surveyor (12th Ed.). Blackwell Publishing Ltd. Oxford.

  • Bagies, A. and Fortune, C. (2006). Bid/no bid decision modelling for construction projects. Proceedings of the 22nd Annual ARCOM Conference, 4-6 September, Association of Researchers in Construction Management, Birmingham, pp. 511-21.

  • Bala, K., Bello, A., Kolo, B. A., and Bustani, S. A. (2009) Factors inhibiting the growth of local construction firms in Nigeria. In: Dainty, A. (Ed) Procs 25th Annual ARCOM conference, 7-9 September 2009, Nottingham, UK, Association of Researchers in Construction Management, 351-359.

  • Bamiro, O. A. (2012). Tertiary education in Nigeria and the challenge of corporate governance. Speech at the TETFund Year 2012 Strategic Planning Workshop, National Universities Commission, Maitama Abuja.

  • Bennett, L. (2003). The management of construction: A project life cycle approach. Butterworth-Heinemann. Oxford.

  • Birnie, J. and Yates, A. (1991). Cost prediction using decision/risk analysis methodologies. Construction Management and Economics, 9, 171-186.

  • Brett, P. (1997) An illustrated dictionary of building: An illustrated reference guide for practitioners and students. Butterworth-Heinemann. Oxford.

  • Carr, I. and Sandahl, J. (1978). Bidding strategy using multiple regression. Journal of the Construction Division, 104, 15-26.

  • Cartlidge, D. (2009). Quantity surveyor’s pocket book, 1st ed. Elsevier. United Kingdom.

  • Connaughton, J. N. (1994). Value by competition: A guide to the competitive procurement of consultancy services for construction. Construction Industry Research and Information Association. London.

  • Consol. (2008). CONSOL’s Nigerian building price book for builders and developers. Damata printers and publishers. Maryland, Lagos.

  • Consol. (2009). CONSOL’s Nigerian building price book for builders and developers. Damata printers and publishers. Maryland, Lagos.

  • Consol. (2010). CONSOL’s Nigerian building price book for builders and developers. Damata printers and publishers. Maryland, Lagos.

  • Consol. (2011). CONSOL’s Nigerian building price book for builders and developers. Damata printers and publishers. Maryland, Lagos.

  • Consol. (2013). CONSOL’s Nigerian building price book for builders and developers. Damata printers and publishers. Maryland, Lagos.

  • Dulaimi, M. and Shan, H. (2002). The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore. Construction Management and Economics, 20(7), 601-610.

  • Davis, P. R., Love, P. E. D., and Baccarini, D. (2009). Bills of quantities: nemesis or nirvana. Structural Survey, 27 (2), 99-108.

  • Egeman, M. and Mohamed, A. (2007). A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions. Building and Environment, 42(3), 1373-85.

  • Ekanem, S. F, Adewuyi, T. O., and Oladokun, M. G. (2010). An analysis of due process approach in contract administration in Akwa Ibom State. The Professional Builders: Journal of the Nigerian institute of building, 1(1), 1-9.

  • El Nemr, W. and Afifi, A. (2018). An Egyptian owner’s perspective on the “missing bill of quantities items” phenomenon in unit prices contracts. 2018 AACE International Technical Paper. CDR.2803 (1-13).

  • Enshassi, A., Kumaraswamy, M., and Nairab, S. (2010). Analysis of contractors’ bidding decision in the Palestinian construction industry. Journal of Construction Engineering, 25(2), 161-214.

  • Famade, O. A., Omiyale, G. T., Adebola, Y. A. (2015) Towards improved funding of tertiary institutions in Nigeria. Asian Journal of Humanities and Social Sciences, 3 (2), 83-90.

  • Fiakpa, L. (2008). The Cement Barrier Crumbles. This day Sunday, Jan, 20(3), 28-29.

  • Forbes, D., El-Haram, M., Horner, M., Hatton, D., and Evans, A. (2009) Estimating the labour demand for housing construction. In: Dainty, A. (Ed) Procs 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK, Association of Researchers in Construction Management, 655-63.

  • Gransberg, D. D. (2020). Does low bid award facilitate wrongdoing? US implications of Quebec’s Charbonneau commission report. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(1), 1-6.

  • Hai, T. (2009). Factors affecting the contractor’s mark-up size decision in Malaysia. MSc. dissertation, Faculty of Civil Engineering, Universiti Teknologi Malaysia (UTM), Kuala Lumpur.

  • Hinton, P. R. (2005). Statistic explained. 2nd edition Routledge, Taylor and Francis group. East Sussex.

  • Ho, S. P. and Liu, L. Y. (2004). Analytical model for analyzing construction claims and opportunistic bidding. Journal of Construction Engineering and Management. 130(1), 94–104.

  • Hoare, D. and Broome, J. (2001). Bills of quantities versus activity schedules for civil engineering projects, Journal of Construction Procurement, 7(1), 11–26.

  • Hoxley, M. (2000). Are competitive fee tendering and construction professional service quality mutually exclusive, Construction Management and Economics,18(5), 599-605.

  • Jackson, S. (2002). Project cost overrun and risk management. In: Greenwood D, editors. Proceedings of Association of Researchers in Construction, Management 18th Annual ARCOM Conference; Sep 2–4; Newcastle: Northumbria University, UK.

  • Jarkas, M. A. (2013). Primary factors influencing bid mark-up size decisions of general contractors in Kuwait. Journal of Financial Management of Property and Construction, 18(1), 53–75.

  • Jaśkowski, P. and Czarnigowska, A. (2019). Contractor’s bid pricing strategy: a model with correlation among competitors’ prices. De Gruyter Open Engineering, 9, 159–166.

  • Kodikara, G. W., Thorpe, A., and McCaffer, R. (1993). The use of bills of quantities in building contractor organizations, Construction Management and Economics, 11(4), 261–9.

  • Kutner, M. H., Nachtsheim, C. J., Neter, J., and Li, W. (2005). Applied linear statistical models (Vol. 5). McGraw-Hill Irwin. New York.

  • Kwamikorkor, C. M. and Yeboah, M. A. (2013). Examining micro and small enterprises expectations of services rendered by the national board for small scale industries in the cape coast metropolis. International Journal of Innovation Research and Studies, 2(6), 316-332.

  • Laryea, S. and Hughes, W. (2009). How contractors in Ghana include risk in their bid prices. In: Dainty, A. (Ed) Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK, Association of Researchers in Construction Management, 1295-1304.

  • Laryea, S. (2010). Challenges and opportunities facing contractors in Ghana In: Laryea, S., Leiringer, R. and Hughes, W. (Eds) Procs West Africa Built Environment Research (WABER) Conference, 27-28 July 2010, Accra, Ghana, 215-226.

  • Lee, S. B. (2004). A study on optimal lead time selection measure of the construction materials. Journal of Architecture, 4(1), 28-35.

  • Mac-Barango, D. O. (2012) An investigative study of the effect of design decisions on the cost of buildings In: Laryea, S., Agyepong, S. A., Leiringer, R. and Hughes, W. (Eds) Proceedings of 4th West Africa Built Environment Research (WABER) Conference, 24-26 July 2012, Abuja, Nigeria, 819-829.

  • Mehta, P. K., Moteiro, P. J. M., and Ebrary, I. (2014) Concrete microstructure, properties, and materials. McGraw-Hill Publishing, 10.

  • Mensah, G. A. (2018) The degree of accuracy and factors that influence the uncertainty of SME cost estimates, International Journal of Construction Management, 1-14.

  • Mohd Hisham, A. and Azman, W. N. (2008). Bringing back the dead: operationalizing the bills of quantitites. In The International Conference for Project Management (18-20 November 2008), Universiti Malaya.

  • Musa, N. A. and Dada, J. O. (2015). Contributions of contractors selection criteria to bid successfully for public building projects in Southwestern Nigeria “Responsive Built Environment “The proceedings of environmental design and management international conference (9th-12th March, 2015), Ile-Ife, Nigeria.

  • NBS. (2018). Consumer Price Index August 2018. Federal Republic of Nigeria, Abuja.

  • Ng, A. K. W. and Price, A. D. F. (2002). Optimizing the performance of sub-contractors in building construction projects in Hong Kong. In: Greenwood, D (Ed.), 18th Annual ARCOM Conference, 2-4 September 2002, University of Northumbria. Association of Researchers in Construction Management. 2, 811-9.

  • Ogundiran, I. A. and Adedeji, Y. M. D. (2012). Urban housing delivery: expanded polystyrene panels initiative in Abuja, Nigeria In: Laryea, S., Agyepong, S.A., Leiringer, R. and Hughes, W. (Eds) Proceedings of 4th West Africa Built Environment Research (WABER) Conference, 24-26 July 2012, Abuja, Nigeria, 1033-1042.

  • Okekere, P. A. (2007). Concreting in Nigeria and Challenges in the Next Millennium. In a Two-Days workshop at Ahmadu Bello University, Zaria, 12 – 15th March 2007.

  • Oladimeji, O. and Ojo, G. K. (2012). An appraisal of indigenous limited liability construction company in South-Western Nigeria In: Laryea, S., Agyepong, S.A., Leiringer, R. and Hughes,W. (Eds) Procs 4th West Africa Built Environment Research (WABER) Conference, 24-26 July 2012, Abuja, Nigeria, 1095-1109.

  • Oladimeji, O. and Aina O. O. (2018). Financial performance of locally-owned construction firms’ in Southwestern Nigeria. Journal of Financial Management of Property and Construction, 23(1), 112-128.

  • Olatunji, S., Ajibola, K., and Coker, A. (2000). The effects of training on the productivity of construction craftsmen in South Western Nigeria. Retrieved from http://www.irbnet.de/daten/iconda/CIB8941.pdf. on January 20th 2010.

  • Oladapo, A. (2007). An Investigation into construction industry’; In: A.Serpell and S. V. BaraiEds, ITcon.Vol. 12, 261-77.

  • Oo, B., Drew, D., and Lo, H. (2007). Modelling contractors’ mark-up behaviour in different construction markets. Engineering, Construction and Architectural Management, 14(5), 447-462.

  • Opoko, A. P. (2004). Housing the Nigerian urban poor: lessons from other countries. Building Quarterly (17th edition), 3(1), 13-17.

  • Oyamada, H. and Yokoyama, K. (1986). A study of cost estimating relationship between plant cost and economic trend factors. Am. Assn. of Cost Engrs. Trans., M.2.1-M.2.5.

  • Rashid, R. A., Mustapa, M., & Wahid, S. N. A. (2006). Bills of Quantities-Are they still useful and relevant today. In International conference on construction industry.

  • Rooke, J., Seymour, D., and Fellows, R. (2004). Planning for claims: an ethnography of industry culture. Journal of Construction Management and Economics, 22 (6), 655–662.

  • Schaper, M. (2002). Introduction: the essence of ecoentrepreneurship. Greener Management International, 2002 (38), 26–30.

  • Shash, A. and Abdul-Hadi, N. (1993). The effect of contractor size on mark-up size decision in Saudi Arabia. Construction Management and Economics, 11(6) 421-9.

  • Smith, R. (1991). How to uncover program cost risks. America Association of Construction Engineers Trans., F.6.1-F.6.6.

  • Tsado, J. A., Alumbugu, P.O., and Micheal, A. I. (2019). Disparity among multinational and indigenous construction companies. Journal of Engineering, Project, and Production Management, 9(2), 126-131.

  • Tan, Y., Shen, L., Khaled, A., Song, S. (2008). An examination of the factors affecting contractor’s competition strategy: a Hong Kong study. International Journal of Project Organisation Management, 1(1), 4–23.

  • Tan, Y., Shen, L., and Langston, C. (2010). Contractors’ competition strategies in bidding: Hong Kong study. ASCE Journal of Construction Engineering and Management, 136(10), 1069-78.

  • USITC (United States International Trade Commission). (2010). Small and Medium-Sized Enterprises: Overview of Participation in U.S. Exports. USITC Publication 4125. Investigation No. 332-508.

OPEN ACCESS

Journal + Issues

Search