Critical Risks to Construction Cost Estimation

Samuel Ekung 1 , Adeniran Lashinde 2 ,  and Emmanuel Adu 2
  • 1 Department of Quantity Surveying, University of Uyo, PMB 1017, Uyo, Nigeria
  • 2 Department of Quantity Surveying, University of Uyo, PMB 1017, Uyo, Nigeria

Abstract

The prevalence of cost overrun in project delivery suggests an acute dearth of inclusive understanding of the effect of risks on construction cost estimation. In aberrant to the generic assumptions, customary to inquiries in construction risk researches, this paper appraised critical construction estimating risks. The study evaluated the sources, frequency and significance of construction estimating risks, using data from a questionnaire survey of 206 quantity surveyors in Nigeria. The data were analysed using factor analysis, Fussy Set Theory, Terrell Transformation Index (TTI), and Kruskal Wallis H tests. The results showed that estimating risks are correlate seven principal sources, namely: estimating resources, construction knowledge, design information, economic condition, the expertise of estimator, geographic factor, cost data, and project factors (λ, > 0.70 <1.0). Twenty-nine risk factors likewise emerged critical construction estimation risks (TTI, 69-87 > 65 percent) and the top three were low construction knowledge, inaccurate cost information and changes in government regulations (factor scores > 0.60 > 0.50). The awareness and accurate assessment of these risks into project cost estimation would reduce cost overrun. The study, therefore, recommends synergies between projects’ internal/ external environments for proper scoping of these risks into project estimates.

If the inline PDF is not rendering correctly, you can download the PDF file here.

  • Abdulrahman, R. S., Ibrahim, A. D., and Chindo, P. G. (2019). Assessment of risk management maturity of construction organisation in joint ventures projects. Journal of Engineering, Project, and Production Management, 9(1), 20-28.

  • Adafin, J. and Rotimi, J. O. (2016). Determining significant risks in the variability between design-stage elemental cost plan and final tender sum. Journal of Management in Engineering, 32(6), 05016016.

  • Adafin, J. K., Wilkinson, S. J., Rotimi, J. O., and Odeyinka, H. A. (2016). Evaluating the budget reliability of design stage elemental cost plan in building procurement: A New Zealand study. 9 th CIDB Postgraduate Conference, Emerging Trends in Construction Organisational Practices and Project Management Knowledge Area, Cape Town, South Africa.

  • Adedokun O. A., Aje, I. O., and Agboola, O. (2019). Investigation into the Severity of Factors Pre-disposing Projects to Risks in Nigeria. Journal of Building Performance, 10(1), 59-67.

  • Adu, E. and Anjiba, D. I. (2015). Risk factors affecting cost estimate of building projects in Akwa Ibom State Nigeria: Contractors and consultants’ perspective. Proceeding of 2 nd NIQS Research Conference, Federal University of Technology Akure, 693-706.

  • Agyakwa-Baah, A. and Chileshe, N. (2010). Construction professionals’ perception of risk assessment and management practices: Does length of service in construction industry matter. Proceedings 26th Annual ARCOM Conference, Leeds, UK, Association of Researchers in Construction Management, 1219-1228.

  • Aibinu, A. A. and Pasco, T. (2008). The accuracy of pretender building cost estimates in Australia. Construction Management and Economics, 26(12), 1257-1269.

  • Akintoye, A. (2000). Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1), 77-89.

  • Alashwal, A. M. and Al-Shabahi, M. H. (2018). Risk factors in construction projects during unrest period in Yemen. Journal of Construction in Developing Countries, 23(2), 43-62.

  • Al-Hassan, M., Ross, A., and Kirkham, R. (2005). An investigation into current cost estimating practice of specialist trade contractors. 2006 Liverpool Built Environment & Natural Environment Conference. Liverpool John Moores University, Liverpool, London, UK.

  • Alkhadim, M., Gidado, K., and Painting, N. (2018). Perceived crowd safety in large buildings: The confirmatory factor analysis of perceived risk variables, Journal of Engineering, Project and Production Management, 8(1), 22-39.

  • Ameyaw, E. E., Chan, A. P. C., Owusu-Manu, D. G., and Coleman, E. (2015). A fuzzy model for evaluating risk impacts on variability between contract sum and final account in government-funded construction projects. Journal of Facility Management, 13(1), 45-69.

  • Azman, M. A., Abdul-Samad, Z., and Ismail, S. (2013). The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia. International Journal of Project Management, 31(7), 994-1005.

  • Cartlidge, D. (2018). New Aspects of Quantity Surveying, Fourth Edition. London: SponPress.

  • Chalmers, S. (2013). Estimating – getting it right. Paper Presented at Australian Cost Engineering Society, Victorian Chapter

  • Dell’Isola, M. D. (2003). Detailed Cost Estimating, Architect Handbook of Professional Practice. American Institute of Architects. Retrieved from www.aia.org/contractdocs/about on August 22, 2019.

  • Doloi, H. K. (2011). Understanding stakeholders’ perspective of cost estimation in project management. International Journal of Project Management, 29, 622-636.

  • Eaton, D. (2013). Risk and Financial Management Module Lecture Material. Taught Masters Programme, University of Salford, 2012/2013 session.

  • Ekung, S., Adu, E., and Lashinde, A. (2020). System pathogens inhibiting construction project risk management performance: Deliberate ignorance perspective. Journal of Building Performance, 11(1), 68-76.

  • Ekung, S. and Onwusonye, S. (2015). Assessment of Risk Impact on Budgeted Cost Using Multiple Estimating Risk Analysis (MERA). Proceeding of 2nd NIQS Research Conference, Federal University of Technology, Akure, 721-733.

  • Ekung, S. and Onwusonye, S. I. J. (2017). Leveraging cost effective tool for risk allowance estimation in building project delivery. Journal of Environmental Design, 12(2), 11-21.

  • Elfaki, A. O. and Alatawi, S. (2015). Representing the knowledge of public construction project cost estimator by using rule-based method. Journal of Building Construction and Planning Research, 3, 189-195.

  • Enshassi, A., Mohamed, S., and Abdel-Hadi, M. (2013). Factors Affecting the Accuracy of Pre-Tender Cost Estimates in the Gaza Strip. Journal of Construction in Developing Countries, 18(1), 73-94.

  • Enshassi, A., Mohamed, S., and Madi, I. (2005). Factors affecting accuracy of cost estimation of building contracts in the Gaza Strip. Journal of Financial Management of Property and Construction, 10(2), 115-124.

  • Elufioo, H. (2018). Risk factors in cost estimation: building contractor’s experience. American Journal of Civil Engineering and Architecture, 6(3), 123-128.

  • Jaggar, D. and Ross, A. (2003). A survey into the effectiveness of web-based teaching of building design cost management. 19th Annual ARCOM Conference, University of Brighton, Association of Researchers in Construction Management, 633-42.

  • Jimoh, R. A. and Adama, S. M. (2014). Assessment of contingency sum in relation to the total cost of renovation work in public schools in Abuja, Nigeria. International Journal of Management Studies and Research, 2(10), 55-63.

  • Kaplinski, O. (2013). Risk management of construction works by means of utility theory: A case study. 11 th International Conference in Modern Building Materials, Structures and Techniques, MBMST 2013, 533-539.

  • Khemani, K., Walters, N., and Wolff, J. (2010). Improving Construction Cost and Schedule Performance through Risk-based Estimating and Contracting. Nuclear Power International Magazine, December Edition, PennWell Corporation, 1-6.

  • Laryea, S. and Hughes W. (2008). How contractors price risk in bids: Theory and practice. Construction Management and Economics, 26(9), 911-924.

  • Lim, B., Nepal, M. P., Skitmore, M., and Xiong, B. (2016). Drivers of the accuracy of developers’ early stage cost estimates in residential construction. Journal of Financial Management of Property and Construction, 2(1), 4-20.

  • Liu, J., Xie, Q., Xia, B., and Bridge, A. J. (2017). Impact of Design Risk on the Performance of Design-Build Projects. Journal of Construction Engineering Management, 143(6), 04017010.

  • Lmoussaoui, H. and Jamouli, H. (2016). Network Theory-Based Analysis of Construction Project Risks. Engineering Management Research, 5(2), 24-39.

  • Luka, G. T. and Ibrahim, Y. (2015). Identification and assessment of key risk factors affecting public construction projects in Nigeria: Stakeholders perspectives. Proceeding of 2 nd NIQS Research Conference, Federal University of Technology Akure, 706-721.

  • Menches, C. L., Hanna, A. S., Nordheim, E. V., and Russell, J. S. (2008). Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry. Construction Management and Economics, 26(8), 855-869.

  • Miller, R. and Lessard, D. (2001). The Strategic Management of Large Engineering Projects: Shaping Risks Institutions and Governance. Cambridge, MA: MIT Press.

  • Nawaz, A., Nalewaik, A., Waqar, A., Shah, S. A., Sajid, M., and Khalid, M. (2019). An innovative framework for risk management in the construction projects in development countries: Evidence from Pakistan. Risks, 7(24), 1-10.

  • Odediran, S. J. and Windapo, A. O. (2015). Systematic review of factors influencing the cost performance of building projects. Proceeding of the 8 th CIDB Postgraduate Conference, University of Witwatersrand, Johannesburg, South Africa, 10-11.

  • Odeyinka, H., Larkin, K., Weatherup, R., Cunningham, G., McKane, M., and Bogle, G. (2012). Modelling risk impacts on the variability between contract sum and final account. London: Royal Institution of Chartered Surveyors, 1–19.

  • Odusami, K. T. and Onukwube, H. N. (2008). Factors affecting accuracy of pre-tender cost estimate in Nigeria. The Construction and Building Research Conference of the Royal Institution of Chartered Surveyors, COBRA.

  • Ogunsanmi, O. E., Salako, O. A., and Ajayi, O. M. (2011). Risk classification model for design and build projects. Journal of Engineering, Project, and Production Management, 1(1), 46-60.

  • Oladokun, M. G., Oladokun, A. A., and Odesola, I. A. (2011). Accuracy of pre-tender cost estimates of consultant quantity surveyors in Nigeria. Journal International Real Estate Construction Studies, 1(1), 39-52.

  • Oyedele, O. A. (2015). Evaluation of factors affecting construction cost estimation methods in Nigeria. From the Wisdom of the Ages to the Challenges of the Modern World, Sofia, Bulgaria, 17-21.

  • Oyewobi, L. O., Ibrahim, A. D., and Ganiyu, B. O. (2012). Evaluating the impact of risk on contractor’s tender figure in public buildings projects in Northern Nigeria. Journal of Engineering, Project, and Production Management, 2(1), 2-13.

  • Pallant, J. (2016). SPSS Survival Manual: A Step by Step Guide to Data Analysis using IBM SPSS. London: Open University Press.

  • PMI. (2013). A Guide to the Project Management Body of Knowledge. PA, US: Project Management Institute.

  • Rezakhani, P. (2012). Classifying key risk factors in construction projects. Bulletin of the Polytechnic Institute of Iasi-Construction and Architecture Section, 2, 27-38.

  • Saidu, I., Abdulahi, M. M., and Abdulazeez, A. (2014). Assessment of the factors affecting accuracy of pretender cost estimate in Kaduna State, Nigeria. IOSR Journal of Environmental Science, Toxicology and Food Technology, 8(5), 19-27.

  • Serrado, I. P., Santos, J. A., de Oliveira, N. L., and Freitas, A. P. (2019). Identification of importance level of market risks in the construction sector. Journal of Engineering, Project and Production Management, 9(2), 74-84

  • Shan, M., Le, Y., Yiu, K.T, Chan, A.P., and Hu, Y. (2017). Investigating the underlying factors of corruption in the public construction sector: Evidence from China. Science Engineering Ethics, 6, 1643-1666.

  • Toh, T., Ting, C., Ali, K., Aliagha, G., and Munir, O. (2012). Critical cost factors of building construction projects in Malaysia, Procedia-Social and Behavioural Sciences, 57, 360-367.

  • Towner, M. and Baccarini, D. (2007). Risk pricing in construction tenders - how, who, what. Construction Economics Building, 7(2), 12-25.

  • Wright, J. (2014). How to estimate the cost of landscape planting and irrigation for a typical university building. Paper Presented at Australian Cost Engineering Society.

  • Xu, P. P., Chan, E. H. W., and Qian, Q. K. (2012). Key Performance Indicators (KPI) for the Sustainability of Building Efficiency Retrofit (BEER) in hotel buildings in China. Facilities, 30(9/10), 432-448.

  • Xue, H., Zhang, S., Su, Y., and Wu, Z. (2018). Capital cost optimisation for prefabrication: A factor analysis evaluation model. Sustainability, 10(159), 1-22.

  • Yudollahi, M., Mirghasemi, M., Zin, R. M., and Singh, B. (2014). Architect critical challenges as a project manager in construction projects: A case study. Advances in Civil Engineering, 2014, 1-16.

  • Zeng, J., An, M., and Smith, N. J. (2007). Application of a Fuzzy Based Decision Making Methodology to Construction Project Risk Assessment. International Journal of Project Management, 25, 589-600.

OPEN ACCESS

Journal + Issues

Search