Efficient Procedure to Scheduling Construction Projects at the Planning Phase

Open access

Abstract

The construction industry is one of the most important activities that contributes towards the economic growth of any nation. However, the sector has been experiencing problems of cost and time overruns, particularly the problems are significant for the lowest-bid awarded construction projects in the developing countries where inappropriate planning is reported to be one of the major causes. Thus, the paper aims at developing an integrated scheduling approach for construction projects during the planning phase from a project owner’s perspective. The proposed approach integrates cost estimation and schedule in light of practical activity precedence and mathematical cost optimization using different project commencement dates. The study has shown that cost and time optimization model could yield impractical results unless double precedence relations (start-to-start plus finish-to-finish) are imposed between some activities such as trench excavation and pipe laying. It has also demonstrated that the cost and time budgeted during the planning phase would substantially deviate from actual if the planned construction start date slips from the plan, particularly for short period projects. The proposed approach demonstrated in the paper can sufficiently allow planning engineers to develop a comprehensive construction schedule so that the cost and time overruns in the lowest-bid awarded construction projects can be reduced. The paper provides empirical insights into how a robust construction schedule is developed from an owner’s perspective. Cost-time optimization and risk analysis results obtained from manual computation might reduce the reasonable accuracy of the desired cost and schedule integration unless each activity is assigned its own calendar.

If the inline PDF is not rendering correctly, you can download the PDF file here.

  • Chelaka M. Abeyasinghe L. Greenwood D. J. Johansen D. E. (2001). An efficient method for scheduling construction projects with resource constraints. Int. J. Proj. Manag. 19(1) 29–45. https://doi.org/10.1016/S0263-7863(00)00024-7

  • Ayalew T. Dakhli Z. Lafhaj Z. (2016). Assessment on Performance and Challenges of Ethiopian Construction Industry. Journal of Architecture and Civil Engineering 2 1–11.

  • Bacon R. W. Besant-Jones J. E. (1998). Estimating construction costs and schedules: experience with power generation projects in developing countries. Energy Policy26(4) 317–333. https://doi.org/10.1016/S0301-4215(97)00164-X

  • Cajzek R. Klanšek U. (2016). Mixed-integer nonlinear programming based optimal time scheduling of construction projects under nonconvex costs. Technical Gazette23(1) 9–18.

  • Christodoulou S. E. Tezias E. S. Galaras K. A. (2012). Resource-constrained scheduling of construction projects and simulation of the entropy impact on a project’s duration and cost. International Journal of Project Organisation and Management4(4) 322–338. https://doi.org/10.1504/IJPOM.2012.050328

  • Del Pico Wayne J. (2013). Project control: integrating cost and schedule in construction. Hoboken New Jersey: John Wiley & Sons Inc. https://doi.org/10.1002/9781118802717

  • EEA. (2008). The Current State of the Construction Industry. Addis Ababa Ethiopia.

  • PPA. (2010). Federal Public Procurement Directive June 2010 Ethiopia. Retrieved from http://www.ppa.gov.et/index.php?option=com_joomdoc&task=document.download&path=legislation%2Fdirectives%2Fprocurement%2Fpublic-procurement-directive-englishpdf

  • Franck B. Neumann K. Schwindt C. (2001). Truncated branch-and-bound schedule-construction and schedule-improvement procedures for resource-constrained project scheduling. OR–Spektrum 23(3) 297–324. https://doi.org/10.1007/PL00013356

  • Gebrehiwet T. Luo H. (2017). Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study. Procedia Eng. 196 366–74. https://doi.org/10.1016/j.proeng.2017.07.212

  • Heinz S. Beck J. C. (2011). Solving resource allocation/scheduling problems with constraint integer programming. Association for the Advancement of Artificial Intelligence. Retrieved from https://tidel.mie.utoronto.ca/pubs/cip-coplas11.pdf

  • Ibrahim M. Amund B. Nabil D. (2012). Causes of Delay in Road Construction Projects. Journal of Management in Engineering (ASCE)28(3) 300–310.

  • Liu S.-S. Wang C.-J. (2008). Resource-constrained construction project scheduling model for profit maximization considering cash flow. Automation in Construction 17(8) 966–974.

  • Ma G. Wang A. Li N. Gu L. Ai Q. (2014). Improved Critical Chain Project Management Framework for Scheduling Construction Projects. Journal of Construction Engineering and Management140(12). https://doi.org/10.1061/(ASCE)CO.1943-7862.0000908

  • McTague B. (2002). Productivity improvements on Alberta major construction projects: Phase I - Back to Basics. Alberta Economic Development.

  • MoUD. (2013). Ministry of Urban Development and Construction. Directives for the Registration of Construction Professionals and Contractors April 2013 Addis Ababa. Retrieved from https://www.ethioconstruction.net/sites/default/files/Law/Files/Directives%20for%20Ethiopian%20Contractors%20Registration.doc

  • MoWUD. (1995). General Conditions of Contract Ethiopia. Retrieved from https://www.ethioconstruction.net/sites/default/files/Law/Files/General%20Conditions%20of%20Contract%2C%20MoWUD.pdf

  • Wubishet J. (2004). Performances for public construction projects in developing countries: federal road & educational building projects in Ethiopia. Trondheim: Norwegian University of Science and Technology Faculty of Social Sciences and Technology Management Department of Industrial Economics and Technology Management.

Search
Journal information
Metrics
All Time Past Year Past 30 Days
Abstract Views 0 0 0
Full Text Views 237 237 30
PDF Downloads 199 199 20