Selection of the Longwall Face Crew with Respect to Stochastic Character of the Production Process – Part 1 – Procedural Description / Wyznaczanie Obsady Przodka Ścianowego Z Uwzględnieniem Stochastycznego Charakteru Procesu Produkcyjnego. Cz. 1 – Opis Metody

Open access

Abstract

A proposal of the method aimed at the longwall face crew selection with respect to stochastic character of the production process has been described in this study. Modules, which can be isolated from the production cycle, as well as methods of determination of the probability function density describing duration of individual action realized in production process, have been described in the first part of the study.

Procedure of crew selection of individual modules, including optional crew selection, has been described in next chapters. Statement of action, which should be executed in order to apply the proposed method, including final conclusions, is discussed in the last chapter.

Snopkowski R., 1990. Numerisches Modell des Produktionsprozesses verwirklicht in einem Strebstoss des Kohlenbergwerks. Arch. Min. Sci., Vol. 35, No 4, p. 617-630.

Snopkowski R., 1994. Die Kritikalitätsrichtwerte in der Bewertung der Einflusswahrscheinlichkeit der Tätigkeiten und des am Strebstoss Ausgeführten Arbeitsganges auf die Gewinnung. Arch. Min. Sci., Vol. 39, No 1, 1994 p. 111-126.

Snopkowski R., 2000. Metoda identyfikacji rozkładu prawdopodobieństwa wydobycia uzyskiwanego z przodków ścianowych kopalń węgla kamiennego. Uczelniane Wydawnictwa Naukowo-Dydaktyczne, seria Rozprawy Monografie, nr 85.

Snopkowski R., 2000. Boundary conditions for elementary functions of probability densities for the production process realized in longwalls. Arch. Min. Sci., Vol. 45, No. 4, p. 501-510/

Snopkowski R., 2002. Longwall output plan considered in probability aspect. Arch. Min. Sci., Vol. 47, No. 3, p. 413-420.

Snopkowski R., 2005. The use of the Stochastic Simulation for Identyfication of the Function of Output Probability Density. Arch. Min. Sci., Vol. 50, No. 4, p. 497-504.

Snopkowski R., 2007. The use of stochastic simulations in modeling and analysis of mining processes. Proceedings of the 16th international conference on Systems science. Vol. 3, Applications of systems analysis to technical systems; Applications of systems analysis to non-technical systems; Applications of systems analysis to biomedical systems: Wrocław.

Snopkowski R., 2007. Symulacja stochastyczna. Uczelniane Wydawnictwa Naukowo-Dydaktyczne, Kraków.

Snopkowski R., 2009. Stochastic model of the longwall face excavation using two-way shearer mining technology. Arch. Min. Sci., Vol. 54, No. 3, 2009, p. 573-585.

Snopkowski R., Napieraj A., 2012. Method of the production cycle duration time modeling within hard coal longwall faces. Arch. Min. Sci., Vol. 57, Issue 1, p. 121-138.

Sukiennik M., 2011. Metoda wyznaczania obsady w przodkach ścianowych kopalń węgla kamiennego z uwzględnieniem stochastycznego charakteru procesu produkcyjnego, Praca doktorska, Akademia Górniczo-Hutnicza im. Stanisława Staszica, Kraków.

Archives of Mining Sciences

The Journal of Committee of Mining of Polish Academy of Sciences

Journal Information


IMPACT FACTOR 2016: 0.550
5-year IMPACT FACTOR: 0.610

CiteScore 2016: 0.72

SCImago Journal Rank (SJR) 2016: 0.320
Source Normalized Impact per Paper (SNIP) 2016: 0.950

Metrics

All Time Past Year Past 30 Days
Abstract Views 0 0 0
Full Text Views 167 140 8
PDF Downloads 51 46 3