Modelling Labour Productivity Rates for Reinforcement Works

Open access

Summary

Construction planning always requires labour productivity estimation. Often, in the case of monolithic construction works, the available catalogues of productivity rates do not provide a reliable assessment. The paper deals with the problem of labour estimation for reinforcement works. An appropriate model of labour prediction problem is being introduced. It includes, between others, staff experience and reinforcement buildability. In the paper it is proposed, that labour requirements can be estimated with aggregated classifiers. The work is a continuation of earlier studies, in which the possibility of using classifier ensembles to predict productivity in monolithic works was investigated.

If the inline PDF is not rendering correctly, you can download the PDF file here.

  • 1. ARH Arbeitszeit-Richtwerte “Teilausgabe Stahlbetonarbeiten” Zeittechnik Verlag Neu-Isenburg 2015.

  • 2. A. Ding “DeWALT Construction Estimating Complete Handbook” Cengage Learning 2016.

  • 3. W. Drozd M. Kowalik “Decision trees algorithm in the analysis of the construction site accidents” Scientific Review – Engineering and Environmental Science 26(2): 226-233 2017.

  • 4. C. Hofstadler “Kalkulation von Stahlbetonarbeiten” Vorlesung Technische Universität Graz 2011.

  • 5. C. Hofstadler G. Franzl “Bewehrungsarbeiten in Baubetrieb” Verlag des VÖBV 2011.

  • 6. M. Gajzler A. Dziadosz P. Szymański „The problems of choice of decision making support method in construction” Technical Transactions 1-B (B): 71-84 2010.

  • 7. E. Gatnar “Multi-model approach in discrimination and regression” PWN Warsaw 2009.

  • 8. G. Grimscheid C. Motzko “Kalkulation Preisbildung und Controlling in der Bauwirtschaft” Springer Verlag 2013.

  • 9. G. Jergeas “Detailed Design and Constructability” PhD Thesis Loughborough University of Technology United Kingdom 1989.

  • 10. A. Krawczyńska-Piechna “Modelling Labour Rates in Concrete Construction Planning” Acta Sci. Pol. Architectura 16(2): 13-19 2017.

  • 11. R. L. Peurifoy G. D. Oberlender “Formwork for Concrete Structures” McGraw-Hill New York 2011.

  • 12. E. Plebankiewicz J. Malara “The algorithm for the evaluation of construction workers’ labour productivity” Technical Transactions 6: 153-161 2017.

  • 13. E. Plebankiewicz M. Juszczyk J. Malara “Identification and evaluation of factors affecting the performance of construction workers” Scientific Review – Engineering and Environmental Science 23: 271-278 2014.

  • 14. K. Plümecke V. Kühne M. Kattenbusch “Preisermittlung für Bauarbeiten” Verlagsgesellschaft Rudolf Müller GmbH & Co. KG Köln 2017.

  • 15. D. G. Proverbs G. D. Holt P. O. Olomolaiye “Construction Resource/Method Factors Influencing Productivity for High Rise Concrete Construction” Construction Management and Economics 17: 577-587 1999.

  • 16. E. Sarviel “Construction Estimating Reference Data” Craftsman Book Company Corte del Cedro 1998.

  • 17. L. Song S. M. AbouRizk “Measuring and Modelling Labour Productivity Using Historical Data” Journal of Construction Engineering and Management 134 (10): 786-794 2008.

  • 18. Raport podsumowujący badanie Ministerstwa Rodziny Pracy i Polityki Społecznej w Polsce “Barometr zawodów 2018” Wojewódzki Urząd Pracy w Krakowie Kraków 2017.

Search
Journal information
Impact Factor


CiteScore 2018: 0.80

SCImago Journal Rank (SJR) 2018: 0.304
Source Normalized Impact per Paper (SNIP) 2018: 0.866

Metrics
All Time Past Year Past 30 Days
Abstract Views 0 0 0
Full Text Views 55 55 9
PDF Downloads 53 53 11