Search Results

You are looking at 1 - 10 of 642 items for :

  • management of construction projects x
Clear All
Open access

Tomáš Mandičák, Peter Mesároš and Mária Kozlovská

Intranet: ein Medium der Mitarbeiter kommunikation. Vol. 9 of Medien und Markte. UVK, Konstanz. Infoware. (2014). Hybridne využivanie IT a cloud computing: Hybridne riešenia v IT s využitim cloud computing. IT News. Jiao, Y., Wang, Y., Zhang, S., Li, L., Yang, B., & Yuan, L. (2013). A cloud approach to unified lifecycle data management in architecture, engineering, construction and facilities management: Integrating BIMs and SNS. Advanced Engineering Informatics, 27, pp. 173-188. Kovacic, I., Vasilescu, D., Filzmoser, M

Open access

Jarosław Górecki

Project Management Body of Knowledge (PMBOK® Guide) – Fourth Edition . Project Management Institute, Inc., Newtown Square, Pennsylvania 2008, p. 7. [8] Bizon-Górecka J., Górecki J. - Risk pyramid in the enterprise [in] Studies & Proceedings of the Polish Association for Knowledge Management, No. 19. Polish Association for Knowledge Management, Bydgoszcz 2009, pp. 18-27. [9] Zavadskas E.K., Turskis Z., Tamošaitiene J. - Risk assessment of construction projects [in] Journal of Civil Engineering and Management, vol. 16, no. 1, 14 October 2010, pp. 33

Open access

R. S. Abdulrahman, A. D. Ibrahim and P. G. Chindo

References Adnan, H. (2008). An assessment of risk management in joint venture projects in Malaysia. Asian social sciences, 4, 99-106. Adeleke, A. Q., Bahaudin, A. Y., Kamaruddeen, A. M., Bamgbage, J. A., Salimon, M. G., Waris, M., and Sorooshian, S. (2018). The influence of organisational external factors on construction risk management among Nigerian construction companies. Safety and health at work , 9, 115-124. Aibinu, A. A. and Jagboro, G.O. (2002). The effects of construction delays on project delivery in Nigerian construction industry

Open access

Mariusz Urbański, Adnan Ul Haque and Isaiah Oino

Literature Ahmad, M. S. (2012). Impact of organizational culture on performance management practices in Pakistan. Business Intelligence Journal , 5 (1), 50-55. Arditi, D. (1985). Construction productivity improvement. Journal of Construction Engineering and Management , 111 (1), 1-14. doi: 10.1061/(ASCE)0733-9364 Aronson, Z. H., & Lechler, T. G. (2009). Contributing beyond the call of duty: examining the role of culture in fostering citizenship behavior and success in project-based work. R&D Management , 39 (5), 444-460. doi: 10.1111/j

Open access

Shakil Ahmed

and opportunities of augmented reality applications in architecture, engineering, and construction. Automation in Construction, 33, pp. 116-122. Chittaro, L., Corbett, C. L., McLean, G., & Zangrando, N. (2018). Safety knowledge transfer through mobile virtual reality: A study of aviation life preserver donning. Safety Science, 102, pp. 159-168. Demirkesen, S., & Arditi, D. (2015). Construction safety personnel’s perceptions of safety training practices. International Journal of Project Management, 33(5), pp. 1160

Open access

Tadej Valenko and Uroš Klanšek

References Adeli, H., & Karim, A. (1997). Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. doi: 10.1061/(ASCE)0733-9364(1997)123:4(450). Al Haj, R., & El-Sayegh, S. (2015). Time-cost optimization model considering float-consumption Impact. Journal of Construction Engineering and Management, 141(5), 04015001. doi: 10.1061/ (ASCE)CO.1943-7862.0000966. Biafore, B. (2013). Microsoft Project 2013: The Missing Manual

Open access

Piotr Tworek

References [1] A Guide to the Project Management Body of Knowledge (PMBOK® Guide), Fourth Edition. Management Training & Development Centre, Warszawa 2009. [2] Al-Bahar, F.J., Crandall, C.K., Systematic Risk Management Approach for Con-struction Projects, Journal of Construction Engineering and Management, Vol. 116, No. 3, 1990. [3] Boothroyd, C., Emmett, J., Risk Management. A Practical Guide for Construction Professionals , Witherby & Co. Ltd., London, 1996. [4] Carter, B

Open access

Žanesa Ljevo, Mladen Vukomanović and Suada Džebo

References Berssaneti, F. T., & Carvalho, M. M. (2015). Identification of variables that impact project success in Brazilian companies. International Journal of Project Management, 33(3), pp. 638-649. Dogbegah, R., Owusu-Manu, D.-G., & Omoteso, K. (2011). A principal component analysis of project management competencies for the Ghanaian construction industry. Australasian Journal of Construction Economics and Building, 11(1), pp. 26-40 Field, A. (2005). Factor Analysis Using SPSS: Theory and Application

Open access

Roumeissa Salhi, Karima Messaoudi and Souad Sassi Boudemagh

References [1] Assaf, S. and Al-Hejji, S. (2005) “Causes of delay in large construction projects”.International Journal of Project Management, Volume 24, Issue 4, pp 349-357. [2] Long Le-Hoai, Young Dai Lee, et Jun Yong Lee. (2008) “Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries”. KSCE Journal of Civil Engineering, Volume 12, Issue 6, pp 367-377. [3] Mohan,M. Kumaraswamy et Daniel W. M. Chan(2010)“Contributors to construction delays”. Construction

Open access

Zairra Mat Jusoh and Narimah Kasim

References [1] Ibrahim A.R., Roy M.H., Ahmed Z., Imtiaz G., An investigation of the status of the Malaysian construction industry , Benchmarking: An Int. J., 17, 4, 263–270, 2010. [2] Nwachukwu C.C., Emoh F.I., A systems approach in analysing material constraining factors to construction project management success in Nigeria , Interdisciplinary J. of Contemporary Research in Business, 2, 5, 90–105, 2010. [3] Winch G.M., Managing construction projects – an information processing approach , (2nd ed.), West Sussex: John Wiley & Sons, Ltd, 2010