Search Results

1 - 1 of 1 items :

Clear All

Checking Attribute Control Chart Assumptions. Quality Engineering , 13(1), 19-26. Khesal, T., Saghaei, A., Khalilzadeh, M., Rahiminezhad Galankashi, M., & Soltani, R. (2019). Integrated cost, quality, risk and schedule control through earned value management (EVM). Journal of Engineering, Design and Technology , 17(1), 183-203. Laney, D. (2007). P-Charts and U-Charts Work (But Only Sometimes). Quality Digest , 14(4). Retrieved from https://www.qualitydigest.com/may07/departments/what_works.shtml on October 10, 2019. Laney, D. B. (2002). Improved control charts for