Search Results

You are looking at 91 - 100 of 6,527 items for :

  • construction x
Clear All
Open access

T. Hanák

References 1. Act no. 134/2016 Coll., on Public Procurement (the Czech Republic) 2. P. Ballesteros-Pérez, M. Skitmore, R. Das, M.L. Del Campo-Hitschfeld, “Quick abnormal-bid-detection method for construction contract auctions”. Journal of Construction Engineering and Management, 141:7, 2015. 3. S. Beall, C. Carter, P. Carter, T. Germer, T. Hendrick, S. Jap, L. Kaufmann, D. Maciejewski, R. Monczka, K. Peterson, “The Role of Reverse Auctions in Strategic Sourcing”, CAPS Research Report, 2003. 4. I

Open access

Kristýna Havlová

.04.003 Epstein, M. J., & Roy, M.-J. (2001). Sustainability in action: Identifying and measuring the key performance drivers. Long range planning , 34(5), 585-604. Retrieved from http://naulibrary.org/dglibrary/admin/book_directory/Bus_Admin/1673.pdf Graham, J. R., Harvey, C. R., & Rajgopal, S. (2005). The Economic Implications Of Corporate Financial Reporting. Journal of accounting and economics, 40(1), 3-73. Retrieved from http://core.ac.uk/download/pdf/6822971.pdf IFRS Foundation. (n.d.). IAS 11 Construction contracts

Open access

Tadej Valenko and Uroš Klanšek

References Adeli, H., & Karim, A. (1997). Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. doi: 10.1061/(ASCE)0733-9364(1997)123:4(450). Al Haj, R., & El-Sayegh, S. (2015). Time-cost optimization model considering float-consumption Impact. Journal of Construction Engineering and Management, 141(5), 04015001. doi: 10.1061/ (ASCE)CO.1943-7862.0000966. Biafore, B. (2013). Microsoft Project 2013: The Missing Manual

Open access

Miloslav Kováč

Abstract

The main task of configuring engineer by designing enclosure construction is to setup performances of the wall to the best options for existing conditions of the structure. Selecting and adjusting bearing elements of perimeter wall is the first step, however appropriateness and position of chosen materials has major influence on technical properties and architectural expression of structure. Besides light vertical constructions (LVC) there are light wooden constructions from glued elements (LPVC), heavy vertical constructions (HVC) and prefabricated vertical constructions (PVC). All types have specifications allowing alternatives in terms of layer structure and bearing elements position. Each type is considered in terms of: structure – 2D drawing and 3D model, thermal insulation, overall heat transfer coefficient, architectural examination.

Open access

Ana Letícia B. F. Lemos and Linda Kauškale

.03.001 Garcia-Estringana, P., Alonso-Blázquez, N., & Alegre, J. (2010). Water storage capacity, stemflow and water funneling in Mediterranean shrubs. Journal of Hydrology, 389(3-4), 363-372. https://doi.org/10.1016/j.jhydrol.2010.06.017 Johnson, J., Newton, J. (2004). Building Green, a Guide for Using Plants on Roofs and Pavement. London: The London Ecology Unit. Köhler, M., & Keeley, M. (2005). The green roof tradition in Germany: The example of Berlin. In L. Hoffman, W. McDonough (Eds.). Green Roofs: Ecological Design and Construction. (pp

Open access

Alexander A. Davydov, Stefano Marcugini and Fernanda Pambianco

Probability Performance of Cyclic Redundancy-Check Codes of 16-bit Redundancy. − IEEE Trans. Comm., Vol. 147 , 2000, No 5, pp. 253-256. 4. Bartoli, D., S. Marcugini, F. Pambianco. A Computer Based Classification of Caps in PG(5, 2). arXiv:1203.0994 [math.CO], 2012. 5. Davydov, A. A., S. Marcugini, F. Pambianco. Further Results on Binary Codes Obtained by Doubling Construction. − In: Proc. Eighth International Workshop on Optimal Codes and Related Topics, OC’17 (in Second International Conference “Mathematics Days in Sofia”), Sofia, Bulgaria, 2017, pp. 73

Open access

Tatjana Farbtuha, Žanna Martinsone, Ivars Vanadziņš, Jānis Dundurs, Inese Mārtiņsone and Anita Piķe

References Anonīms. (2003). Valsts Darba inspekcija. Atskaite par Latvijas - Dānijas sadarbības projekta realizāciju ES direktīvas 92/57/EEC par darba drošības un veselības aizsardzības prasībām pagaidu vai pārvietojamos būvlaukumos ieviešanā [Report on the realisation of the Latvian - Danish cooperation project on introducing the EU Directive 92/57/EEC on the implementation of minimum safety and health requirements at temporary or mobile construction sites]. http

Open access

Radoslav Avlijaš, Goran Avlijaš and Milenko Heleta

References Assaf, S.A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-357. doi:10.1016/j.ijproman. 2005.11.010. Avlijaš, R., & Avlijaš, G. (2010). Upravljanje projektom. Beograd: Univerzitet Singidunum. In Serbian. Christensen, D.S., & Templin, C. (2002). EAC evaluation methods: do they still work. Acquisition Review Quarterly, 9, 105-116. Christensen, D.S. (1998). Cost and benefi ts of earned value management

Open access

Valeria Pugacheva

, 2016, from www.innoros.ru Vladimirova, I. L., & Pugacheva, V. S. (2013). The main principles of a comprehensive evaluation of the effectiveness using venture investment in innovative projects in construction .Bulletin of Russian Plekhanov University of Economic, 2(56), 32-38. Zakieva, N. M. (2012). Real options as a methodological framework of innovation project management. New KGASU, 3(21), 183-193. Ziyatdinov, A. Sh. (2010). Real options method for the evaluation of investment projects. Economics and Management

Open access

Begum Sertyesilisik

-Based Damage Estimation of Buildings under Earthquake Loading Condition. International Conference on Sustainable Design, Engineering and Construction, Procedia Engineering, 145: 1051-1058. Alwan, Z., Jones, P., Holgate, P. 2017. Strategic sustainable development in the UK construction industry, through the framework for strategic sustainable development, using Building Information Modelling. Journal of Cleaner Production, 140: 349-358. Auf De Heide, E. 1989. Disaster Response: Principles and Preparation and Coordination, The Mosby Company