Abstract

The installation of thermal energy storage system (TES) provides the optimisation of energy source, energy security supply, power plant operation and energy production flexibility. The aim of the present research is to evaluate the feasibility of thermal energy system installation at Riga TPP–2. The six modes were investigated: four for non-heating periods and two for heating periods. Different research methods were used: data statistic processing, data analysis, analogy, forecasting, financial method and correlation and regression method. In the end, the best mode was chosen – the increase of cogeneration unit efficiency during the summer.

Abstract

In the research, the influence of optimised combined cycle gas turbine unit – according to the previously developed EM & OM approach with its use in the intraday market – is evaluated on the generation portfolio. It consists of the two combined cycle gas turbine units. The introduced evaluation algorithm saves the power and heat balance before and after the performance of EM & OM approach by making changes in the generation profile of units. The aim of this algorithm is profit maximisation of the generation portfolio. The evaluation algorithm is implemented in multi-paradigm numerical computing environment MATLab on the example of Riga CHP-2. The results show that the use of EM & OM approach in the intraday market can be profitable or unprofitable. It depends on the initial state of generation units in the intraday market and on the content of the generation portfolio.

Abstract

Nowadays the planet is facing emerging global issues related to climate change, pollution, deforestation, desertification and the number of challenges is expected to grow as the global population is forecasted to reach 10 billion margin by 2050. A concept of circular economy can have a positive contribution to the current development trajectories. In order to implement it, preferably all the energy should be produced by using renewable energy sources, but there has always been a challenge for storage of renewable energy. Therefore, considering technical and economical parameters, construction options for a pumped storage hydropower plant in Latvia have been evaluated using the desk research methodology. Results have shown that Daugavpils PSHP is the most attractive project from the technological point of view, but it requires the greatest amount of investment and construction of Daugavpils HPP. At present all the construction options for PSHP in Latvia are economically disadvantageous and would not be viable without co-financing from European or national funds. Considering both technical and economical parameters, the authors emphasise Plavinas PSHP construction option.

Abstract

The authors estimate the potential for power generation from water resources of small and medium-sized rivers, which are abundant in Latvia. They propose the algorithm for optimal operation of a small-scale hydropower plant (SHPP) at the chosen optimality criterion in view of the plant’s participation in the market. The choice of SHPP optimization algorithm is made based on two mathematical programming methods - dynamic and generalized reduced gradient ones. Approbation of the algorithm is illustrated by an example of optimized SHPP operation.

Abstract

Energy policy of the European Community is implemented by setting various goals in directives and developing support mechanisms to achieve them. However, very often these policies and legislation come into contradiction with each other, for example Directive 2009/28/EC on the promotion of the use of energy from renewable sources and Directive 2012/27/EU on energy efficiency, repealing Directive 2004/8/EC on the promotion of cogeneration based on a useful heat demand.

In this paper, the authors attempt to assess the potential conflicts between policy political objectives to increase the share of high-efficiency co-generation and renewable energy sources (RES), based on the example of Riga district heating system (DHS).

If a new heat source using biomass is built on the right bank of Riga DHS to increase the share of RES, the society could overpay for additional heat production capacities, such as a decrease in the loading of existing generating units, thereby contributing to an inefficient use of existing capacity.

As a result, the following negative consequences may arise: 1) a decrease in primary energy savings (PES) from high-efficiency cogeneration in Riga DHS, 2) an increase in greenhouse gas (GHG) emissions in the Baltic region, 3) the worsening security situation of electricity supply in the Latvian power system, 4) an increase in the electricity market price in the Lithuanian and Latvian price areas of Nord Pool power exchange.

Within the framework of the research, calculations of PES and GHG emission volumes have been performed for the existing situation and for the situation with heat source, using biomass. The effect of construction of biomass heat source on power capacity balances and Nord Pool electricity prices has been evaluated.

Abstract

Intermittent generation (solar PV and wind energy) integration in power production portfolio as well as electricity price fluctuations have changed the running manner of conventional combined heat and power (CHP) plants: the shift from base load operation to running in cyclic modes. These cogeneration power plants are not adapted to new running conditions. The level of CHP plant flexibility should be improved to operate profitably and efficiently from both technical and fuel usage point of view. There are different ways to increase the flexibility of power plants. Before any improvements, the situation at power plants should be evaluated and the weakest points defined. In this publication, such measures are presented on Riga CHP-2 plant example: installation of heat storage tank; extension of operation rang; acceleration of start-ups.