Search Results

1 - 2 of 2 items

  • Author: Leonas Ustinovicius x
Clear All Modify Search
Choosing a Proper Method for Strengthening WPC Beams with Grooving Method Using Swara-Edas

Abstract

Wood plastic composite (WPC) is a lightweight material, resistant against corrosion and damage, with recyclability of consuming materials. These materials usually used in marine structures frequently due to their unique features. In order to strengthen beams made by this material, usually Fibre-reinforced plastic (FRP) sheets are used, and one of the fracture modes in these beams is debonding of FRP sheet from the surface of the beams. To deal with this problem some grooves are used in the surface of the beam to improve the contact surface. The grooves include longitudinal, transverse and diagonal grooves. The main goal of this study is to assess different grooving methods in WPC-FRP beams. In this regard, primarily criteria (improving resistance, performance speed, performance complexity, performance costs, displacement and absorbing energy) were determined through interviews with experts in this field in order to assess the beams. Then, SWARA method employed to evaluate criteria with a policy based perspective and finally EDAS method applied for evaluating related alternatives. Based on obtained results, the longitudinal groove method is the best way of strengthening WPC beams to prevent debonding.

Open access
Challenges of BIM technology application in project planning

Abstract

The study aimes at identification of the difficulties in choosing the correct concept of the main building process. The use of a proper BIM design may help the user avoid mistakes and make the building process faster as well as less financial resource intensive. The authors focused on literature review, analysing the difficulties of the BIM design software technology in construction project planning. The biggest flaws in BIM design are inherent in three building process stages: 1) the preparation of a building investment project, and the analysis of the existing situation; 2) the preparation of the building execution technology project; 3) the existing standard processing and information collection in building exploitation period. The analysis shows a persistent need for a deeper BIM design research, to improve information interchange formats that would ensure as much design information saved as possible with ensured feedback. As well as in BIM design, the software packages must be improved by supplementing them with deficient tools or programme codes. After the research of BIM design software, it was determined that architectural, constructional and MEP programs work best interdependently and get analysed the most. These programs work best as they make the least number of mistakes when the model is created in one setting and has many tools. This type of design software data is kept internally, and they are converted into IFC or other information interchange format. Without changing the format, the data is not lost, and this is the reason behind fluent information interchange.

Open access