Search Results

You are looking at 1 - 5 of 5 items for

  • Author: E. Plebankiewicz x
Clear All Modify Search
Open access

E. Plebankiewicz

Abstract

The selection of a contractor is one of the most important among decisions made by the owner of a construction. The application of the prequalification procedure enables the selection of the most competent tenderers. Various mathematical models are helpful in carrying out prequalification procedure. In the paper, some selected mathematical models are briefly characterized and model based on the theory of fuzzy sets is offered. The applied model takes into consideration the owner’s various objectives, as well as different evaluation criteria. The results of the sensitivity analysis of the model are also presented. Part of a computer software applying an earlier presented prequalification mathematical model is described

Open access

E. Plebankiewicz and P. Karcińska

Abstract

The basic element of a project organizing construction works is a schedule. The preparation of the data necessary to specify the timings of the construction completion as indicated in the schedule involves information that is uncertain and hard to quantify. The article presents the methods of building a schedule which includes a fuzzy amount of labour, time standards and number of workers. The proposed procedure allows determining the real deadline for project completion, taking into account variable factors affecting the duration of the individual works.

Open access

E. Plebankiewicz, M. Juszczyk and J. Malara

Abstract

The article presents briefly several methods of working time estimation. However, three methods of task duration assessment have been selected to investigate working time in a real construction project using the data collected from observing workers laying terrazzo flooring in staircases. The first estimation has been done by calculating a normal and a triangular function. The next method, which is the focus of greatest attention here, is PERT. The article presents a way to standardize the results and the procedure algorithm allowing determination of the characteristic values for the method. Times to perform every singular component sub-task as well as the whole task have been defined for the collected data with the reliability level of 85%. The completion time of the same works has also been calculated with the use of the KNR. The obtained result is much higher than the actual time needed for execution of the task calculated with the use of the previous method. The authors argue that PERT is the best method of all three, because it takes into account the randomness of the entire task duration and it can be based on the actual execution time known from research.

Open access

E. Plebankiewicz, K. Zima and D. Wieczorek

Abstract

The paper presents an approach to evaluating a building throughout its whole life cycle in relation to its sustainable development. It describes basic tools and techniques of evaluating and analysing the costs in the whole life cycle of the building, such as Life Cycle Assessment, Life Cycle Management, Life Cycle Cost and Social Life Cycle Assessment. The aim of the paper is to propose a model of cost evaluation throughout the building life cycle. The model is based on the fuzzy sets theory which allows the calculations to include the risks associated with the sustainable development, with the management of the investment and with social costs. Costs incurred in the subsequent phases of the building life cycle are analysed and modelled separately by means of a membership function. However, the effect of the analysis is a global cost evaluation for the whole life cycle of the building.

Open access

A. Lesniak, E. Plebankiewicz and K. Zima

Abstract

One of the contract awarding systems in public sector in Poland is the Design & Build system. In this system, a client concludes a contract agreement with only one company, a contractor, in order to carry out both design and construction of works. While deciding on this form of delivery of a public project, the client is obliged to conduct a single proceeding aiming to select the contractor. In this paper, public works contracts awarded in the D&B system in Poland are analysed, whilst attention was put on the contracting modes and assessment criteria. The results are assessed against the experience of other countries and recommended methods for selection of the Design and Build contractor.