Browse

1 - 10 of 913 items :

  • Engineering x
  • Business and Economics x
  • Business Management, other x
  • Business Management x
  • Mechanical Engineering x
Clear All

Abstract

The construction industry is changing constantly and becoming more complex. It requires new strategies for compliance with national and international scenarios. Developing each project is associated with many limitations, including time, cost, changes, wastes, and errors, which are often not avoidable. Due to numerous project stages and complexities in the construction industry, usually, different mistakes and duplications occur. Meanwhile, Building Information Modeling (BIM) has created one of the most important and essential changes in this industry and results in more in-depth cooperation among project stakeholders. BIM is one of the most recent innovations in the construction industry, which resolves the problems of projects faster. BIM can be applied by architects, engineers, contractors, project managers, etc. to achieve objectives such as reducing design errors, reducing time and cost, improving design and construction integration, and increasing coordination and cooperation among different sections. Given the significance of project success in every country and several problems in each project, using BIM is an appropriate solution, which its proper implementation requires understanding its benefits that is the main aim of this study. This research identifies and classifies these benefits through the Systematic Literature Review (SLR) method, describing the significance of using BIM in infrastructure projects.

Abstract

health-related problems and even death among animals and human beings. Agriculture is the main food source; thus, many interventions are made such as that of irrigation by the local county and national government initiated through the National Irrigation Board (NIB). Despite the irrigation projects food insufficiency still persists, therefore their sustainability is questionable. One such approach to improving the sustainability of irrigation projects is participatory monitoring and evaluation which leads to ownership and then higher sustainability. In the study, the objective was to asses if taking corrective action after participatory monitoring and evaluation (PME) influence project sustainability. The study used a descriptive survey and correlation designs to collect data from 316 respondents selected using stratification sand purposeful with strict randomization. Questionnaires were administered and interviews were conducted on selected sample respondents on appointed dates. Data were analyzed using SPSS version 25.0 to get descriptive statistics, correlations coefficients were obtained to test association and degree of strength. Testing of the hypothesis was done using linear regression. The study findings were that a large number of respondents were between ages 31 to 40 years and most were female with their highest level of education being primary school. The influence of PME capacity building on the dependent variable and irrigation projects sustainability found that the farmers were not taken for exposure visits and project officers were not accountable for money use. Age, gender, and education level have very minimal influence on PME capacity building. PME capacity building had a weak positive influence of r = 0.290 and it explained only 8.4% of irrigation projects sustainability in Kitui County. The study recommends that to improve project capacity building: project revenue must be controlled on use, farmers must be taken for exposure visits to learn from successors, project officers should be accountable for funds use, and project guidelines should be improved to increase sustainability. Implementation of these recommendations will reduce the loss of Arid and Semi-Srid Lands (ASALs) and attain higher and longer sustainability in food projects, thus, reducing the recurrence rate of food shortage, improve and hasten the implementation of irrigation projects, show the need to involve primary stakeholders in project monitoring and appraisal for sustainability, better and efficient decisions by policymakers to increase chances of project’s success.

Abstract

The construction project being studied is a government investment related to the relocation of a biomedical institute delivering research-based knowledge and contingency support in the fields of animal health, fish health and food safety. The project covers a total of 63,000 square meters distributed over 10 buildings with a very high degree of complexity. The design alone has required 1 million hours, which relates to a client cost of about 100 million Euro. The purpose of this paper is to study the applied methodology for managing the detailed design to identify lessons learned from the project. The theory underlying the study is inspired by lean design management and design theory linked to design as phenomena, including reciprocal interdependencies, iteration, decomposition, design as a “wicked problem”, learning, gradual maturation, etc. The article is based on an abductive research design and has been implemented as a case study where both qualitative and quantitative methods have been used.

Abstract

Construction projects are much appreciated by both client and contractor when completed on schedule and within budget so as to avoid cost overruns. The Zambian building sector normally experiences time and cost overruns. This study investigated the feasibility of using tilt-up construction in the construction of commercial building walls. The methodology used consisted of a literature review, a questionnaire survey and a scenario analysis consisting of a hypothetical 4900 square meter commercial building with a height of 8 meters. Sixty-six questionnaires were administered to design professionals operating in the Zambian building sector using simple random sampling and thirty-six were returned giving a response rate of 55%. The data were analyzed using descriptive statistics. Cost analysis was done on a hypothetical building as no contractor was found using tilt-up construction in the construction sector. The study established that tilt-up was, in fact, more expensive than the conventional methods (concrete blocks and in-situ reinforced concrete walls), but it was faster, hence, making it viable in respect to time and not cost in the Zambian construction industry (ZCI). Additionally, necessary expertise was available with the exception of a certified tilt-up practitioner and a sealant sub-contractor in cases where a sealant contractor is needed. The study has identified that currently in the Zambian building sector tilt-up construction can be used when time is more important than the cost. However, challenges such as site size (limited space), the unavailability of building regulation for tilt-up construction and the economic capacity of the client or capacity need to be addressed for enhancing the practical application of tilt-up construction in ZCI.

Abstract

This study tries to investigate project success through inclusive leadership role along with self-efficacy. Data sets were collected using adopted questionnaires of previous studies from employees working on the metro bus project, their supervisors and passengers of metro bus service from Rawalpindi to Islamabad route in Pakistan. This study is measuring the effects of inclusive leadership on project success through self-efficacy which makes it causal in nature. The time lag data collection method was adopted. In order to reach correct findings, potential biases were controlled by theoretical and statistical controls. Exploratory factor analysis was used to test structural modelling, average variance and composite reliabilities using Smart PLS. SPSS 21.0 was used for regression analysis, bias correction measures were also considered. The study revealed that inclusive leadership is associated in a positive manner with project success. The mediating role of self-efficacy in the relationship of inclusive leadership and project success was also supported. In addition, theoretical and practical implications in the context of this study are discussed in detail.

Abstract

Integrated Project Delivery (IPD) is introduced as a new delivery system that fosters high efficiency by delivering accurate information and new technologies in a collaborative team environment. In this sense, the research aimed to review the IPD principles and their main categories, such as contract, process, information & modeling (I&M), team and communication as well as perform a qualitative analysis to illustrate the current research trends. The qualitative analysis performed was made through a series of collected articles from 2001 to 2018 in 08 different scientific database websites. In terms of the results, the contract category illustrated a strong trend, where the studies are focus on collaborations and frameworks to enhance high efficiency in construction. In the I&M category, demonstrated an increasing trend applying the Building Information & Modeling (BIM) subject as well as team category, where showed the importance of a wellstructured team and their impact on the project., The process and communication categories illustrated a weak trend, allowing opportunities in the field. Finally, the current study reviewed and analyzed the IPD and its main categories allowing a solid basis for future research.

Abstract

Voice recognition technology has been in existence over several decades but its application in the construction industry has been minimal. Despite the several advantages it offers, its application has been limited to smart building integration only. This study has made a significant contribution by integrating voice recognition technology into key-in building quantities estimation software. The Visual Basic programming language was used to design and code the interface of the voice recognition system and key-in estimating software model. The prototype model continues to have some challenges because it cannot work efficiently in a noisy work environment and there is limited range of vocabulary it can recognize. This paper seeks to challenge the stakeholders of the construction industry to maximize the benefits of voice recognition technology and integrate it into other construction tasks. In addition, future research can consider integrating building information modeling and voice recognition technology.

Abstract

One of the important factors on which road safety depends is adequate visibility. This article analyses horizontal visibility within road intersections. The visibility condition depends on many factors, primarily on the geometric parameters of road elements and the location of buildings, fences, vegetation etc., neighboring the road. The aim of the research presented in the study was to determine the current condition of horizontal visibility, on the example of twenty two intersections located mostly in built-up rural area along a provincial road near Czestochowa. The research was carried out by two methods (the analysis of satellite photographs and the visual method) and the obtained results were compared. The assessment of the security level was based on applicable regulations and technical guidelines. It was found that the results of the visibility assessment based only on the analysis of maps and satellite photographs are in many cases overestimated, due to the fact that many small elements not visible in the photographs are not taken into account and the occurrence of convex vertical road arches within the field of visibility. However, the main reason for the insufficient visibility at the many intersections is the fact that the geometrical parameters of roads and their surroundings were shaped in the past when the traffic conditions were completely different. It was also noted that road managers perceive this problem and take measures to increase safety within road intersections.

Abstract

Designing and proper implementation of effective processes and providing the customer with high quality products undoubtedly determines the stable position on the market. The aim of the study was to analyse the cost and value of the technological process of doors in the context of creating added value and to identify unnecessary processes (not creating added value) in relation to which appropriate corrective actions could contribute to their elimination. Thanks to the application of remedial measures, consistent with the lean manufacturing concept, the study eliminated, among other things, operations related to unnecessary transport and storage of products, which resulted in both the reduction of time and costs of process implementation.

Abstract

The mining industry in Serbia has an important place in the country's economic development. Bearing in mind that the number of injuries that occur in the mining industry is unacceptably high, occupational safety and health is a challenge that existing and future mines will have to deal with. Studying injuries in mining, it was noticed that injuries requiring an absence from work for more than three days (especially fatal ones) are diametrically different in relation to the cause and manner of events related to injuries for which an absence from work is not necessary. In this research, authors focused on injuries that were characterized as ones requiring an absence from work. The statistical analysis of work-related injuries in mining is presented, as well as analysis of the direct causes of injuries, which are described as unsafe conduct of employees, unsafe conduct of company's management and/or unsafe working environment. In relation to classification of causes of injuries, a recommendation on what needs to be changed in order to remedy this situation in Serbia is given.