Assessment of Risk Management Maturity of Construction Organisations in Joint Venture Projects

Open access

Abstract

For organizations to be successful, they should be committed in managing risk proactively and consistently throughout the project and equally important is the determination of the Risk Management Maturity (RMM) of organizations because it is the commencing point in the review of the current RM systems, practices, and culture of construction organisations. It was reported that construction organisations lack the knowledge of their capability to manage risk and as a result, JV projects continue to fail. Studies have identified, categorised and assessed risk associated with JV projects in their local and international context but no study has assessed the RMM of construction organisations in JV projects. Therefore, this study assessed the RMM of construction organisations in JV projects. The attributes and dimensions used to assess the RMM of construction organisations were identified from literature and used in the survey to collect data from respondents and subsequently analysed using the Fuzzy synthetic evaluation technique. Findings revealed that construction organisations undertaking JV projects are at the “defined maturity level” which means that these organisations only practice informal risk management and uses only qualitative risk assessment technique. The study recommends that further studies should focus on how to improve and move from the current RMM level of construction organisations to the next maturity level (managed and optimised).

If the inline PDF is not rendering correctly, you can download the PDF file here.

  • Adnan H. (2008). An assessment of risk management in joint venture projects in Malaysia. Asian social sciences 4 99-106.

  • Adeleke A. Q. Bahaudin A. Y. Kamaruddeen A. M. Bamgbage J. A. Salimon M. G. Waris M. and Sorooshian S. (2018). The influence of organisational external factors on construction risk management among Nigerian construction companies. Safety and health at work 9 115-124.

  • Aibinu A. A. and Jagboro G.O. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management 20 593-599.

  • Algahtany M. Alhammadi Y. and Kashiwagi D. (2016). Introducing a new risk management model to the Saudi Arabian construction industry. Procedia Engineering 145 940-947.

  • Aniekwu A. N. and Okpala D. C. (2006). Contractual Arrangements and the Performance of the Nigerian Construction Industry (Structural component). Construction Management and Economics 3-11.

  • Augustine I. E. Ajayi J. R. Ade B. A. and Edwin A. A. (2013). Assessment of Risk Management Practices in Nigerian Construction Industry: Toward Establishing Risk Management Index. International Journal of Pure and Applied Sciences and Technology 16 20-31.

  • Bing L. Tiong R. L. Fan W. W. and Chew D. A. (1999). Risk management in international construction joint ventures. Journal of Construction Engineering and Management 125(4) 277-284.

  • Dada J. O. and Jagboro G. O. (2007). An Evaluation of the Impact of Risk on Project Cost overrun in the Nigerian Construction Industry. Journal of Financial Management of Property and Construction 12 37-44.

  • Hopkinson M. M. (2011). The Project Risk Maturity Model: Measuring and Improving Risk Management Capability. England: Gower Publishing Ltd.

  • Hwang B. Zhao E. Wei E. and Chin Y. (2017). International construction joint ventures between Singapore and developing countries: risk assessment and allocation preferences. Engineering Construction and Architectural Management 24.

  • Famakin I. O. Aje I. O. and Ogunsemi D. R. (2012). Assessment of success factors for joint venure construction projects in Nigeria. Emerald Group Publishing Limited. Journal of Financial Management of Property and Construction 17(2) 153-165.

  • Flanagan R. and Norman G. (1993). Risk Management and Construction. London: Blackwell Science Ltd.

  • Idoro G.I. and Okun B.O. (2009). Evaluating the Contribution of Project Team members to Timeoverruns in Nigerian Federal Government projects. Association of Researchers in Construction Management 749-757.

  • Jamil M. Mufti N. A. and Khan A. H. (2008). Risk identification for international joint venture construction projects. First International Conference on Construction in Developing Countries on Advancing and Integrating Construction Education Research Practice Karachi.

  • Jin. X. Zhang G. Liu J. Feng Y. and Zuo J. (2017). Major participants in the construction industry and their approaches to risks: a theoretical framework. Procedia engineering 182 314-320.

  • Likhitruangslip V. and Prasitsom A. (2008). Construction joint venture contracting. Proceedings of the COBRA research conference.

  • Loosemore M. Raftery J. Reilly C. and Higgon D. (2006). Risk Management in Projects 2nd Ed. Oxon UK: Taylor and Francis.

  • Mafakheri F. Breton M. and Chauhan S. (2012). Project-to-organization matching: An Integrated risk assessment approach. International Journal of Information Technology Project Management 3 45-59.

  • Mba B. and Agumba J. (2017). Factors for Selecting Joint Venture Partner for Construction Project in South Africa.Retrieved from http://hdl.handle.net/10210/218675.

  • Mu S. Chen H. Chohr M. and Peng W. (2013). Assessing risk management capability of contractors in subway projects in mainland China. International Journal of Project Management 1-9.

  • Nguyen T. P and Chileshe N. (2015). Revisiting the construction project failure factors in Vietnam. Built environment project and assessment 5 398-416.

  • Nunnally J. C. and Bernstein I. H. (1994). Psychometric theory 3rd edition. New York: McGraw-Hill.

  • Nwachukwu C. C. and Emoh F. I. (2011). Building construction project management as a critical issue in real estate development and investment. American journal of social and management sciences 2 56-75.

  • Oduoza C. F. Odimabo O. and Tamparapoulos A. (2017). Framework for risk management software systems for SMEs in the engineering construction sector. Procedia manufacturing 11 1231-1238.

  • Ojo G. K. (2010). An assessment of the construction site risk-related factors. Proceedings of the 40th Annual General Meeting/Conference of the Nigerian Institute of Building 9-14.

  • Ren Y. T. and Yeo K. T. (2004). Risk management capability maturity model for complex product system (CoPS) projects. International Engineering Management Conference 807-811.

  • Shen L.Y. Wu G.W.C. and Ng C.S.K. (2001). Risk assessment for construction joint ventures in China. Journal of Construction Engineering and Management 127(1) 76-81.

  • Salawu R. A. and Abdullah F. (2015). Assessing Risk Management Maturity of Construction Organisations on Infrastructural Project Delivery in Nigeria. Global Conference on Business & Social Science. Procedia and behavioural sciences 172 643-650.

  • Salawu R. A. (2016). Time risk assessment framework for highway projects in Nigeria. Unpublished PhD thesis Universiti Teknologi Malaysia.

  • Yu Z. Lu C. and Chan D. W. M. (2017). Review of joint ventures studies in construction. International conference on construction and real estate management. American Society of Engineers (ASCE).

  • Zhang G. and Zou P. X. W. (2007). Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China Journal of Construction Engineering and Management 133 771.

  • Zimmerman H. J. (2001). Fuzzy set theory and its application 4th ed. New York: Springer Science + Business Media.

  • Zou P. X. Chen Y. and Chan T. (2010). Understanding and improving your risk management capability: Assessment model for construction organisations. Journal of Construction Engineering and Management 854-863.

Search
Journal information
Metrics
All Time Past Year Past 30 Days
Abstract Views 0 0 0
Full Text Views 230 230 22
PDF Downloads 145 145 11