Exploring Factors Influencing of Project Management Success in Public Building Projects in Nigeria

Open access

Abstract

In Nigerian, public building projects (PBPs) failure and abandonment constitutes one of the hindrances to the development of the nation’s economic system. Therefore, the links between PBPs management success and the built environment professionals (BEPs) is becoming an important field of attention. This study evaluates the application of project planning techniques in PBPs in Nigeria and project planning challenges related to their successful delivery. Review of relevant literature combined with experts’ input revealed twenty three factors; this form the basis for designing a questionnaire adopted to collect relevant data from BEPs. Findings identified poor strategic project planning aligned to project success, unrealistic expectation and overly bureaucratic hiccups from project initiators as the most critical factors influencing project management practices (PMP) affecting success in PBP delivery. The study suggests that unsuccessful project delivery is a reflection of inappropriately applied project planning techniques leading to serious project planning challenges.

[1] Zwikael, O., Bar-Yoseph, B. Improving the capabilities of project team management using the Gestalt cycle of experience. Team Performance Management, 10 (2004) No7. 137-144.

[2] Winter, M., Smith, C., Morris, P.W.G., Cicmil, S. Directions for future research in project management: the main findings of a UK government funded (EPSRC) research network. International Journal of Project Management. 24 (2006). No.8, 638-649.

[3] Thomas, J. Problematizing project management. In D. Hodgson & S. Cicmil (Eds.), Making projects critical (2006). pp. 90-107. Hampshire: Palgrave.

[4] Geraldi, J., Maylor, H., Williams, T.. Now, let’s make it really complex (complicated): A systematic review of the complexities of projects. International Journal of Operations and Production Management, 31 (2011) No 9, 966-990.

[5] McHugh, O., Hogan, M. Investigating the rationale for adopting an internationally-recognised project management methodology in Ireland. International Journal of Project Management (2011), p. 29

[6] Clancy, T. The Standish Group Report, 1995. http://www.projectsmart.co.uk/reports.html Chaos report.

[7] Attarzadeh, I., Siew, H.O. Project Management practices. Success versus failure. International Symposium on Information Technology, 2008. ITSim 2008. Volume1: 1-8.

[8] Standish Group International. Chaos Summary 2009: the 10 laws of Chaos, International Standish Group., 2009. Pp 1-4. http://ptslideshare.net/AccelerateManagement/chaos-summary-2009-the-standardish-group [Accessed:9th December 2012]

[9] Akuta, C. V. Inconsistent Policies and High Rate of abandoned government projects. 2009.Nigeria News. http://www.ngex.com/news/public/article.php?ArticleID=1343

[10] Ayodele, E.O., Alabi, O. M. Abandonment of Construction Projects in Nigeria: Causes and Effects; Journal ofEmerging Trends in Economics and Management Sciences (JETEMS), Vol. 2, 2011.Iss. 2, pp. 142-145.

[11] El-Rufai, N.A. The tragedy of abandoned projects. Nigeria Intel. 2012. http://www.nigeriaintel.com

[12] Abbasi, Y. G., Al-Mharmah. ‘Project management practice by the public sector in a developing country’ International Journal of Project Management, 18 (2000). No3, pp105-109.

[13] Poon, J., Potts, K., Cooper, P. Identification of Success Factors in the Construction Process. A Conference Paper Delivered at COBRA (2001) Cutting Edge and ROOTS Conference.

[14] White, D., Fortune, J. ‘Current practice in project management - an empirical study’ International Journal of Project Management, 20 (2002) No.6, pp.1-11.

[15] Baccarini, D., Collins, A. Critical Success Factors for Projects, In Brown, A. (ed), Surfing the Waves: Management Challenges; Management Solutions. Proceedings of the 17th ANZAM Conference, (2003) .2-5 December, Fremantle, Western Australia.

[16] Arnaboldi M., Azzone G., Savoldelli A ‘managing public sector project: the case of the Italian Treasury Ministry’ International Journal of Project management, 22.(2004). No.3, pp213-223.

[17] Saqib, M., Farooqui, R.U., Lodi, S.H. Assessment of Critical Success Factors for Construction Projects in Pakistan. First International Conference on Construction in Developing Countries (ICCIDC-1)”Advancing and Integrating Construction Education, Research and Practice, ., 2008 Karachi, Pakistan, 392-404.

[18] Idoro, G. I., Patunola-Ajayi, J. B. ‘Evaluating the strategies for marketing project management system in the Nigerian construction industry’, Nordic Journal of Surveying and Real Estate Research, 6 (2009). No.2, pp.25-36.

[19] Ogwueleka, A. The Critical Success Factors Influencing Project Performance in Nigeria. International Journal of Management Science and Engineering Management, 6. (2011) No.5, 343-349.

[20] Omran, A., Abdulbagei, M.A., and Gebril, A.O. An Evaluation of the Critical Success Factors for Construction Projects in Libya”. International Journal of Economic Behaviour, 2, (2012)pp 17-25.

[21] Yong, Y.E., Mustaffa, N.E. Analysis of Factors Critical to Construction Project Success in Malaysia. Engineering, Construction and Architectural Management, 19. (2012) No. 5, 1-13.

[22] Ejaz, N., Hussain, J., Shabbir, F., Shamim, M.A., Naeem , U.A., Tahir, M.F. Assessment of Most Critical Success Factors for Mega Construction Projects in Pakistan. Life Science Journal, 10. (2013) No. 10, 255-261.

[23] Luthans, F., Davis, T.R.V. ‘An Idiographic Approach to Organizational Behavior research:The Use of Single Case Experimental Designs and Direct Measures’, Academy of Management Review, JSTOR, 1982 http://www.jstor.org.ezproxy.liv.ac.uk/stable/pdfplus/257330.pdf

[24] Sarantakos, S. Social Research, Palgrave. New York. 1988.

25] Leedy P.D. Practical research. New York: Macmillan Publishing. 1980

[26] Hasan, M. Kerr, R.M.”The relationship between total quality management practices and organisational performance in service organisations”. The TQM Magazine, Vol.15. (2003) Number 4. Pp 286-291.

[27] Shuttleworth, M. Construct Validity - Does the Concept Match the Specific Measurement? 2009. Explorable. com: https://explorable.com/construct-validity

[28] Nunnally, J.C. Psychometric Theory. 2nd Edition, McGraw-Hill, New York., 1978.

[29] Idrus, A., Sodangi, M. Framework for Evaluating Quality Performance of Contractors in Nigeria. International Journal of Civil and Environmental Engineering, 10. (2010) No. 01:34-39.

[30] Ibrahim, A. D. Investigating Into the Knowledge Requirements of Nigerian Quantity Surveyors to Meet FutureChallenges. 25th Biennial Conference of The NIQS, 2011 pp. 7-18. Abuja: NIQS.

[31] Bave las, A. “Project echo: Use of projective techniques to define reality in different cultures”, Stanford University. 1968

[32] Emuze, F. A. Performance Improvement in South African Construction. South Africa: PhD Thesis NMMU. 2011

[33] Usman, N. A., Inuwa, I. I., Iro, A. I., Dantong, J. S. Training of Contractors Craftsmen for Productivity Improvement in the Nigerian Construction Industry. Journal of Engineering and Applied Sciences, 4, (2012) 1-12.

[34] Iro, A. I., Inuwa, I. I., Dantong, J. S. Investigation into Contractors Craftsmen Training in the Nigerian Construction Industry. International Journal of Engineering Research and Technology, 2 (2013) No1 pp1-6.

[35] Moser, C.A., Kalton, G. Survey methods in social investigation. UK: Heinemann Educational 1971.

[36] Field, A. Discovering Statistics, Using SPSS for Windows. Sage Publications, London., 2005.

[37] Kaiser, H. A second generation Little Jiffy. Psychometrikal, 35, (1970) 401-15.

[38] Bartlett, M.S. A note on the multiplying factors for various chi square approximations. Journal of the Royal Statistical Society, 16 (1954) (Series B), 296-8.

[39] Stevens, J. Applied multivariate statistics for the social sciences 5th edition. New York (N. Y.): Routledge. 2009

[40] Tabachnick, B.G., Fidell, L.S. Using Multivariate Statistics (5th Edn). Boston: Pearson Education. 2007

[41] Catell, R.B The Scree Test for Number Of Factors. Multivariate Behavioural Research, 1, , (1966) pp.245-76

[42] Horn, J. L. A rationale and test for the number of factors in factor analysis. Psychometrika, 30, (1965) 179-85

[43] Hubbard, R., Allen, S.J An empirical comparison of alternative methods for principal component extraction. Journal Of Business Research, 15, (1987). 173-90.

[44] Zwick, W.R., Velicer, W.F., Comparison of five rules for determining the number of components to retain. Psychological Bulleting, 99, (1986).432-42

[45] Abubakar, A. E., Grennwood, D., Osborne, A. A Study of Project Planning on Libyan Construction Projects. ARCOM Conference ., 2008 (pp. 789-798). Cardiff UK: Dainty, A. (Ed) Proceedings of the 24th Annual ARCOM Conference, 1-3 september, 2008.

[46] Krishnamurthy, K. G., Ravindra, S. V. Construction and Project Management: For Engineers, Planners and Builders. New Delhi: Satish Kumar J.2010.

[47] Chitkara, K. K., 2012. Construction Project Management: Planning, Scheduling & Controlling. New Delhi: Tata McGraw-Hill.

[48] Mbamali, I., Okotie, A. J. An Assessment of the Threats and Opportunities of Globalization on Building Practice in Nigeria. American International Journal of Contemporary Research, vol. 4 (2012) 143-150.

[49] Muazu, D. A., Bustani, S. A. A Comparative Analysis of Litigation Among Foreign and Indigenous Construction Firms in Nigeria. ATBU Journal of Environmental Technology, 3. (2004) No1: pp13-16.

[50] Aniekwu, A. N., Audu, H. O. The Effects of Management on Productivity: A Comparative Study of Indigenous and Foreign Firms in the Nigerian Construction Industry. Proceedings of West Africa Built Environment (WABER) Conference, 2010 (pp. 567-578). Accra-Ghana: WABER.

[51] Ekundayo, D., Jewell, C., Awodele, O. A. Executive Project Management Structure and the Challenges Facing its Adoption in the Nigerian Construction. International Journal of Architecture, Engineering and Construction. Vol.2. (2013) No.3 pp.158-169.

YBL Journal of Built Environment

The Journal of Szent István University, Ybl Miklós Faculty of Architecture and Civil Engineering

Journal Information

Metrics

All Time Past Year Past 30 Days
Abstract Views 0 0 0
Full Text Views 768 566 48
PDF Downloads 505 408 38